7535c8ceb0
NORTH_STAR alignment (Axis 1):
- G-Q1 BIND: AI-Agent Intent Share is an orphan target — NORTH_STAR:128
claims a placeholder view that PLAN P3 does not build (8 views listed,
none for it). No REQ-185..213 backs it. Violates "no fabrication."
- G-Q4 BIND: slide 7 cites D-122 but never tells the audience the "AI"
is a confidence-gated policy engine, not an LLM. Honesty buried in a
linked doc.
- G-Q5 BIND: derived metrics (FTE, ROI) computed on 0 production runs
shown on slide 12 without the zero-denominator caveat.
- G-Q6 BIND: NORTH_STAR:111 ("committed, not aspirational") contradicts
PO's "simply to target" + 0 consumers (PROJECT.md:495). 3 "grounded"
targets have non-existent scope (production estates). Reclassify to
partial (Cloud Spend precedent). NORTH_STAR-CHANGE trailer required.
Deck story & arc (Axis 2):
- G-Q8 BIND(minor): slide 1 preview is a table of contents, not a hook.
- G-Q9 BIND: 4 of 17 benefit callouts are filler (slides 1, 4, 12, 15).
- G-Q10 BIND(minor): slide 12 crams 6 metrics — split into two.
- G-Q11 BIND: slide 13 (deferred) invites the "can't prove ops healthy"
objection — add preempt.
Deck per-slide rigor (Axis 3):
- G-Q13 BIND: 3 of 13 transitions hand-waved (esp. Act 3→4 boundary 8→9).
- G-Q14 BIND: slide 9 (Telemetry Architecture) is the audience-loss slide.
- G-Q15 BIND(minor): slide 12 derived metrics lack formula + N=0 caveat.
- G-Q16 BIND: slide 15 ask is insider language, not a business decision.
PASS: G-Q2 (anti-goals, conditional on slide 3), G-Q3 (attestation
consistency — excellent), G-Q7 (arc order — marginal), G-Q12 (slide
openings — formulaic but substantive).
ESCALATE: E-003 (reclassify 3 targets to partial vs redefine "grounded"),
E-004 (AI-Agent Intent Share: 12–18mo target vs Future Horizons).
Verdict: REDUCE SCOPE / BINDING FIXES REQUIRED. 12 fixes, no re-architect;
1–2 phases of rework in P0 (NORTH_STAR) + P5 (deck). Critical path
unchanged. Confidence 0.80.
---ci---
status: grill
verdict: reduce-scope
binding_decisions:
- G-Q1: BIND (0.90) — add 9th placeholder view OR move AI-Agent Intent
Share to Future Horizons; correct NORTH_STAR:128
- G-Q4: BIND (0.85) — add D-122 honesty sentence to slide 7 Delivers
- G-Q5: BIND (0.82) — annotate derived metrics on slide 12 with
zero-run caveat
- G-Q6: BIND (0.80) — rewrite NORTH_STAR:111; reclassify 3 targets to
partial; regroup deck slide 5; NORTH_STAR-CHANGE trailer
- G-Q8: BIND (0.70) — add stake line with real number to slide 1
- G-Q9: BIND (0.78) — rewrite 4 filler closes (slides 1,4,12,15)
- G-Q10: BIND (0.68) — split slide 12 into two; deck -> 18 slides
- G-Q11: BIND (0.75) — add preempt to slide 13
- G-Q13: BIND (0.85) — rewrite 3 hand-waved transitions (8->9 critical)
- G-Q14: BIND (0.78) — compress slide 9 or reframe its Benefit to trust
- G-Q15: BIND (0.80) — show ROI formula + N=0 caveat on slide 12
- G-Q16: BIND (0.82) — reframe slide 15 ask as business decision
escalations:
- E-003: reclassify 3 "grounded" targets to partial vs redefine
"grounded" — PO decision on NORTH_STAR target framing (<0.60)
- E-004: AI-Agent Intent Share as 12–18mo target vs Future Horizons —
PO strategic-scope decision (<0.60)
898 lines
60 KiB
Markdown
898 lines
60 KiB
Markdown
# CIAgent Grill Report
|
||
|
||
## Run: 2026-07-27 19:30 (mode: interactive, focus: all)
|
||
|
||
### Verdict: Proceed with conditions (confidence: 0.72)
|
||
|
||
Two escalations must be resolved before the leadership pitch:
|
||
- **G-005 (risks):** 6 cloud capabilities (CAP-017..022) are deploy-unverified.
|
||
**RESOLVED (v1.11):** CAP-017..022 are now Verified live-aws via the
|
||
modules-lifecycle pipeline (apply/modify/destroy exit 0). The IAM-drift
|
||
framing is removed. See CAPABILITY_INVENTORY.md.
|
||
- **G-008 (budget):** No cost documentation exists despite live AWS resources.
|
||
**RESOLVED (v1.11):** COST.md now exists, documenting the v1.0→v1.10 spend
|
||
window + the v1.11 cost projection. The v1.14 P19 phase extends the
|
||
window to v1.11–v1.14.
|
||
|
||
The project is reclassified as an **OSS reference implementation** (G-003),
|
||
not a sponsored product. The grill's sponsor/ROI/budget/timeline axes apply
|
||
in weakened form; the adoption, architecture, and risks axes apply in full.
|
||
|
||
### Axis 1 — Business Case
|
||
- **Q1**: What problem does this actually solve, and is that problem still the top priority?
|
||
- Evidence: PROJECT.md:3-21 (vision + North Star); G-003 reframing (OSS reference)
|
||
- Answer: ACDL is an OSS reference implementation showing the shape of an agentic cloud delivery platform. The problem (cognitive load of infra + operational work of safe change) is documented in docs/vision.md.
|
||
- Confidence: 0.85
|
||
- Decision: G-003 — reframe as OSS reference implementation; no sponsor/ROI required.
|
||
- **Q2**: Who is the named executive sponsor, and when did they last make a decision under pressure?
|
||
- Evidence: MISSING (no named sponsor in any .ciagent/ file)
|
||
- Answer: Not applicable for an OSS reference implementation (G-003). Senior leadership requesting the pitch is interest, not sponsorship.
|
||
- Confidence: 0.85
|
||
- Decision: G-003 (carries forward).
|
||
- **Q3**: What happens to the business if the project is cancelled?
|
||
- Evidence: PROJECT.md:487 ("0 consumer adoption"); 10 milestones shipped with no consumers
|
||
- Answer: If cancelled, no consumer loses a deployed system. The reference value (clonable shape) persists in the repo. Cancellation cost is low — consistent with OSS reference framing.
|
||
- Confidence: 0.80
|
||
- Decision: G-003 (carries forward).
|
||
- **Q4**: Is the ROI calculated against a counterfactual?
|
||
- Evidence: MISSING (no ROI calculation anywhere)
|
||
- Answer: Not applicable for an OSS reference implementation. The bar is "is it a credible, demonstrable reference?" not "is there a paying customer?"
|
||
- Confidence: 0.85
|
||
- Decision: G-003 (carries forward).
|
||
|
||
### Axis 2 — Scope and Requirements
|
||
- **Q1**: Is the scope expanding, contracting, or genuinely stable?
|
||
- Evidence: ROADMAP.md (v1.0→v1.10, 55 phases); v1.7 added uptime-kuma + decommission + RDS; v1.9.x added decks; v1.10 added regression-class VERIFY + local emulators
|
||
- Answer: Expanding. The Out-of-Scope table (REQUIREMENTS.md:61-72) is scoped to v1.1 only; later milestones added scope without boundary updates.
|
||
- Confidence: 0.70
|
||
- Decision: G-010 — OSS scope is contributor-bounded; no out-of-scope table needed.
|
||
- **Q2**: Who owns the requirements, and have they been frozen?
|
||
- Evidence: REQUIREMENTS.md (115 REQs, REQ-01..REQ-115); config.json autonomy=full
|
||
- Answer: The user owns requirements via CLARIFY auto-resolution under full autonomy. Not frozen — each milestone adds REQs.
|
||
- Confidence: 0.70
|
||
- Decision: G-010 (carries forward).
|
||
- **Q3**: What is explicitly out of scope?
|
||
- Evidence: REQUIREMENTS.md:61-72 (v1.1 Out-of-Scope table only); PROJECT.md:42-51 (Domain Boundaries)
|
||
- Answer: Domain Boundaries section (PROJECT.md:42-51) defines durable out-of-scope: application business logic, IDE workflows, product backlog, node/OS-level compute. No per-milestone out-of-scope updates since v1.1.
|
||
- Confidence: 0.65
|
||
- Decision: G-010 — contributor-bounded scope accepted for OSS reference.
|
||
- **Q4**: Are there hidden requirements only disclosed late in delivery?
|
||
- Evidence: v1.10 milestone (decay disclosure, PROJECT.md:59-67) — 7 adapter defects undisclosed across 8 phases
|
||
- Answer: Yes — the v1.10 decay incident is a late-disclosed hidden requirement (reproducibility). D-091 regression gate is the mitigation.
|
||
- Confidence: 0.72
|
||
- Decision: G-007 (carries forward — milestone-level regression gate catches late-disclosed decay).
|
||
|
||
### Axis 3 — Architecture and Technical Feasibility
|
||
- **Q1**: Has the proposed architecture been validated by the people who will build and operate it?
|
||
- Evidence: PERSONAS.md (agent personas only); ARCHITECTURE.md (29KB); no human reviewer sign-off
|
||
- Answer: Validated by the agent that built it, not by a downstream platform team. Acceptable for an OSS reference (G-002 — Platform Team joins post-clone).
|
||
- Confidence: 0.72
|
||
- Decision: G-002 (carries forward).
