Files
acdl/.ciagent/GRILL.md
T
Jon Chery 69ba3d728f verify(grill): v1.15-Nova rebrand — 9 axes, 8 findings (G-103..G-110), 3 binding mitigations
---ci---
status: grill
milestone: v1.15
verdict: proceed-with-conditions
confidence: 0.82
binding_decisions:
  - G-103: ACCEPT-AS-IS (feasibility) — 4-phase structure sound; conf 0.85
  - G-104: MITIGATE-BINDING (scope/technical) — re-tag as v1.15.x minor-bumped; conf 0.90
  - G-105: ACCEPT-AS-IS (cost) — no live apply during P0-P4; conf 0.80
  - G-106: MITIGATE-BINDING (risk/technical) — dual-read in BOTH .env.secrets load paths (run_platform.sh + regression_verify.py); conf 0.88
  - G-107: ACCEPT-AS-IS (testability) — per-phase fixture updates keep gate 16/16; mmdc via npx available; conf 0.82
  - G-108: MITIGATE-BINDING (security) — update CI workflow secrets: refs when NOVA_* Gitea secrets created; hard gate + retry; conf 0.80
  - G-109: ACCEPT-AS-IS (maintainability) — P5 mechanical cleanup; conf 0.78
  - G-110: ACCEPT-AS-IS (adversarial) — runbook + staged ordering is rollback; conf 0.75
escalations: []
open_issues:
  - G-104 mitigation must be incorporated into PLAN.md before P0 ship (re-tag v1.14.x -> v1.15.x)
  - G-106 mitigation must be incorporated into PLAN.md P2 (dual-read in run_platform.sh:288-289 + regression_verify.py:309-312)
  - G-108 mitigation must be incorporated into PLAN.md P2 task 3 (update .gitea/.github workflow secrets: refs)
---ci---
2026-07-30 00:39:01 +00:00

573 lines
41 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# CIAgent Grill Report
## Run: 2026-07-27 19:30 (mode: interactive, focus: all)
### Verdict: Proceed with conditions (confidence: 0.72)
Two escalations must be resolved before the leadership pitch:
- **G-005 (risks):** 6 cloud capabilities (CAP-017..022) are deploy-unverified.
**RESOLVED (v1.11):** CAP-017..022 are now Verified live-aws via the
modules-lifecycle pipeline (apply/modify/destroy exit 0). The IAM-drift
framing is removed. See CAPABILITY_INVENTORY.md.
- **G-008 (budget):** No cost documentation exists despite live AWS resources.
**RESOLVED (v1.11):** COST.md now exists, documenting the v1.0→v1.10 spend
window + the v1.11 cost projection. The v1.14 P19 phase extends the
window to v1.11v1.14.
The project is reclassified as an **OSS reference implementation** (G-003),
not a sponsored product. The grill's sponsor/ROI/budget/timeline axes apply
in weakened form; the adoption, architecture, and risks axes apply in full.
### Axis 1 — Business Case
- **Q1**: What problem does this actually solve, and is that problem still the top priority?
- Evidence: PROJECT.md:3-21 (vision + North Star); G-003 reframing (OSS reference)
- Answer: ACDL is an OSS reference implementation showing the shape of an agentic cloud delivery platform. The problem (cognitive load of infra + operational work of safe change) is documented in docs/vision.md.
- Confidence: 0.85
- Decision: G-003 — reframe as OSS reference implementation; no sponsor/ROI required.
- **Q2**: Who is the named executive sponsor, and when did they last make a decision under pressure?
- Evidence: MISSING (no named sponsor in any .ciagent/ file)
- Answer: Not applicable for an OSS reference implementation (G-003). Senior leadership requesting the pitch is interest, not sponsorship.
- Confidence: 0.85
- Decision: G-003 (carries forward).
- **Q3**: What happens to the business if the project is cancelled?
- Evidence: PROJECT.md:487 ("0 consumer adoption"); 10 milestones shipped with no consumers
- Answer: If cancelled, no consumer loses a deployed system. The reference value (clonable shape) persists in the repo. Cancellation cost is low — consistent with OSS reference framing.
- Confidence: 0.80
- Decision: G-003 (carries forward).
- **Q4**: Is the ROI calculated against a counterfactual?
- Evidence: MISSING (no ROI calculation anywhere)
- Answer: Not applicable for an OSS reference implementation. The bar is "is it a credible, demonstrable reference?" not "is there a paying customer?"
- Confidence: 0.85
- Decision: G-003 (carries forward).
### Axis 2 — Scope and Requirements
- **Q1**: Is the scope expanding, contracting, or genuinely stable?
