ciagent f503404dda docs(audit): fix .ciagent/ file discipline findings from v0.2 P01 audit
CIAgent audit (.ciagent/AUDIT_v0.2_P01.md) surfaced 3 .ciagent/ file
discipline issues. This commit addresses all 3:

1. config.json: re-add the 'workflow' top-level block. It was added in
   d10f89d (v0.1 milestone) and lost from main during the parallel-
   history resolution that produced origin/main's be9afa2 PR-#1 merge.
   The 4 standing rules (no_hitl, release_flow_per_phase, merge_strategy,
   branching) are restored.

2. PROJECT.md: add literal '## What This Is' and '## Key Decisions'
   section headers. The v0.1 audit-fix (f1c55ca) added the content
   inline but without the explicit headers, so the audit check missed
   them. The Key Decisions section summarizes D-011..D-018.

3. REQUIREMENTS.md: consolidate two overlapping REQ tables (the v0.1
   status table and the v0.2 traceability table) into a single
   canonical table covering all 40 REQs (REQ-001..REQ-040). Each row
   has REQ-ID, summary, priority, phase, status. v0.1 REQs show
   'Complete'; v0.2 REQs show 'Complete' (P01 shipped) or 'Pending
   (P##)'. The v0.1 Milestone Summary and v0.2 Milestone Summary
   sections are preserved below the table.

4. AUDIT_v0.2_P01.md: the audit report itself, with reconstruction
   state, file discipline table, branch hygiene, commit discipline,
   and the 3 findings above (plus non-blocking observations). The
   report's verdict: 'v0.2 P01 ship is healthy; 3 issues are
   paper-cleanup items addressed in this commit. None block P02
   EXECUTE.'

---ci---
project: orca
phase: 0
milestone: v0.2
status: fix
---/ci---
2026-06-03 22:19:45 +00:00

6.5 KiB
Raw Blame History

description, date, audit
description date audit
CIAgent audit report — v0.2 P01 mTLS ship + v0.1 backfill state 2026-06-03 ciagent-audit

Audit Report — v0.2 P01 mTLS Ship

Reconstruction: PASS

The project state is fully reconstructable from ---ci--- blocks in git log.

Reconstructed Timeline (newest first)

SHA Phase Milestone Status
f31bed2 8 v0.2 ship (v0.2.1)
1b14a5b 8 v0.2 verify
31ccb52 8 v0.2 execute (B/C/D wave)
181cc76 8 v0.2 execute (A wave)
bed5a2e 0 v0.2 plan
1ee82fc 0 v0.2 ideate
08d321f 0 v0.2 research
b48f5cf 0 v0.2 clarify
907f25e 0 v0.2 specify
e600e25 0 v0.1 complete
00127ce 7 v0.1 ship (security untrack)
b1b2e3d 7 v0.1 execute
4fd17c5 7 v0.1 execute
995892a 7 v0.1 ship (v0.1.7)
dc67522 7 v0.1 verify
477b08c 7 v0.1 execute
de69788 7 v0.1 execute
d10f89d 0 v0.1 execute (workflow block — see finding #1)
f1c55ca 0 v0.1 fix
37b6a14 0 v0.1 fix (entry-point)
939ce8b 6 v0.1 complete
d76ff84 0 v0.1 complete (v0.1.6/v0.2.0)

Reconstructed state matches the actual branch/HEAD state of main, milestone/v0.1-initial, and milestone/v0.2-networking-observability-security.

.ciagent/ File Discipline

File Status Notes
config.json ⚠️ Partial Valid JSON, top-level keys present, but workflow subfield MISSING (see finding #1)
PROJECT.md ⚠️ Partial Required sections present (Requirements, Constraints); What This Is and Key Decisions are referenced in the v0.1 audit-fix but the literal section headers are absent (see finding #2)
ROADMAP.md Pass v0.1 marked COMPLETE; v0.2 marked IN PROGRESS with 4 phases listed
REQUIREMENTS.md ⚠️ Issue Two overlapping REQ tables (see finding #3)
ARCHITECTURE.md Pass v0.2 sections (transport, doctor, certificate data model, 4 v0.2 flows) match the code structure under internal/transport, internal/doctor, internal/security
PLANS.md Pass 4 v0.2 phase plans present (P08P11) with REQ coverage and must-haves
PERSONAS.md Pass v0.2 personas documented (network-engineer, phase_specific assignments)
IDEATION.md Pass 30 v0.1 + 35 v0.2 ideas, 64 accepted
RELEASE_POLICY.md Pass 4 standing rules documented
PHASE{5,6}_VERIFICATION.md Pass Verifier artifacts present
PHASE7_SECURITY_AUDIT.md Pass P0 secret leak documented for human remediation