|
||
- **Q2**: What is the integration surface?
|
||
- Evidence: ARCHITECTURE.md; adapters/ (terraform, wiz, kyverno, local emulators); contracts/ schema
|
||
- Answer: Contract schema (upstream) + engine adapters (downstream). Integration is bounded by the IR + PolicyCheckResult schemas.
|
||
- Confidence: 0.78
|
||
- Decision: (resolved by existing architecture; no new binding decision)
|
||
- **Q3**: Is there an existing system being replaced?
|
||
- Evidence: PROJECT.md:7-8 (vision: absorb cognitive load + operational work)
|
||
- Answer: ACDL replaces manual platform engineering + ticket-driven delivery. No existing system in this repo; downstream teams replace their own.
|
||
- Confidence: 0.75
|
||
- Decision: (resolved by G-002 white-label framing)
|
||
- **Q4**: What is the technical debt being inherited, and is it budgeted for?
|
||
- Evidence: v1.10 decay (7 adapter defects); D-091 regression gate at milestone completion (not per-phase)
|
||
- Answer: Diff-scoped VERIFY debt was paid down in v1.10. Per-phase regression gap is accepted debt (G-007).
|
||
- Confidence: 0.70
|
||
- Decision: G-007 — milestone-level regression gate is correct; inter-milestone decay is an accepted trade-off.
|
||
|
||
### Axis 4 — People, Skills, and Organization
|
||
- **Q1**: Which 2-3 people, if they left, would the project fail?
|
||
- Evidence: PERSONAS.md (agent personas); all binding decisions made by the user (D-034, D-090, G-001..G-012)
|
||
- Answer: One person — the user. Bus factor is 1.
|
||
- Confidence: 0.82
|
||
- Decision: G-011 — single-maintainer is normal for OSS reference; no action.
|
||
- **Q2**: Are the assigned resources actually allocated at the percentages claimed?
|
||
- Evidence: config.json (autonomy=full, max_concurrent_agents=5)
|
||
- Answer: The agent is the resource; allocation is 100% when invoked, 0% otherwise. No BAU fire-fighting claim to verify.
|
||
- Confidence: 0.78
|
||
- Decision: G-011 (carries forward).
|
||
- **Q3**: Is there a product owner with actual authority to prioritize?
|
||
- Evidence: config.json (autonomy=full, decision_confidence_threshold=0.6)
|
||
- Answer: The user is the product owner with absolute authority (full autonomy within user-locked constraints).
|
||
- Confidence: 0.80
|
||
- Decision: G-011 (carries forward).
|
||
- **Q4**: Is the team building capability they don't have?
|
||
- Evidence: RESEARCH.md (101KB); local emulating adapters (Phase 53) — capability was built and proven
|
||
- Answer: No — the agent built and verified the capability. Not a prototype-hoping-to-learn scenario.
|
||
- Confidence: 0.78
|
||
- Decision: (resolved by existing evidence)
|
||
|
||
### Axis 5 — Timeline and Estimates
|
||
- **Q1**: Was the deadline set before or after the scope was understood?
|
||
- Evidence: ROADMAP.md (v1.0 07-21 → v1.10 07-27, 6 days); no deadline documented anywhere
|
||
- Answer: No deadline. Milestones complete when the agent finishes committing.
|
||
- Confidence: 0.78
|
||
- Decision: G-006 — autonomous OSS build has no deadline; cadence is fine.
|
||
- **Q2**: What is the project's critical path?
|
||
- Evidence: MISSING (no critical path analysis)
|
||
- Answer: Not applicable — no deadline means no critical path to push.
|
||
- Confidence: 0.75
|
||
- Decision: G-006 (carries forward).
|
||
- **Q3**: Are the estimates evidence-based?
|
||
- Evidence: MISSING (no estimates; phases complete in agent-time)
|
||
- Answer: No estimates. The cadence is a function of agent speed, not engineering sizing.
|
||
- Confidence: 0.72
|
||
- Decision: G-006 (carries forward — acceptable for autonomous OSS reference).
|
||
- **Q4**: Is there a working definition of done?
|
||
- Evidence: VERIFY.md; AUDIT.md; 4-layer verify gate (structural, behavioral, security, quality)
|
||
- Answer: Yes — the 4-layer verify gate + regression gate (D-091) is the definition of done. "Done" is not "whatever the latest demo shows"; it is a gated, audited state.
|
||
- Confidence: 0.80
|
||
- Decision: (resolved by existing verify gate)
|
||
|
||
### Axis 6 — Budget and Financial Realism
|
||
- **Q1**: What percentage of the budget is already spent vs. remaining?
|
||
- Evidence: MISSING (no budget file in .ciagent/)
|
||
- Answer: Unresolved — no budget documented.
|
||
- Confidence: 0.50
|
||
- Decision: G-008 — ESCALATION.
|
||
- **Q2**: Are there predictable cost drivers not in the original budget?
|
||
- Evidence: config.json escalation_hooks (deploy, delete_data); CAP-013..016 verified against live AWS account 581513795199
|
||
- Answer: Yes — live AWS resources exist (S3 state, DynamoDB outbox, ECS, CloudFront). No cost driver documentation.
|
||
- Confidence: 0.60
|
||
- Decision: G-008 (carries forward — escalation).
|
||
- **Q3**: What's the burn rate, and how long until the money runs out?
|
||
- Evidence: MISSING
|
||
- Answer: Unresolved.
|
||
- Confidence: 0.40
|
||
- Decision: G-008 (carries forward — escalation).
|
||
- **Q4**: Is the budget contingent on something that hasn't happened yet?
|
||
- Evidence: MISSING
|
||
- Answer: Unresolved — likely contingent on the leadership pitch yielding a pilot platform team (G-001).
|
||
- Confidence: 0.55
|
||
- Decision: G-008 (carries forward — escalation).
|
||
|
||
### Axis 7 — Risks, Assumptions, and Dependencies
|
||
- **Q1**: What are the top 3 assumptions the plan rests on?
|
||
- Evidence: PROJECT.md:79-88 (CAP-017..022 IAM-gated); D-039 (OIDC federation deferred, blocked on go-gitea/gitea#36988); D-090 (no cap on re-verification sweep)
|
||
- Answer: (1) Terraform plan path proves deployability. (2) Local emulators prove runtime behavior. (3) Gitea OIDC will eventually merge.
|
||
- Confidence: 0.72
|
||
- Decision: (resolved by G-005 escalation)
|
||
- **Q2**: What are you dependent on outside the team?
|
||
- Evidence: PROJECT.md:79-88 (admin principal needed for IAM re-bootstrap); go-gitea/gitea#36988 (OIDC blocker)
|
||
- Answer: An admin AWS principal (for CAP-017..022) and the Gitea OIDC PR (for D-039 waiver closure).
|
||
- Confidence: 0.78
|
||
- Decision: G-005 (carries forward — escalation).
|
||
- **Q3**: What is the single risk that, if it materializes, kills the project?
|
||
- Evidence: CAPABILITY_INVENTORY.md §"Cloud capabilities NOT re-verified" (6 of 22 capabilities, 27%)
|
||
- Answer: The unverifiable deploy path for CAP-017..022. If the terraform plan path does not translate to a real deploy, 27% of advertised capability is fictional.
|
||
- Confidence: 0.80
|
||
- Decision: G-005 — ESCALATION.
|
||
- **Q4**: Have you done a pre-mortem?
|
||
- Evidence: MISSING (no pre-mortem document)
|
||
- Answer: No pre-mortem on file. The v1.10 decay incident is the closest thing to a post-mortem.
|
||
- Confidence: 0.65
|
||
- Decision: (flagged; no binding decision — user accepted autonomous governance in G-009)
|
||
|
||
### Axis 8 — Governance, Decision-Making, and Communication
|
||
- **Q1**: Who is the decision-maker when two executives disagree?
|
||
- Evidence: config.json (autonomy=full); no human governance body documented
|
||
- Answer: The user is the single decision-maker. No executive disagreement is possible because there is no executive body.
|
||
- Confidence: 0.78
|
||
- Decision: G-009 — autonomous CI is the governance.
|
||
- **Q2**: How often does governance meet, and what's the escalation pattern?
|
||
- Evidence: config.json (escalation_hooks: deploy, delete_data, merge_to_main; escalation_timeout_ms: 300000)
|
||
- Answer: Governance is event-driven (escalation hooks), not cadence-driven. 5-minute timeout.
|
||
- Confidence: 0.72
|
||
- Decision: G-009 (carries forward).
|
||
- **Q3**: What is being omitted from the status reports?
|
||
- Evidence: v1.10 decay disclosure (PROJECT.md:59-67) — 8 phases omitted the decay from status
|
||
- Answer: The v1.10 incident is direct evidence that status reports (decks) omitted material decay. D-094 (rewrite to verified reality) is the correction.
|
||
- Confidence: 0.75
|
||
- Decision: (resolved by D-094 + G-007 regression gate)
|
||
- **Q4**: Is there a "stop the project" trigger?
|
||
- Evidence: MISSING (no stop-trigger documented)
|
||
- Answer: No formal stop-trigger. The user is the single point of cancellation authority.
|
||
- Confidence: 0.68
|
||
- Decision: G-009 — autonomous CI is the governance; no human stop-trigger needed.
|
||
|
||
### Axis 9 — Change, Adoption, and Operational Readiness
|
||
- **Q1**: Who will use this, and what is in it for them?
|
||
- Evidence: PROJECT.md:487 ("0 consumer adoption"); G-001 (MVP for leadership pitch + pilot consumers)
|
||
- Answer: Pilot platform teams (post-pitch) will clone, customize, and deploy for their internal consumers. The value to them is a working reference shape.
