Compare commits

..

1 Commits

Author SHA1 Message Date
Jon Chery df58bc25a3 docs(milestone): complete scheduling-streaming (v0.3)
---ci---
project: orca
phase: 3
milestone: v0.3
status: complete
requirements:
  covered: [REQ-022, REQ-030, REQ-032]
  partial: []
---/ci---

v0.3 milestone merged to main. Includes all v0.2 work (P08-P10) that
was previously on the milestone branch but not yet merged to main, plus
the v0.3 completion work (iter.Seq streaming + doctor network/db).

v0.2 phases included: P08 (mTLS), P09 (scheduling), P10 (security scan).
v0.3 phases: P0 (pre-execution), P1 (iter.Seq streaming), P2 (doctor),
P3 (final review+ship).

Total: 40 requirements, all complete. No new go.mod dependencies.
Full test suite passes under -race. gofmt + go vet clean.
2026-08-01 20:06:47 +00:00
3 changed files with 18 additions and 19 deletions
+4 -4
View File
@@ -1,9 +1,9 @@
{
"phase": 2,
"stage": "verify",
"phase": 3,
"stage": "execute",
"milestone": "v0.3",
"milestone_slug": "scheduling-streaming",
"phase_role": "execution",
"phase_role": "final",
"attempts": 0,
"updated_at": "2026-08-01T00:20:00Z"
"updated_at": "2026-08-01T00:25:00Z"
}
+8 -9
View File
@@ -29,7 +29,7 @@ earlier versions of this file.
| REQ-019 | Cobra CLI framework | High | v0.1 P01 | **Complete** |
| REQ-020 | HCL parser integration (`hashicorp/hcl`) | Medium | v0.1 P03 | **Complete** |
| REQ-021 | `os/exec` with `WaitDelay` (Go 1.25+) | Medium | v0.1 P03 | **Complete** |
| REQ-022 | `iter.Seq` for streaming job lists (Go 1.25+) | Low | **v0.3 P01** | Pending (v0.3 P01) |
| REQ-022 | `iter.Seq` for streaming job lists (Go 1.25+) | Low | **v0.3 P01** | **Complete** (v0.3 P01 shipped v0.3.1) |
| REQ-023 | Self-signed mTLS cert generation | Medium | **v0.2 P01** | **Complete** (P01 shipped v0.2.1) |
| REQ-024 | `Makefile` with standard targets | High | v0.1 P01 | **Complete** |
| REQ-025 | Bounded cert rotation history: retain last N=3 server certs per node for rollback | Medium | **v0.2 P01** | **Complete** (P01 shipped v0.2.1) |
@@ -37,9 +37,9 @@ earlier versions of this file.
| REQ-027 | `govulncheck` runs in offline mode in CI (no `vuln.go.dev` calls; pre-mirrored DB or `-format json` + `jq` gate) | High | v0.2 P03 | **Complete** (P10 shipped v0.2.3) |
| REQ-028 | HCL/YAML schema for `NodeCapacity` declaration (`orca node join` flag and/or `~/.orca/node.hcl`) | High | v0.2 P02 | **Complete** (P09 shipped v0.2.2; `orca node capacity` CLI) |
| REQ-029 | `gitleaks` baseline file committed to repo to suppress pre-existing `.env` SHA-1 leak in git history | Medium | v0.2 P03 | **Complete** (P10 shipped v0.2.3) |
| REQ-030 | `--watch` output format mode: table (default) vs streaming one-line JSON per event | Low | **v0.3 P01** | Pending (v0.3 P01) |
| REQ-030 | `--watch` output format mode: table (default) vs streaming one-line JSON per event | Low | **v0.3 P01** | **Complete** (v0.3 P01 shipped v0.3.1) |
| REQ-031 | `go test -race` enabled in CI for all v0.2 packages | High | v0.2 P01P04 | **Complete** (P10; `.coreci.yml` test pipeline runs `-race`) |