Branches

Branch Status Notes
main At bed5a2e (PLAN commit, v0.2 P00) Not yet merged with v0.2 milestone
milestone/v0.1-initial At 995892a (P07 ship) Frozen; v0.1 complete
milestone/v0.2-networking-observability-security At f31bed2 (P01 ship) Active; P01 shipped
phase/01..07 (v0.1) Local only; mostly not pushed P07 (v0.1) is on origin; P01-P06 either on origin (P01-P04) or local-only (P05, P06)
phase/08-mtls At 1b14a5b (verify) P01 verified; pre-ship SHA
phase/09-scheduling At f31bed2 P02 branch created, no work yet

Active work: phase/09-scheduling (P02). All other phase branches are either merged or frozen.

Commits

  • 54 total commits across all branches
  • 48 commits with ---ci--- block (89%)
  • 6 commits without ---ci--- block: 5 historical v0.1 ship commits (P02P04, predating the convention) + 1 external PR-#1 merge commit (be9afa2)
  • No unresolved escalations; no stale decisions older than the v0.1 milestone

P0 Findings (require remediation before v0.2 milestone→main ship)

Finding #1: config.json workflow block missing

The workflow block (added in d10f89d for v0.1) was lost from main during the parallel-history resolution. The v0.1 milestone branch has it; main does not. This is a real divergence that needs to be re-applied to main before merging the v0.2 milestone.

Remediation: Re-apply the workflow block to config.json on main. This is a one-commit fix (forward-merge the d10f89d change to the file alone).

Finding #2: PROJECT.md section header drift

The audit-fix in v0.1 (f1c55ca) added content to PROJECT.md describing "What This Is" and "Key Decisions" but used inline prose rather than literal ## What This Is and ## Key Decisions section headers. The content is there; the structural markers are not. The audit check fails to find them.

Remediation: Add literal ## What This Is and ## Key Decisions headers (or update the audit to match the inline style). Low priority.

Finding #3: REQUIREMENTS.md has two overlapping tables

The v0.1 audit-fix (f1c55ca) added a richer traceability table (with REQ-ID, summary, priority, status, phase, ideation-source) below the v0.1 status table. The v0.2 ideation agent's update flipped REQ-011/014/022/023 from "Deferred (v0.2)" to "Pending (v0.2 PXX)" in the v0.1 table but did NOT touch the new traceability table — so the same REQs appear in BOTH tables with different status wording.

Remediation: Consolidate to a single table. Either delete the v0.1 status table (preserving only the v0.2 traceability table), or update the v0.1 table to defer to the v0.2 table. Recommend the former: the v0.2 table is more informative.

Non-Blocking Observations

  • scripts/release.sh bug: The tea releases create call is missing --repo coreci/orca. Worked around in P01 by invoking tea directly. Worth a P0 fix in P03 (security-scan phase is a natural cleanup point).
  • 5 historical ship commits lack ---ci--- blocks: Predate the convention. The reconstructed state from git log is sufficient — these don't break reconstruction.
  • PR-#1 merge commit (be9afa2): External commit (not CI-generated); doesn't need a ---ci--- block.
  • P07 has a duplicate ship commit (56b4274 on phase branch, e96427b on milestone). Cosmetic; the content is the same.

Overall

  • Reconstruction: PASS (89% of commits have ---ci--- blocks; the rest are historical and don't break reconstruction)
  • .ciagent/ files: 3 issues, 1 P0, 2 cosmetic
  • Branches: clean (all active branches have recent work; no orphans)
  • Commits: clean (no stale decisions, no escalations)

Verdict: The v0.2 P01 ship is healthy. The 3 issues are paper-cleanup items that should be addressed in a follow-up commit before the v0.2 milestone→main merge. None of them block P02 EXECUTE.