|
||
- Confidence: 0.65
|
||
- Decision: G-001 — feature-complete MVP for pitch + pilot consumers in parallel.
|
||
- **Q2**: Is the operations/support team involved now or being handed a finished product?
|
||
- Evidence: MISSING (no Platform Team involvement in 55 phases); G-002 (white-label, out-of-repo)
|
||
- Answer: Intentionally out-of-scope — ACDL is white-label; Platform Team customization happens outside this repo.
|
||
- Confidence: 0.78
|
||
- Decision: G-002 — white-label; Platform Team customization is out-of-repo.
|
||
- **Q3**: What is the rollback plan if it goes wrong?
|
||
- Evidence: D-070 (decommission mode, 2-step pipeline with HITL SRE gates)
|
||
- Answer: Decommission mode exists for deployed stacks. For the reference repo itself, rollback = git revert (no production state to roll back).
|
||
- Confidence: 0.75
|
||
- Decision: (resolved by existing D-070 decommission mode)
|
||
- **Q4**: Has anyone validated the success criteria with the people who will judge success?
|
||
- Evidence: PROJECT.md (leadership pitch requested); no documented success-criteria validation with leadership
|
||
- Answer: The leadership pitch IS the validation moment. Success criteria for an OSS reference = "leadership says this is a credible shape."
|
||
- Confidence: 0.68
|
||
- Decision: G-001 (carries forward — pitch is the validation).
|
||
|
||
### Meta — Closing Review
|
||
- **Q1**: If you were the auditor, what would you flag?
|
||
- Evidence: This grill run
|
||
- Answer: (1) 6 unverifiable cloud capabilities (G-005). (2) No cost documentation (G-008). (3) Vision doc vs. OSS-reference framing tension (G-004 — resolved by keeping vision as target-state description).
|
||
- Confidence: 0.78
|
||
- Decision: (aggregated; G-005 + G-008 are the actionable flags)
|
||
- **Q2**: What is the project not doing that it should?
|
||
- Evidence: MISSING (no pre-mortem, no cost doc, no Platform Team engagement, no stop-trigger)
|
||
- Answer: Documenting the operating model (cost, deploy verification, governance) for a downstream team. The grill surfaced this across G-005, G-008, G-009.
|
||
- Confidence: 0.75
|
||
- Decision: (aggregated; G-005 + G-008 are the actionable items)
|
||
- **Q3**: What is the simplest possible version that could deliver 80% of the value?
|
||
- Evidence: ROADMAP.md (v1.1 spike, Phase 10, REQ-27 — core E2E proven); v1.2-v1.10 (45 phases of expansion)
|
||
- Answer: The v1.1 spike (contract → IR → terraform plan → Checkov → confidence → outbox) is the 80%-value version. The full 115-requirement build is accepted as the reference value (G-012).
|
||
- Confidence: 0.68
|
||
- Decision: G-012 — full catalog is the value; no minimal release needed.
|
||
- **Q4**: What would have to be true for this to succeed in the next 90 days, and is it true today?
|
||
- Evidence: G-001 (pitch + pilot); G-005 (IAM re-bootstrap); G-008 (cost doc)
|
||
- Answer: (1) Leadership pitch yields a pilot platform team — NOT TRUE today (pitch not yet delivered). (2) CAP-017..022 deploy path is verifiable — NOT TRUE today (G-005 escalation). (3) Cost operating model is documented — NOT TRUE today (G-008 escalation).
|
||
- Confidence: 0.72
|
||
- Decision: (aggregated; G-005 + G-008 + G-001 pitch are the 90-day conditions)
|
||
|
||
### Binding Decisions
|
||
| ID | Axis | Decision | Confidence |
|
||
|----|------|----------|-----------|
|
||
| G-001 | adoption | Feature-complete MVP for leadership pitch + pilot consumers in parallel; CIAgent builds, Platform Team deploys | 0.65 |
|
||
| G-002 | adoption | ACDL is white-label; Platform Team customization is out-of-repo; resolves ops-handoff concern | 0.78 |
|
||
| G-003 | business | Reframe as OSS reference implementation; no sponsor/ROI required | 0.85 |
|
||
| G-004 | business | Keep production-deployment vision; reference describes target state | 0.75 |
|
||
| G-005 | risks | ESCALATION — re-bootstrap IAM or mark CAP-017..022 deploy-unverified in decks | 0.80 |
|
||
| G-006 | timeline | Autonomous OSS build has no deadline; cadence acceptable | 0.72 |
|
||
| G-007 | architecture | Milestone-level regression gate is correct; system worked as designed | 0.70 |
|
||
| G-008 | budget | ESCALATION — add COST.md or document zero-cloud-cost operating model | 0.74 |
|
||
| G-009 | governance | Autonomous CI is the governance; no human stop-trigger needed | 0.68 |
|
||
| G-010 | scope | OSS scope is contributor-bounded; no out-of-scope table needed | 0.65 |
|
||
| G-011 | people | Single-maintainer is normal for OSS reference; no action | 0.70 |
|
||
| G-012 | meta | Full catalog is the value; no minimal release needed | 0.68 |
|
||
|
||
### Escalations
|
||
- **[G-005] risks** — 6 cloud capabilities (CAP-017..022: DynamoDB contracts table, Lambda contract-ingestor, ECS service live, CloudFront production stack, uptime-kuma, OIDC role) are deploy-unverified. The `acdl-spike-runner` IAM user cannot fix its own IAM (chicken-and-egg). Either re-bootstrap IAM with an admin principal to re-verify, or explicitly mark these 6 as "design-verified, deploy-unverified" in every leadership deck before the pitch. Resolves: project-killing risk (Axis 7 Q3).
|
||
- **[G-008] budget** — No cost documentation exists in `.ciagent/` despite live AWS resources (account 581513795199, CAP-013..016 verified). Either add a `COST.md` documenting monthly AWS spend, or explicitly document that ACDL runs at zero cloud cost (local emulators are the primary tier; live-AWS is a one-off spike per milestone). Resolves: financial-control gap (Axis 6 Q1-Q4).
|
||
|
||
---
|
||
|
||
## Run: 2026-07-29 20:25 (mode: adversarial, focus: v1.14 NFR plan)
|
||
|
||
### Verdict: FEASIBLE WITH BINDING DECISIONS (confidence: 0.72)
|
||
|
||
The v1.14 milestone is a sound, well-evidenced NFR sweep with a genuine,
|
||
traceable backlog. Not fundamentally infeasible. Four binding decisions
|
||
close plan defects + unverified assumptions that would otherwise re-expose
|
||
the v1.11 4-VPC failure mode. One escalation (E-001) auto-resolved at full
|
||
autonomy with assumption logging.
|
||
|
||
### 9-Axis scores
|
||
|
||
| Axis | Confidence | Forcing question (short) |
|
||
|------|-----------|---------------------------|
|
||
| 1 Business | 0.80 | Real backlog (5 P1 + 4 P2 + 6 swallowed errors + 15+ hardcoded IDs); cancellation survivable but inherits decay risk |
|
||
| 2 Scope | 0.70 | User-directed + frozen; P13 has a hidden feature door (implement vs remove); P2 conditional-child edges past wiring |
|
||
| 3 Architecture | 0.62 | P8 grep unsatisfiable for backend blocks; P8 state-bucket continuity unguarded; P9 IAM naming unverified; P4/P8 file overlap |
|
||
| 4 People | 0.85 | Agentic single-operator; runtime availability is the key-person risk |
|
||
| 5 Timeline | 0.68 | No deadline; 20-phase unverified span is the longest since G-007; P8 is the latent multi-phase-rework risk |
|
||
| 6 Budget | 0.85 | NFR-only, no new AWS resources; P8 re-creation is a one-shot accident not structural cost |
|
||
| 7 Risks | 0.60 | A1 (acdl-* naming unverified), A2 (fallback constant unbound), A3 (P4 gate hardening); kill-risk = P8 orphans state |
|
||
| 8 Governance | 0.72 | Full autonomy; no mid-milestone stop trigger; per-phase "green" ≠ "capabilities Verified" |
|
||
| 9 Adoption | 0.70 | No external users; rollback is git-level for code, AWS-state rollback unaddressed if P8 misfires pre-detection |
|
||
|
||
### Binding Decisions
|
||
|
||
| ID | Axis | Decision | Confidence |
|
||
|----|------|----------|-----------|
|
||
| G-101 | architecture | P8 grep scope amended to exclude terraform `backend "s3"` blocks (bucket arg is static-config-only, evaluated pre-init; cannot reference `data.aws_caller_identity`). Resource ARNs in policy/code ARE externalized; backend blocks stay literal or move to `-backend-config` (separate change). | 0.80 |
|
||
| G-102 | risks | P8 must bind `ACDL_AWS_ACCOUNT_ID` fallback to the live account ID (not a placeholder) AND the lifecycle workflow (full-mode jobs) must set `ACDL_AWS_ACCOUNT_ID` from `aws sts get-caller-identity` before any lifecycle invocation. No full-mode run proceeds with the env unset. | 0.78 |
|
||
| G-103 | scope | P13 must take the removal+documentation path (remove `--kube-version` + document deferral to GitOps reconciler roadmap), NOT the implementation path. Implementing version-aware policy selection is a new feature, violating D-095. | 0.85 |
|
||
| G-104 | architecture | P9 must verify (grep/audit of `modules/l1/*/terraform/main.tf` + `modules/l2/*/composition.json`) that every IAM role + KMS key created by the lifecycle pipeline matches `acdl-*` prefix before merge. CloudFront + WAFv2 (CloudFront scope) remain `Resource: "*"` with a documented global-ARN constraint. | 0.70 |
|
||
| G-105 | governance | P4's regression-gate hardening must be validated by running the full regression gate immediately after P4 lands (not deferred to P21). Gate must pass clean post-P4 before W2 begins. | 0.70 |
|
||
| G-106 | governance | A mid-milestone regression-gate checkpoint is added after W2 (P12), before W3 begins. Gate runs offline (D-091); a non-Verified result halts W3 until fixed. Not a re-litigation of G-007 (per-phase stays deferred) — a single checkpoint at the natural seam after the security wave. | 0.65 |
|
||
|
||
### Escalations
|
||
|
||
- **[E-001] risks** — P8 state-bucket continuity re-exposes the v1.11 4-VPC
|
||
root cause. G-102 proposes a binding mitigation (bind fallback + wire env
|
||
into workflow), but the residual risk (a future full-mode lifecycle run
|
||
with a misconfigured env orphans live state and re-creates resources)
|
||
cannot be reduced below 0.20 by plan-level decisions alone. **Auto-
|
||
resolved at full autonomy (D-101):** accept the residual risk; G-102's
|
||
binding mitigation (fallback bound to live account ID + workflow env
|
||
wiring) is the control. The lifecycle pipeline defaults to plan-only
|
||
(REQ-134) — full-mode runs are workflow_dispatch only, reducing the
|
||
accident surface. If the user prefers zero residual risk, direct that
|
||
P8 exclude the state-bucket name from externalization entirely
|
||
(externalize only resource ARNs, leave the backend `bucket` literal).
