docs(P00): grill PASS (0.82) — 3 binding conditions, 3 phase challenges
---ci--- project: orca phase: 0 milestone: v0.10 status: grill ---/ci---
This commit is contained in:
@@ -0,0 +1,58 @@
|
||||
# Grill: v0.10 Docs & Install Milestone
|
||||
|
||||
## Verdict: PASS (confidence 0.82)
|
||||
|
||||
The plan is sound for a documentation + install-hardening milestone.
|
||||
No replan required. Three binding conditions adopted below.
|
||||
|
||||
## Axis review
|
||||
|
||||
### Scope justification — PASS
|
||||
The milestone closes a real gap (no CLI/jobspec/ingress docs, stale
|
||||
README, broken release pipeline) with a bounded scope (5 phases, no Go
|
||||
orchestration code changes). The v0.9 re-architecture shipped
|
||||
functionality without operator-facing docs; this milestone ships the
|
||||
docs. The install fix (P1) addresses a measured production bug
|
||||
(v0.4.5 install), not a speculative enhancement.
|
||||
|
||||
### Feasibility — PASS
|
||||
All tasks are markdown authoring (P2-P4) or bash script hardening (P1).
|
||||
No new dependencies, no schema changes, no Go code changes. The
|
||||
jobspecs in P3 must parse against the current parser — risk R1 is
|
||||
real but mitigated by validation before commit.
|
||||
|
||||
### Vertical slice integrity — PASS
|
||||
Each phase ships an independently valuable deliverable:
|
||||
- P1: install.sh works (resolves to a release with an asset)
|
||||
- P2: an operator can read the CLI/jobspec/ingress docs
|
||||
- P3: an operator can copy the examples and deploy a stack
|
||||
- P4: README + namespace.md are accurate
|
||||
- P5: milestone complete, merged, released
|
||||
|
||||
### Wave ordering — PASS
|
||||
P1 (Wave 1) unblocks all subsequent ship operations (each phase ship
|
||||
needs a correctly-asseted release). P2 + P3 (Wave 2) are parallel with
|
||||
no dependencies. P4 (Wave 3) depends on P2/P3 for cross-links. P5
|
||||
(Wave 4) depends on all.
|
||||
|
||||
### Risk register — PASS
|
||||
Three risks identified, all mitigated. R1 (jobspec parse drift) is the
|
||||
highest; mitigation is validation before commit. R2 (tea CLI asset bug)
|
||||
has a curl fallback. R3 (v0.8.15 still asset-less) is handled by
|
||||
install.sh's fallback walk.
|
||||
|
||||
## Binding conditions
|
||||
|
||||
| ID | Condition | Phase | Status |
|
||||
|----|-----------|-------|--------|
|
||||
| C-20 | Every jobspec in `examples/full-stack/` MUST parse with `internal/jobspec.ParseFile` and pass `internal/spec/schema.ValidatorFor(kind)` before P3 commits | P3 | pending |
|
||||
| C-21 | `scripts/release.sh` post-create asset verification MUST query the Gitea API and assert the tarball in attachments (not rely on `tea` exit code alone) | P1 | pending |
|
||||
| C-22 | Every factual claim in `docs/cli.md`, `docs/jobspec.md`, `docs/ingress.md` MUST be grounded in the live codebase (struct fields, flag definitions, paths) — verified by the docs-engineer persona before P2 commits | P2 | pending |
|
||||
|
||||
## Phase challenges
|
||||
|
||||
| ID | Challenge | Phase |
|
||||
|----|-----------|-------|
|
||||
| PC-11 | The jobspecs in P3 must not use fields that don't exist yet (e.g., `resources:` which lands in v0.11-P0c). Validate against the current `WorkloadSpec` struct. | P3 |
|
||||
| PC-12 | The rendered artifacts in P3 must match what the emitters actually produce, not an idealized version. Cross-check against `internal/emitter/` test fixtures. | P3 |
|
||||
| PC-13 | The README subcommand table must match `internal/cli/` exactly — no stale commands, no missing commands. | P4 |
|
||||
Reference in New Issue
Block a user