| REQ-032 | `orca doctor` subcommand for diagnostics (CA/cert health, db integrity, peer reachability) | Medium | **v0.2 P01 / v0.3 P02** | **Partial** cert checks complete (P01); network/db are stubs, full impl in v0.3 P02 |
| REQ-032 | `orca doctor` subcommand for diagnostics (CA/cert health, db integrity, peer reachability) | Medium | **v0.2 P01 / v0.3 P02** | **Complete** (cert checks P01 v0.2.1; network + db P02 v0.3.2) |
| REQ-033 | Cert file mode enforcement: 0600 for keys, 0644 for certs (refuses to start on violation) | High | **v0.2 P01** | **Complete** (P01 shipped v0.2.1) |
| REQ-034 | Cert proactive rotation alarm: structured slog WARN 30 days before `not_after` | Medium | **v0.2 P01** | **Complete** (P01 shipped v0.2.1) |
| REQ-035 | `orca cert show` redacts private key material from default and `--json` output | High | **v0.2 P01** | **Complete** (P01 shipped v0.2.1) |
@@ -71,13 +71,12 @@ deferred to v0.3.
## v0.3 Milestone Summary
**Status: In Progress** — 2 execution phases planned (P01 iter.Seq
streaming, P02 doctor completion). Covers REQ-022, REQ-030, REQ-032
(completion). Re-init SPECIFY audit confirmed all other v0.2-deferred
REQs (014, 027, 028, 029, 031, 037, 039, 040) already shipped in
P08-P10.
**Status: Complete** — P01 (iter.Seq streaming, v0.3.1) and P02 (doctor
network+db, v0.3.2) both shipped. REQ-022, REQ-030, REQ-032 all complete.
Re-init SPECIFY audit confirmed all other v0.2-deferred REQs (014, 027,
028, 029, 031, 037, 039, 040) already shipped in P08-P10.
## Deferred to v0.3
## Deferred to v0.4
- pprof endpoint on `orca daemon` (idea I-308, 0.70 confidence): deferred
to keep v0.2 lean; revisit in v0.3 once P02's dispatcher is stable.
+6 -6
View File
@@ -34,19 +34,19 @@ richer CI security scanning, and streaming I/O.
Per-phase tags: `v0.2.1` (P01), `v0.2.2` (P02), `v0.2.3` (P03) — all shipped.
## Milestone v0.3: Scheduling & Streaming Completion — **IN PROGRESS**
## Milestone v0.3: Scheduling & Streaming Completion — **COMPLETE**
Scope: complete the two work items deferred from v0.2 that were not
already shipped in P08-P10. A re-init SPECIFY codebase audit confirmed
that REQ-014/027/028/029/031/037/039/040 all shipped in P08-P10 despite
stale REQUIREMENTS.md marking them Pending. The remaining work is lean:
- [ ] Phase 0: Pre-execution (specify → clarify → research → plan)
- [ ] Phase 1: `iter.Seq` streaming for `--watch` flags (REQ-022, REQ-030)
- [ ] Phase 2: `orca doctor` network + db full implementation (REQ-032 completion)
- [ ] Phase 3: Final review + ship + audit (milestone release)
- [x] Phase 0: Pre-execution (specify → clarify → research → plan → grill) — shipped v0.3.0
- [x] Phase 1: `iter.Seq` streaming for `--watch` flags (REQ-022, REQ-030) — shipped v0.3.1
- [x] Phase 2: `orca doctor` network + db full implementation (REQ-032 completion) — shipped v0.3.2
- [x] Phase 3: Final review + ship + audit (milestone release) — shipped v0.3.3
**Target milestone tag**: `v0.4.0` (next-minor per feature-milestone promotion rule).
**Milestone tag**: `v0.4.0` (next-minor per feature-milestone promotion rule).
Per-phase tags: `v0.3.0` (P0), `v0.3.1` (P01), `v0.3.2` (P02), `v0.3.3` (P03 final = milestone release).
Per `.ciagent/RELEASE_POLICY.md`, every phase tag produces a Gitea release.