|
||
Confidence 0.55; auto-resolved per `config.autonomy.level=full`.
|
||
|
||
---
|
||
|
||
## Run: 2026-07-30 (mode: interactive, focus: v1.15-Nova rebrand, all 9 axes)
|
||
|
||
### Verdict: Proceed with conditions (confidence: 0.82)
|
||
|
||
A Major/breaking rebrand (ACDL → Nova) across prose, decks, code, env vars,
|
||
consumer path, SSM path, AWS tag keys, and AWS resource names — 4 execution
|
||
phases + 1 final. The plan is technically sound and the scope is user-directed
|
||
(D-102..D-112). Three binding mitigations surfaced (G-104, G-106, G-108); the
|
||
rest accept the plan as written. Two findings carry residual risk that is
|
||
accepted at full autonomy (G-103, G-107). No escalations remain open — all
|
||
auto-resolved with assumption logging per `config.autonomy.level=full`.
|
||
|
||
The single most material correction: **the versioning scheme was wrong**.
|
||
The plan tagged a Major/breaking milestone on the v1.14.x PATCH line
|
||
(`v1.14.5` = release), contradicting every prior breaking milestone in the
|
||
project (v1.1→v1.2.0, v1.5→v1.5.0, v1.11→v1.11.0 — all minor bumps). The
|
||
quoted "Major = progressive minor per phase" rule does not exist in any repo
|
||
file. **G-104 binds: re-tag as v1.15.x minor-bumped phases** (P1→v1.15.0 …
|
||
P5→v1.15.4, with v1.15.4 IS the milestone release).
|
||
|
||
### Per-axis findings
|
||
|
||
#### Axis 1 — Feasibility
|
||
**Challenge:** Can the full rebrand (1,465 `ACDL`/`acdl` occurrences across 205
|
||
files, 21 env vars, 11 AWS resources, 5 tag keys, 67 SSM refs, 23 consumer-path
|
||
refs) actually be done in 4 execution phases? The migration ordering
|
||
(docs→code/env→SSM/tags→AWS resources→final) is sound: P1 has no runtime impact,
|
||
P2's dual-read fallback prevents deployment breakage, P3's parallel-tag period
|
||
prevents ABAC lockout, P4's staged terraform migration prevents a big-bang
|
||
failure. The phase dependencies (P2 depends on P1's migration guide; P3 depends
|
||
on P2's dual-read + nova_tagging warn mode; P4 depends on P3's hard-mode tag
|
||
enforcement; P5 depends on all) are correctly ordered. **Confidence 0.85** that
|
||
the 4-phase structure is feasible. The `terraform init -migrate-state` approach
|
||
for the state bucket is the documented, correct mechanism (back up state JSON
|
||
first). No hidden dependencies found: the `.env.secrets` direct-read path
|
||
(G-106) and the Gitea secrets rotation (G-108) are the only mechanic gaps, both
|
||
now bound. **Verdict: ACCEPT-AS-IS.** **G-103.**
|
||
|
||
#### Axis 2 — Scope
|
||
**Challenge:** Is the full AWS resource rename WITH migration (downtime
|
||
accepted) over-scoped for a rebrand? D-102 locked this as user-directed. The
|
||
alternative (rename code only, leave AWS resources as `acdl-*`) would leave a
|
||
permanent brand inconsistency between code and cloud — acceptable for an NFR
|
||
patch, not for a "Major/breaking" milestone. The S&P visual theme is correctly
|
||
out of scope (D-107). The real Gitea repo name stays `acdl` (D-105) — sensible
|
||
(repo rename is a separate operational burden). Past Gitea release titles stay
|
||
`ACDL vX.Y.Z` (forward-only) — sensible (no history rewrite). Git branch/tag
|
||
naming has no brand name (D-112) — sensible. **Missing from scope:** the CI
|
||
workflow secret-references (`.gitea/workflows/*` `secrets.ACDL_*`) — P2 task 3
|
||
creates `NOVA_*` Gitea secrets but the plan does not show the workflow YAML
|
||
`secrets:` references being updated; G-108 binds the mitigation. **Confidence
|
||
0.80.** **Verdict: ACCEPT-AS-IS.** **G-104** (versioning — see Axis 5).
|
||
|
||
#### Axis 3 — Cost
|
||
**Challenge:** What's the real cost (downtime, person-hours, risk) and is it
|
||
justified for a *rebrand*? Per A1 (conf 0.9), no live AWS apply during P0–P4 —
|
||
so the migration scripts are authored but not executed; the live apply is an
|
||
operator runbook step. Person-hours are the agent's own (autonomous OSS
|
||
reference, G-003 carries forward). Downtime is accepted (D-102) but deferred to
|
||
the operator runbook. Token cost: the 1,465-occurrence rename across 205 files
|
||
is a large but mechanical edit — the explore survey already quantified the
|
||
mechanical-vs-judgment split. The risk cost (DynamoDB data loss, state bucket
|
||
corruption, ABAC lockout) is mitigated by the staged ordering + dual-read +
|
||
parallel-tag — all plan-validated, not live-applied. For an OSS reference with
|
||
0 consumer adoption (PROJECT.md:487), the cost is bounded. **Confidence 0.80.**
|
||
**Verdict: ACCEPT-AS-IS.** **G-105.**
|
||
|
||
#### Axis 4 — Schedule / risk
|
||
**Challenge:** DynamoDB data loss, state bucket migration, ABAC breakage,
|
||
consumer disruption. The mitigations: (a) DynamoDB scan+copy with row-count
|
||
verification, keep old tables until verified (manual post-verification deletion
|
||
— point of no return documented); (b) state bucket `terraform init
|
||
-migrate-state` with state JSON backup first; (c) parallel-tag ABAC period
|
||
(emit nova:* + acdl:* → swap policy → remove acdl:*); (d) consumer disruption
|
||
mitigated by the dual-read fallback (P2–P4) + the migration guide (P1). The top
|
||
3 assumptions: A1 (no live apply — conf 0.9, verified by the established
|
||
v1.11–v1.14 pattern), A2 (.env.secrets keys renamed, values stay — conf 0.85,
|
||
now bound by G-106), A3 (Gitea release API reachable — conf 0.8, verified HTTP
|
||
200). The single risk that could kill the project: state bucket corruption
|
||
during `-migrate-state` — mitigated by the backup-first runbook step. No
|
||
pre-mortem beyond the runbook is documented, but the staged ordering IS the
|
||
de-facto pre-mortem mitigation. **Confidence 0.78.** **Verdict: ACCEPT-AS-IS.**
|
||
**G-106.**
|
||
|
||
#### Axis 5 — Technical soundness
|
||
**Challenge:** Is the dual-read fallback design sound? Is the parallel-tag ABAC
|
||
migration safe? Is `terraform init -migrate-state` correct? **Dual-read:**
|
||
sound in principle (NOVA_X preferred, ACDL_X fallback), BUT the `.env.secrets`
|
||
load path bypasses the `core/env.py` helper — `run_platform.sh:288-289` exports
|
||
`$ACDL_AWS_ACCESS_KEY_ID` (hardcoded) and `regression_verify.py:309-312`
|
||
parses the file matching `k == "ACDL_AWS_ACCESS_KEY_ID"` (hardcoded). If P2
|
||
renames the `.env.secrets` keys to `NOVA_*` but these two readers still read
|
||
`ACDL_*`, AWS creds vanish → CAP-013/014/015 (which need live creds for
|
||
terraform plan) break → regression gate breaks. **G-106 binds: dual-read in
|
||
BOTH load paths** (shell export + Python parser must read NOVA_* first, ACDL_*
|
||
fallback, mirroring the helper contract). **Parallel-tag ABAC:** safe — emit
|
||
both tag sets, swap policy with acdl:* as secondary condition, verify, remove.
|
||
Plan-validated only per A1 (live ABAC stays acdl:* until operator runbook).
|
||
**`terraform init -migrate-state`:** correct documented mechanism; backup state
|
||
JSON first is the binding safety step. **Versioning contradiction:** the plan
|
||
tags a Major milestone on the v1.14.x PATCH line — G-104 binds re-tag as
|
||
v1.15.x minor-bumped. **Confidence 0.85.** **Verdict: MITIGATE-BINDING (G-106).**
|
||
**G-104, G-106.**
|
||
|
||
#### Axis 6 — Testability / verifiability
|
||
**Challenge:** Can the success criteria actually be verified? Will the
|
||
regression gate stay 16/16 across a 1,465-occurrence rename? Is `grep -rni ACDL`
|
||
returning 0 realistic? The gate-stays-16/16 binding constraint (PLAN.md:44-49)
|
||
requires per-phase fixture updates — P2 updates env-var fixtures, P3 updates
|
||
SSM/tag fixtures, P4 updates terraform-name fixtures. The dual-read fallback
|
||
test (P2) keeps ACDL_* as the fallback source — this is the ONE allowed
|
||
exception to the grep-returns-0 criterion (success criterion 6 exempts it).
|
||
`mmdc` (mermaid CLI) is NOT on PATH, but `npx --yes @mermaid-js/mermaid-cli` IS
|
||
available (verified exit 0) and the deck README documents the render command
|
||
(line 270) with `puppeteer-config.json` for no-sandbox — so the 5 `.mmd` PNG
|
||
re-exports in P1 task 3 are feasible. The Gitea secrets rotation (P2 task 3)
|
||
was verified: API reachable (HTTP 200), token present, `rotate_spike_key.sh`
|
||
pattern exists. **Confidence 0.82.** **Verdict: ACCEPT-AS-IS.** **G-107.**
|
||
|
||
#### Axis 7 — Security
|
||
**Challenge:** Does the rebrand introduce a security regression? (a) ABAC
|
||
policy swap window — mitigated by the parallel-tag period (nova:* + acdl:*
|
||
both valid → swap → remove); plan-validated only, no live window during P0–P4.
|
||
(b) Secret rotation — `.env.secrets` keys renamed (values stay, no
|
||
re-rotation needed until P5); G-106 binds the dual-read in both load paths so
|
||
creds don't silently vanish. (c) `.env.secrets` key rename — the file contains
|
||
live rotated AWS creds + a Gitea token; renaming keys is cosmetic (same values)
|
||
but the load-path readers must follow (G-106). (d) IAM policy scope (v1.14 P9
|
||
scoped `Resource: "*"`) — the rebrand renames `acdl-*` ARNs to `nova-*` in
|
||
terraform; the IAM policy `Resource` patterns must be updated to `nova-*` —
|
||
P4 task 2 covers this (`acdl-spike-runner` → `nova-spike-runner`). No new
|
||
security regression introduced; the rebrand is nomenclature, not a permission
|
||
change. **Confidence 0.80.** **Verdict: ACCEPT-AS-IS.** **G-108.**
|
||
|
||
#### Axis 8 — Maintainability
|
||
**Challenge:** Will the dual-read fallback + parallel-tag period create
|
||
technical debt that's hard to clean up? Is P5 (remove fallback) realistic? The
|
||
dual-read (P2) + parallel-tag (P3) IS technical debt by design — it exists to
|
||
be removed in P5. P5 does six things in one phase (remove fallback, hard-fail
|
||
acdl:*, delete Gitea ACDL_* secrets, remove .env.secrets legacy comment,
|
||
multi-persona review + audit, milestone ship). The risk: P5's removal surfaces
|
||
a break if P2–P4 didn't catch every ACDL_* reference in the platform's OWN CI
|
||
workflows. But P5 is mechanical cleanup: `get_env()` drops the fallback branch,
|
||
shell scripts drop `:-$ACDL_X`, `nova_tagging.py` flips warn→hard-fail. The
|
||
grep-returns-0 success criteria are verifiable. The 0-consumer-adoption state
|
||
(PROJECT.md:487) means no external consumer breaks at P5; only the platform's
|
||
own CI must be fully migrated by P4. **Confidence 0.78.** **Verdict:
|
||
ACCEPT-AS-IS.** **G-109.**
|
||
|
||
#### Axis 9 — Adversarial
|
||
**Challenge:** Worst-case scenario? What breaks first? Rollback plan if P4
|
||
goes wrong mid-flight? **Worst case:** the `terraform init -migrate-state`
|
||
corrupts the state bucket JSON and the backup was incomplete — you lose
|
||
terraform state for the microservice + static-assets stacks. **Mitigation:**
|
||
the runbook binds "back up the state JSON first" before each `-migrate-state`;
|
||
keep old DynamoDB tables until verified (manual post-verification deletion =
|
||
the point of no return). The staged ordering (KMS alias → SNS/SG → Lambda →
|
||
DynamoDB → ECR → IAM → state bucket → ALB last) means a mid-flight failure at
|
||
any step leaves prior steps intact and old resources still named `acdl-*`. The
|
||
dual-read fallback (P2–P4) means the runtime tolerates both `acdl-*` and
|
||
`nova-*` during the window — so a partial migration doesn't break the running
|
||
platform. **What breaks first:** the `.env.secrets` load path (G-106) — if the
|
||
key rename + reader update are misaligned, AWS creds vanish and the regression
|
||
gate breaks immediately. G-106 binds the mitigation. **Rollback:** the runbook
|
||
is the rollback; the staged ordering with "keep old until verified" is the
|
||
safety net. ALB recreate (last, brief downtime) is the only hard-downtime step;
|
||
rollback = recreate the old ALB. **Confidence 0.75.** **Verdict: ACCEPT-AS-IS.**
|
||
**G-110.**
|
||
|
||
### Binding decisions (G-103..G-110)
|
||
|
||
| ID | Axis | Decision | Confidence | Rationale |
|
||
|----|------|----------|-----------|-----------|
|
||
| G-103 | 1 (Feasibility) | ACCEPT-AS-IS | 0.85 | 4-phase structure is feasible; migration ordering (docs→code/env→SSM/tags→AWS→final) is sound; phase dependencies correctly ordered; `terraform init -migrate-state` is the correct mechanism. |
|
||
| G-104 | 2/5 (Scope/Technical) | MITIGATE-BINDING | 0.90 | **Re-tag as v1.15.x minor-bumped phases** (P1→v1.15.0 … P5→v1.15.4, v1.15.4 IS the milestone release). The v1.14.x PATCH-line scheme contradicts every prior breaking milestone (v1.1→v1.2.0, v1.5→v1.5.0, v1.11→v1.11.0). The quoted "Major = progressive minor per phase" rule exists in NO repo file. A Major/breaking milestone shipping as v1.14.5 means the semver MAJOR never advances despite a breaking change — consumers on `@v1` silently absorb the rebrand. Update PLAN.md, ROADMAP.md §v1.15, PROJECT.md §v1.15, and ARCHITECTURE.md §v1.15 Addendum tag references. |
|
||
| G-105 | 3 (Cost) | ACCEPT-AS-IS | 0.80 | No live AWS apply during P0–P4 (A1); migration scripts authored, not executed; downtime accepted (D-102) but deferred to operator runbook. For an OSS reference with 0 consumer adoption, cost is bounded. |
|
||
| G-106 | 4/5 (Risk/Technical) | MITIGATE-BINDING | 0.88 | **Dual-read in BOTH `.env.secrets` load paths.** `run_platform.sh:288-289` (`export AWS_ACCESS_KEY_ID="$ACDL_AWS_ACCESS_KEY_ID"`) and `regression_verify.py:309-312` (parses file matching `k == "ACDL_AWS_ACCESS_KEY_ID"`) bypass the new `core/env.py get_env()` helper. P2 MUST update both readers to read `NOVA_*` first with `ACDL_*` fallback — mirroring the dual-read contract. Without this, renaming `.env.secrets` keys to `NOVA_*` breaks AWS creds → CAP-013/014/015 fail → regression gate breaks. Old `ACDL_*` keys removed in P5. |
|
||
| G-107 | 6 (Testability) | ACCEPT-AS-IS | 0.82 | Per-phase fixture updates keep the gate 16/16 (PLAN.md:44-49 binding constraint). `npx --yes @mermaid-js/mermaid-cli` is available (verified) for the 5 PNG re-exports in P1. Gitea API reachable (HTTP 200) + token present for P2 task 3. |
|
||
| G-108 | 7 (Security) | MITIGATE-BINDING | 0.80 | **P2 task 3 must update the CI workflow `secrets:` references** (`.gitea/workflows/*`, `.github/workflows/*`) when `NOVA_*` Gitea secrets are created, with graceful degrade + retry on API failure. The plan creates `NOVA_*` aliases but does not show the workflow YAML `secrets.ACDL_*` references being updated. If the workflows still reference `ACDL_*` secrets at P5 (when old secrets are deleted), CI breaks. The Gitea secrets rotation must be a hard gate with retry-on-failure (not a silent skip). |
|
||
| G-109 | 8 (Maintainability) | ACCEPT-AS-IS | 0.78 | P5 is mechanical cleanup (drop fallback branch, hard-fail acdl:*, delete old secrets); 0-consumer-adoption means no external break at P5; grep-returns-0 is verifiable. |
|
||
| G-110 | 9 (Adversarial) | ACCEPT-AS-IS | 0.75 | Runbook + staged ordering is the rollback; "keep old until verified" is the safety net; ALB recreate (last) is the only hard-downtime step. The `.env.secrets` load path (G-106) is what breaks first if misaligned — G-106 binds the mitigation. |
|
||
|
||
### Escalations
|
||
|
||
None remain open. All material questions resolved with confidence ≥ 0.60.
|
||
Two findings carry accepted residual risk (auto-resolved at full autonomy
|
||
with assumption logging):
|
||
|
||
- **G-103 (Axis 1):** residual risk that the 4-phase structure underestimates
|
||
the 1,465-occurrence rename effort — accepted; per-phase fixture updates
|
||
(G-107) + the explore survey's mechanical-vs-judgment split bound the effort.
|
||
- **G-107 (Axis 6):** residual risk that a test fixture is missed during the
|
||
per-phase rename, breaking 16/16 at a phase boundary — accepted; the
|
||
per-phase verify step (run the gate before tagging) catches it before ship.
|
||
|
||
### Forcing questions asked (7)
|
||
|
||
1. **Versioning contradiction** — Major milestone on v1.14.x PATCH line vs.
|
||
prior breaking milestones all minor-bumped. → **G-104 MITIGATE-BINDING**
|
||
(re-tag as v1.15.x).
|
||
2. **P4 migration completeness** — plan-validated terraform vs live AWS
|
||
resources still `acdl-*`. → **G-103/105 ACCEPT-AS-IS** (runbook for live).
|
||
3. **`.env.secrets` key rename mechanic** — dual-read helper bypassed by direct
|
||
shell/Python readers. → **G-106 MITIGATE-BINDING** (dual-read in both load
|
||
paths).
|
||
4. **Gitea secrets rotation** — API reachable, token present, but workflow
|
||
`secrets:` references not shown updated. → **G-108 MITIGATE-BINDING** (update
|
||
workflow refs, hard gate + retry).
|
||
5. **ABAC parallel-tag window** — over-engineered for 0 consumers, or correct
|
||
forward-looking safety net? → **G-108/Axis-4 ACCEPT-AS-IS** (parallel-tag is
|
||
the mitigation, plan-validated).
|
||
6. **Regression gate during rebrand** — 16/16 across 1,465-occurrence rename?
|
||
→ **G-107 ACCEPT-AS-IS** (per-phase fixture updates).
|
||
7. **P5 fallback removal realism** — cleanup + review + audit + ship in one
|
||
phase? → **G-109 ACCEPT-AS-IS** (mechanical cleanup).
|
||
8. **P4 rollback plan** — runbook + staged ordering sufficient? → **G-110
|
||
ACCEPT-AS-IS** (staged ordering is the rollback).
|
||
|
||
### What the project is NOT doing that it should (adversarial close)
|
||
|
||
- **Documenting the versioning rule it now follows.** G-104 binds the
|
||
v1.15.x minor-bumped scheme, but no `.ciagent/` file records the
|
||
versioning convention. The plan should add a one-line versioning note to
|
||
PROJECT.md §v1.15 or a `VERSIONING.md` so the next milestone doesn't
|
||
re-litigate this.
|
||
- **Quantifying the live state volume** for the DynamoDB scan+copy + state
|
||
bucket migration. The runbook says "back up first" + "verify row counts" but
|
||
doesn't quantify the data. For 0-consumer-adoption, this is likely tiny —
|
||
but the rollback feasibility (G-110) depends on it being small enough to
|
||
re-scan. Accepted residual risk.
|
||
|
||
### Simplest 80%-value version
|
||
|
||
The simplest version that delivers 80% of the rebrand value: **P1 (docs/decks)
|
||
+ P2 (code/env dual-read) + P5 (ship)** — skip the live AWS resource migration
|
||
(P3 SSM/tags + P4 AWS resources) entirely. The code + docs would say Nova; the
|
||
cloud would still say `acdl-*`. This is the "rename code only, leave cloud"
|
||
option D-102 rejected. The user chose the full migration (D-102) — the binding
|
||
decision is recorded; the 80% version is NOT the chosen path. The full scope is
|
||
accepted as user-directed.
|
||
|
||
### What must be true for success in the next 90 days, and is it true today?
|
||
|
||
1. **The dual-read helper + both `.env.secrets` load paths are updated in
|
||
lockstep (G-106).** — TRUE after P2 binds G-106; FALSE today (the direct
|
||
readers still hardcode `ACDL_*`).
|
||
2. **The regression gate stays 16/16 at every phase boundary (G-107).** —
|
||
TRUE if per-phase fixture updates are complete before each tag; the
|
||
per-phase verify step enforces it.
|
||
3. **The CI workflow `secrets:` references are updated when `NOVA_*` Gitea
|
||
secrets are created (G-108).** — FALSE today; P2 task 3 must be expanded to
|
||
include the workflow YAML updates.
|
||
4. **The versioning scheme is corrected to v1.15.x (G-104).** — FALSE today;
|
||
the plan says v1.14.x. Must be corrected before P0 ship.
|
||
|
||
The milestone can proceed once G-104, G-106, and G-108 mitigations are
|
||
incorporated into PLAN.md. Confidence 0.82.
|
||
|
||
---
|
||
|
||
# v1.16 NFR Simplification — Grill (2026-07-30)
|
||
|
||
**Griller:** ci-griller (glm-5.2). **Milestone:** v1.16 (NFR).
|
||
**Verdict:** PASS-with-binding (3 binding decisions G-111..G-113, 1
|
||
escalation E-002). The plan is evidence-grounded and does not re-litigate
|
||
v1.14 (D-117 clean). One load-bearing success criterion needed
|
||
correction before P9; two phase-entry clarifications for P9/P12/P13;
|
||
one wording escalation deferred to P21.
|
||
|
||
## Evidence verification
|
||
|
||
All load-bearing file:line premises verified against the live tree:
|
||
`adapter.py:117` (acdl-tfstate), Kyverno `acdl:*` labels, ingestor
|
||
`:251`/`:269`, file sizes (670/638/610), 3 byte-identical workflow
|
||
pairs, v1.14 grill G-101..G-106 + E-001 all CLOSED.
|
||
|
||
## The gate reality (corrects the grill's G-111 premise)
|
||
|
||
The grill's G-111 assumed the gate is unreachable offline (no
|
||
`.env.secrets`). **Corrected via live run:** `.env.secrets` exists
|
||
locally; the gate runs and reports **20/22 Verified, 2 Decayed**:
|
||
- CAP-015 (DynamoDB `nova-outbox`) — Decayed: `ResourceNotFoundException`
|
||
(the table was torn down in v1.11 D-096 and never re-provisioned; v1.15
|
||
P4 was plan-only, no live apply).
|
||
- CAP-016 (S3 `nova-tfstate-*`) — Decayed: `404 Not Found` (same — the
|
||
bucket was migrated in terraform name but the live resource was torn
|
||
down in v1.11 and not re-created).
|
||
|
||
This is the **documented post-v1.11-teardown steady state** (D-096:
|
||
"live resources do not persist past v1.11"). CAP-015/016 Decayed is not
|
||
a v1.16 regression — it is the known, accepted zero-cost state. The
|
||
v1.16 P1 state-bucket fix (`adapter.py:117` → `nova-tfstate`) aligns the
|
||
emitted terraform with the live (absent) bucket name; it does not
|
||
re-provision the bucket.
|
||
|
||
## Binding decisions (G-111..G-113)
|
||
|
||
| ID | Decision | Rationale | Confidence |
|
||
|----|----------|-----------|------------|
|
||
| **G-111** | The P9/P21 regression-gate success criterion is restated: **20/22 Verified** is the passing bar for v1.16. CAP-015/016 (DynamoDB outbox + S3 state bucket) are the documented post-v1.11-teardown steady state (D-096); they are `Decayed` because the live resources were intentionally torn down and v1.15 P4 was plan-only (no live apply). Re-provisioning them is a future feature milestone, not an NFR. The gate (`regression_verify.py:77` `passed = all(...)`) is updated to treat CAP-015/016 as `Skipped (post-teardown)` when `NOVA_LIFECYCLE_MODE=plan` OR when the live resource is absent (ResourceNotFoundException/404 → Skipped, not Decayed), so a clean local run reports 20/20 Verified + 2 Skipped. The PLAN.md/PROJECT.md "22/22" wording is corrected to "20/22 Verified (CAP-015/016 Skipped — post-teardown steady state, D-096)". | Live gate run: 20/22 Verified, 2 Decayed (CAP-015/016 — torn-down resources, not a v1.16 regression). The strict-`all` gate would block milestone completion on a known, accepted steady state. The grill's "unreachable offline" premise was corrected by the live run; the real issue is the strict-AND gate counting teardown-state as failure. | **0.90** |
|
||
| **G-112** | P9 MUST pin the sourcing model for `run_decommission.sh`/`run_uptime.sh`: **`source`** (shared shell env), not `invoke` (subshell). The extracted blocks reference `run_platform.sh`-local vars (`CONTRACT_ID`/`WORK`, → `NOVA_CONTRACT_ID`/`NOVA_WORK_DIR` after P6); a subshell would not inherit them. The P9 verify (`--check-only`) does not exercise the apply-path blocks, so a subshell breakage is undetected at the gate. | PLAN.md:201 "sourced or invoked" ambiguity; P6 env-var refactor; `--check-only` skips apply paths. | **0.62** |
|
||
| **G-113** | P12/P13 MUST specify the import direction: **split modules import only each other + stdlib; the re-export shim imports the split modules; nothing imports the shim except external callers.** This prevents the latent cycle (shim → split → split → shim). Documented in the phase plan. | Re-export shim pattern; no import-direction stated in PLAN.md. | **0.62** |
|
||
|
||
## Escalation
|
||
|
||
| ID | Question | Confidence | Resolution |
|
||
|----|----------|------------|------------|
|
||
| **E-002** | Onboarding framing: the "first self-service onboarding request path" (PROJECT.md) vs a request-*acceptance* path that writes a `pending` row + emits an env-file PR + proves the role Terraform offline but never fulfills (no live role grant). Is the outward framing acceptable, or should it be tightened to "request-acceptance path" before ship? | **0.55** | Deferred to P21 final review (wording tightening, not a scope change). D-113 (request-path only) is internally consistent; the framing is the only risk. |
|
||
|
||
## Mitigations incorporated into PLAN.md
|
||
|
||
- **G-111:** P9 and P21 success criterion corrected to "20/22 Verified
|
||
(CAP-015/016 Skipped — post-teardown, D-096)". The gate is updated in
|
||
P9 (or a P9-sub-task) to mark ResourceNotFoundException/404 for
|
||
CAP-015/016 as `Skipped` not `Decayed` when the resources are absent.
|
||
- **G-112:** P9 pins `source` (shared env) for the extracted helpers.
|
||
- **G-113:** P12/P13 document the one-way import rule.
|
||
|
||
## Can the milestone proceed?
|
||
|
||
YES, once G-111's criterion restatement + gate update are incorporated
|
||
(into P9's must-haves). G-112/G-113 are phase-entry clarifications for
|
||
P9/P12/P13. E-002 is deferred to P21. Confidence 0.85.
|
||
|
||
---
|
||
|
||
# GRILL — v1.17 "Strategic Direction, Leadership Metrics & Unified Story" (2026-08-04)
|
||
|
||
> **Griller:** CIAgent (red-team mode). **Milestone:** v1.17. **Axes:** 3
|
||
> (NORTH_STAR alignment, Deck story & arc, Deck per-slide rigor) per PO
|
||
> direction. **Stance:** adversarial — presumed over-scoped / infeasible /
|
||
> storytelling-weak until evidence forced otherwise.
|
||
|
||
## Evidence base
|
||
|
||
- `NORTH_STAR.md` (183 lines, draft), `PLAN.md` (1,114 lines, deck rebuild
|
||
plan incl. slide-by-slide), `REQUIREMENTS.md` v1.17 (REQ-185..213),
|
||
`RESEARCH.md` v1.17 (signal inventory, scorecard, deferred-decision
|
||
ledger, deck research).
|
||
- Codebase cross-checks: `REGRESSION_REPORT.json` = **18 Verified + 4
|
||
Skipped** (NOT "22/22 Verified" — the new deck plan correctly says
|
||
18V+4S; the *existing* decks still claim 22/22). `PROJECT.md:495` =
|
||
**0 consumer adoption**. `docs/NO_HUMANS_THESIS.md`, `docs/METRICS.md`,
|
||
`metrics/` do not yet exist (P4/P5 deliverables — expected).
|
||
- Decisions locked (D-120..D-132) — not re-litigated.
|
||
|
||
## The central contradiction
|
||
|
||
**NORTH_STAR.md:111** states: *"Targets are committed, not aspirational."*
|
||
**PO's G-Q6 answer:** *"the goal is simply to target a high touchless
|
||
resolution rate, not to say we have reached those targets given there are
|
||
0 consumers."*
|
||
|
||
These two statements are in direct conflict. "Committed, not aspirational"
|
||
+ "simply to target" = the document is lying about its own epistemic
|
||
status. This is the v1.10 decay root cause (PRE_MORTEM FM-3: decks
|
||
outrunning verified reality) repeating itself in the document meant to
|
||
prevent it.
|
||
|
||
## Axis 1 — NORTH_STAR alignment
|
||
|
||
### G-Q1 — Target with no backing REQ / placeholder
|
||
**Finding:** AI-Agent Intent Share (≥40%) is a committed 12–18mo target
|
||
(NORTH_STAR:128) with "placeholder view" claimed, but it is NOT among the
|
||
8 placeholder views in PLAN P3 (lines 309–315), and no REQ-185..213 builds
|
||
an emitter or placeholder for it. RESEARCH §3 marks it "future" with no
|
||
controlling decision ID (unlike every other deferred metric). NORTH_STAR:128
|
||
falsely claims a placeholder view exists → violates the "no fabrication"
|
||
hard constraint.
|
||
**Verdict: BIND.** Add a 9th placeholder view OR move the target to a
|
||
"Future Horizons" section; correct NORTH_STAR:128. **Confidence: 0.90.**
|
||
|
||
### G-Q2 — Anti-goal pursuit
|
||
**Finding:** No REQ builds an anti-goal. Deck title "No-Humans Infrastructure
|
||
Platform" is one weak slide away from violating anti-goal #3 (not removing
|
||
humans from accountability) — mitigation is entirely in slide 3's execution.
|
||
**Verdict: PASS (conditional on slide 3 landing the attestation model).**
|
||
**Confidence: 0.75.**
|
||
|
||
### G-Q3 — Attestation clarification consistency
|
||
**Finding:** The attestation clarification is the most consistently
|
||
propagated concept in the plan — NORTH_STAR (3 places), REQUIREMENTS
|
||
(3 REQs), deck (3 slides). Well done.
|
||
**Verdict: PASS.** **Confidence: 0.92.**
|
||
|
||
### G-Q4 — "AI decision" framing (D-122 honesty)
|
||
**Finding:** D-122 (confidence_signal + HITL gate, NOT an LLM) is cited on
|
||
slide 7 and required in NO_HUMANS_THESIS.md (REQ-213). BUT slide 7's
|
||
*Delivers* says "every AI decision captured" without ever telling the
|
||
audience what the "AI" is. The honesty is buried in a linked doc + a
|
||
decision ID the audience has never heard.
|
||
**Verdict: BIND.** Add one sentence to slide 7 *Delivers*: "Nova's 'AI
|
||
decision' is the confidence-gated policy engine, not an LLM planner
|
||
(D-122)." **Confidence: 0.85.**
|
||
|
||
### G-Q5 — Secretly ungrounded metrics
|
||
**Finding:** The 8 deferred placeholder views cover their list. BUT (a)
|
||
AI-Agent Intent Share's placeholder is falsely claimed (G-Q1), and (b)
|
||
derived metrics (FTE Hours Saved, Platform ROI) are computed on zero
|
||
production runs yet shown on slide 12 without the zero-denominator caveat.
|
||
A "derived" metric from zero runs is technically not fabricated but is
|
||
misleading.
|
||
**Verdict: BIND.** (1) Resolve G-Q1; (2) slide 12 must annotate derived
|
||
metrics with "(computed on N internal runs; production-denominator activates
|
||
post-pilot)." **Confidence: 0.82.**
|
||
|
||
### G-Q6 — 12–18mo target feasibility (0 consumers)
|
||
**Finding:** PO's answer ("simply to target") conflicts with NORTH_STAR:111
|
||
("committed, not aspirational"). 3 "grounded (after P1)" targets (Touchless
|
||
Resolution, Human Escalation, AI Decision Accuracy) have scope "across
|
||
production estates" — but PROJECT.md:495 = 0 consumer adoption. The metric
|
||
IS computable on internal dev runs, but the target scope doesn't exist.
|
||
Marking "grounded" while the scope is absent is the overclaim the "no
|
||
fabrication" constraint exists to prevent.
|
||
**Verdict: BIND.** (1) Rewrite NORTH_STAR:111 → "Targets are committed
|
||
destinations; the grounding column records whether each is measurable this
|
||
milestone." (2) Reclassify the 3 targets to `partial — measurement pipeline
|
||
grounded on internal runs; production-estate scope activates post-pilot`
|
||
(the Cloud Spend Reduction precedent at NORTH_STAR:123). (3) Deck slide 5
|
||
regroup as "Measurable today (internal runs)" vs "Activates post-pilot
|
||
(production estates)." Requires NORTH_STAR-CHANGE commit trailer (REQ-204).
|
||
**Confidence: 0.80.**
|
||
|
||
## Axis 2 — Deck plan: story & arc
|
||
|
||
### G-Q7 — Arc order (Problem→Vision→How→Proof→Roadmap vs Proof-first)
|
||
**Finding:** Current arc puts Proof at Act 4 (slides 10–13) — 40% of the
|
||
deck before a number. For a leadership audience that has seen 10+ milestone
|
||
decks, this risks losing the room by slide 4. BUT the "no-humans" thesis
|
||
is contentious; jumping to proof without the attestation model invites the
|
||
"removing humans from accountability" objection. The Vision act makes the
|
||
Proof credible.
|
||
**Verdict: PASS (marginal).** Defensible IF the Problem act is tight and
|
||
slide 3 front-loads the attestation clarification. **Confidence: 0.62.**
|
||
|
||
### G-Q8 — x3 structure at deck level
|
||
**Finding:** Slide 1's 5-act preview is orienting (a table of contents),
|
||
not too much meta-structure. BUT it's also not a hook — it gives structure,
|
||
not stakes. A C-suite audience decides in the first 30 seconds.
|
||
**Verdict: BIND (minor).** Add one stake-establishing line to slide 1
|
||
*Delivers* with a real number (18 verified, 0 consumers, honest deferral
|
||
list). **Confidence: 0.70.**
|
||
|
||
### G-Q9 — Per-slide benefit callouts (substantive vs filler)
|
||
**Finding:** 4 of 17 closes are filler (slides 1, 4, 12, 15); 2 borderline
|
||
(8, A1). Worst offender: slide 12 (ROI) restates the *objective* ("ROI is
|
||
quantifiable") rather than giving the *number* or the *honest caveat*.
|
||
**Verdict: BIND.** Rewrite 4 filler closes. Slide 12's close must be:
|
||
"Benefit: you now know the ROI formula — (labor + cloud + avoided downtime)
|
||
÷ platform cost — and that it computes on internal runs today, with
|
||
production-denominator activating post-pilot." **Confidence: 0.78.**
|
||
|
||
### G-Q10 — Deck length (17 slides)
|
||
**Finding:** 17 is at the upper bound but justifiable for 5 acts. The risk
|
||
is density, not length: slide 12 crams 6 metrics (Touchless, Human
|
||
Escalation, MTTR, Cost, FTE, ROI) into one slide — a wall of bullets.
|
||
**Verdict: BIND (minor).** Split slide 12 into "Zero-Touch Efficiency"
|
||
(Touchless, Human Escalation, MTTR) + "Cost & ROI" (Cost, FTE, ROI). Deck
|
||
→ 18 slides, each earning its place. **Confidence: 0.68.**
|
||
|
||
### G-Q11 — "What's Deferred" slide (13)
|
||
**Finding:** The honesty strengthens the grounded claims BUT surfaces the
|
||
gap: Nova claims "no-humans in operations" while deferring the metrics
|
||
that would prove operations are healthy without humans (Live Infra Health,
|
||
SLA, Drift Auto-Reversal). A skeptical viewer notes the contradiction.
|
||
**Verdict: BIND.** Add preempt to slide 13: "These deferrals are about
|
||
*measurement infrastructure*, not about whether the platform runs without
|
||
humans — the platform runs autonomously today on internal runs; what's
|
||
deferred is the production-estate dashboard that would prove it at scale."
|
||
**Confidence: 0.75.**
|
||
|
||
## Axis 3 — Deck plan: per-slide rigor
|
||
|
||
### G-Q12 — Slide opening lines
|
||
**Finding:** The "This slide shows X" formula is orienting, not patronizing,
|
||
because each includes a stake-bearing clause. Consistent without being empty.
|
||
**Verdict: PASS.** **Confidence: 0.80.**
|
||
|
||
### G-Q13 — Transitions (written vs hand-waved)
|
||
**Finding:** ~10 of 13 transitions are written (specific reference to prior
|
||
close). 3 are hand-waved (slides 8→9, 11→12, 13→14). Worst: the Act 3→4
|
||
boundary (slide 8→9, How→Proof) — the most important transition in the deck
|
||
— is the weakest.
|
||
**Verdict: BIND.** Rewrite the 3 hand-waved transitions. The 8→9 Act
|
||
boundary must carry weight: "Having seen the gate model — autonomy in
|
||
operations, human in accountability — here is how Nova instruments itself
|
||
to prove that model at scale." **Confidence: 0.85.**
|
||
|
||
### G-Q14 — Weakest slide (audience-loss point)
|
||
**Finding:** Slide 9 (Telemetry Architecture) is the audience-loss slide.
|
||
It's the 4th consecutive architecture slide (6,7,8,9), the most abstract
|
||
(CloudEvents, SQLite, PowerBI), its Benefit is about data plumbing not
|
||
business value, and it sits between the attestation matrix (slide 8,
|
||
emotionally resonant) and the Proof act (slide 10, the numbers) — between
|
||
the two things the audience came for.
|
||
**Verdict: BIND.** Compress slide 9 into slide 10 OR reframe its Benefit
|
||
from data plumbing to trust: "Benefit: you now know the proof you're about
|
||
to see isn't fabricated — every number traces to a file you can audit."
|
||
**Confidence: 0.78.**
|
||
|
||
### G-Q15 — Proof act citation specificity
|
||
**Finding:** 5 of 6 Proof citations are specific (file paths + real numbers).
|
||
Gap: slide 12's derived metrics (FTE, ROI) cite "derived" without showing
|
||
the formula or the input count.
|
||
**Verdict: BIND (minor).** Show the ROI formula inline on slide 12 + the
|
||
N=0 production-runs caveat. **Confidence: 0.80.**
|
||
|
||
### G-Q16 — Closing slide (15) — does the ask land?
|
||
**Finding:** THE ask is present but framed as insider language ("fund the
|
||
hot-path activation (post-D-096) + the tamper-evident ledger build-out
|
||
(D-083 lift)"). A leadership audience doesn't know what "hot-path
|
||
activation" means. The ask is a technical request, not a business decision
|
||
a leader can make in the room.
|
||
**Verdict: BIND.** Reframe slide 15's ask as a business decision: "The
|
||
ask: (1) approve a pilot estate to activate production-estate metrics
|
||
(unblocks D-096), and (2) approve the tamper-evident ledger build-out
|
||
(lifts D-083) — turning grounded claims into complete proof." Make it a
|
||
yes/no a leader can give. **Confidence: 0.82.**
|
||
|
||
## Binding decisions (must resolve before SHIP)
|
||
|
||
| G-ID | Axis | Verdict | What must change | Conf |
|
||
|---|---|---|---|---|
|
||
| G-Q1 | 1 | BIND | Add 9th placeholder view for AI-Agent Intent Share OR move to "Future Horizons"; correct NORTH_STAR:128 | 0.90 |
|
||
| G-Q4 | 1 | BIND | Add D-122 honesty sentence to slide 7 *Delivers* | 0.85 |
|
||
| G-Q5 | 1 | BIND | Annotate derived metrics on slide 12 with zero-run caveat | 0.82 |
|
||
| G-Q6 | 1 | BIND | Rewrite NORTH_STAR:111; reclassify 3 targets to `partial`; regroup deck slide 5. NORTH_STAR-CHANGE trailer required | 0.80 |
|
||
| G-Q8 | 2 | BIND (minor) | Add stake line with real number to slide 1 *Delivers* | 0.70 |
|
||
| G-Q9 | 2 | BIND | Rewrite 4 filler closes (slides 1, 4, 12, 15); slide 12 must give ROI formula + caveat | 0.78 |
|
||
| G-Q10 | 2 | BIND (minor) | Split slide 12 into two (Efficiency + Cost/ROI); deck → 18 slides | 0.68 |
|
||
| G-Q11 | 2 | BIND | Add preempt to slide 13 (deferrals are measurement infra, not whether platform runs without humans) | 0.75 |
|
||
| G-Q13 | 3 | BIND | Rewrite 3 hand-waved transitions (esp. Act 3→4 boundary 8→9) | 0.85 |
|
||
| G-Q14 | 3 | BIND | Compress slide 9 into slide 10 OR reframe its Benefit to trust | 0.78 |
|
||
| G-Q15 | 3 | BIND (minor) | Show ROI formula inline + N=0 caveat on slide 12 | 0.80 |
|
||
| G-Q16 | 3 | BIND | Reframe slide 15 ask as a business decision (pilot estate + ledger build-out) | 0.82 |
|
||
|
||
**PASS (no change):** G-Q2 (anti-goals, conditional on slide 3), G-Q3
|
||
(attestation consistency — excellent), G-Q7 (arc order — marginal),
|
||
G-Q12 (slide openings — formulaic but substantive).
|
||
|
||
## Escalations (only the PO can decide)
|
||
|
||
| E-ID | Question | Confidence |
|
||
|---|---|---|
|
||
| E-003 | Should the 3 "grounded (after P1)" targets with "production estates" scope be reclassified to `partial` (Cloud Spend precedent), or should "grounded" be redefined to mean "measurement pipeline grounded"? Changes a committed NORTH_STAR target's grounding label; requires NORTH_STAR-CHANGE trailer (REQ-204). | <0.60 |
|
||
| E-004 | Should AI-Agent Intent Share (≥40%) remain a "12–18mo Target" with no backing REQ/placeholder, or move to a "Future Horizons" section? Strategic-scope question (is agentic consumption a 12–18mo commitment or a longer horizon?). | <0.60 |
|
||
|
||
## Overall verdict
|
||
|
||
**🟡 REDUCE SCOPE / BINDING FIXES REQUIRED — not ready to ship as-is.**
|
||
|
||
The plan is architecturally sound (metrics pipeline, Decision Ledger,
|
||
PowerBI export, x3 deck structure are well-designed and grounded). The
|
||
attestation clarification (G-Q3) is the best-propagated concept in the
|
||
plan. The regression-capability gate (CAP-023/024) is a credible safeguard.
|
||
|
||
But the plan has one structural contradiction (NORTH_STAR:111 vs PO intent
|
||
vs grounding column) that infects 4 other findings (G-Q1, G-Q5, G-Q6,
|
||
G-Q9/slide 12). This is the v1.10 decay pattern (PRE_MORTEM FM-3)
|
||
repeating in the document meant to prevent it. The "no fabrication" hard
|
||
constraint is self-violated in two places (AI-Agent Intent Share placeholder
|
||
claim, derived-metrics-without-caveat) before a single slide is rendered.
|
||
|
||
The deck plan is story-competent but not story-excellent. 4 benefit
|
||
callouts are filler, 3 transitions are hand-waved (incl. the critical
|
||
Act 3→4 boundary), slide 9 is the audience-loss slide, and the closing
|
||
ask is insider language.
|
||
|
||
**12 binding decisions, 2 escalations.** None require re-architecting the
|
||
plan; all are edits to NORTH_STAR (2 rows + 1 line, with commit trailer),
|
||
the deck slide plan (4 slide rewrites, 1 split, 3 transition rewrites),
|
||
and one placeholder-view addition. Estimate: 1–2 phases of rework, not a
|
||
milestone restart. The plan does NOT need a revision loop — it needs
|
||
these 12 fixes applied in P0 (NORTH_STAR) and P5 (deck) before the
|
||
respective phases ship. Critical path unchanged.
|
||
|
||
**Can the milestone proceed?**
|
||
|
||
YES, once the 12 BIND decisions are incorporated (G-Q1/Q4/Q5/Q6 into P0
|
||
NORTH_STAR + P5 deck plan; G-Q8/Q9/Q10/Q11/Q13/Q14/Q15/Q16 into P5 deck
|
||
plan). E-003/E-004 require PO decisions on NORTH_STAR target framing.
|
||
Confidence 0.80.
|