- Evidence: ROADMAP.md (v1.0→v1.10, 55 phases); v1.7 added uptime-kuma + decommission + RDS; v1.9.x added decks; v1.10 added regression-class VERIFY + local emulators
- Answer: Expanding. The Out-of-Scope table (REQUIREMENTS.md:61-72) is scoped to v1.1 only; later milestones added scope without boundary updates.
- Confidence: 0.70
- Decision: G-010 — OSS scope is contributor-bounded; no out-of-scope table needed.
- **Q2**: Who owns the requirements, and have they been frozen?
- Evidence: REQUIREMENTS.md (115 REQs, REQ-01..REQ-115); config.json autonomy=full
- Answer: The user owns requirements via CLARIFY auto-resolution under full autonomy. Not frozen — each milestone adds REQs.
- Confidence: 0.70
- Decision: G-010 (carries forward).
- **Q3**: What is explicitly out of scope?
- Evidence: REQUIREMENTS.md:61-72 (v1.1 Out-of-Scope table only); PROJECT.md:42-51 (Domain Boundaries)
- Answer: Domain Boundaries section (PROJECT.md:42-51) defines durable out-of-scope: application business logic, IDE workflows, product backlog, node/OS-level compute. No per-milestone out-of-scope updates since v1.1.
- Confidence: 0.65
- Decision: G-010 — contributor-bounded scope accepted for OSS reference.
- **Q4**: Are there hidden requirements only disclosed late in delivery?
- Evidence: v1.10 milestone (decay disclosure, PROJECT.md:59-67) — 7 adapter defects undisclosed across 8 phases
- Answer: Yes — the v1.10 decay incident is a late-disclosed hidden requirement (reproducibility). D-091 regression gate is the mitigation.
- Confidence: 0.72
- Decision: G-007 (carries forward — milestone-level regression gate catches late-disclosed decay).
### Axis 3 — Architecture and Technical Feasibility
- **Q1**: Has the proposed architecture been validated by the people who will build and operate it?
- Evidence: PERSONAS.md (agent personas only); ARCHITECTURE.md (29KB); no human reviewer sign-off
- Answer: Validated by the agent that built it, not by a downstream platform team. Acceptable for an OSS reference (G-002 — Platform Team joins post-clone).
- Confidence: 0.72
- Decision: G-002 (carries forward).
- **Q2**: What is the integration surface?
- Evidence: ARCHITECTURE.md; adapters/ (terraform, wiz, kyverno, local emulators); contracts/ schema
- Answer: Contract schema (upstream) + engine adapters (downstream). Integration is bounded by the IR + PolicyCheckResult schemas.
- Confidence: 0.78
- Decision: (resolved by existing architecture; no new binding decision)
- **Q3**: Is there an existing system being replaced?
- Evidence: PROJECT.md:7-8 (vision: absorb cognitive load + operational work)
- Answer: ACDL replaces manual platform engineering + ticket-driven delivery. No existing system in this repo; downstream teams replace their own.
- Confidence: 0.75
- Decision: (resolved by G-002 white-label framing)
- **Q4**: What is the technical debt being inherited, and is it budgeted for?
- Evidence: v1.10 decay (7 adapter defects); D-091 regression gate at milestone completion (not per-phase)
- Answer: Diff-scoped VERIFY debt was paid down in v1.10. Per-phase regression gap is accepted debt (G-007).
- Confidence: 0.70
- Decision: G-007 — milestone-level regression gate is correct; inter-milestone decay is an accepted trade-off.
### Axis 4 — People, Skills, and Organization
- **Q1**: Which 2-3 people, if they left, would the project fail?
- Evidence: PERSONAS.md (agent personas); all binding decisions made by the user (D-034, D-090, G-001..G-012)
- Answer: One person — the user. Bus factor is 1.
- Confidence: 0.82
- Decision: G-011 — single-maintainer is normal for OSS reference; no action.
- **Q2**: Are the assigned resources actually allocated at the percentages claimed?
- Evidence: config.json (autonomy=full, max_concurrent_agents=5)
- Answer: The agent is the resource; allocation is 100% when invoked, 0% otherwise. No BAU fire-fighting claim to verify.
- Confidence: 0.78
- Decision: G-011 (carries forward).
- **Q3**: Is there a product owner with actual authority to prioritize?
- Evidence: config.json (autonomy=full, decision_confidence_threshold=0.6)
- Answer: The user is the product owner with absolute authority (full autonomy within user-locked constraints).
- Confidence: 0.80
- Decision: G-011 (carries forward).
- **Q4**: Is the team building capability they don't have?
- Evidence: RESEARCH.md (101KB); local emulating adapters (Phase 53) — capability was built and proven
- Answer: No — the agent built and verified the capability. Not a prototype-hoping-to-learn scenario.
- Confidence: 0.78
- Decision: (resolved by existing evidence)
### Axis 5 — Timeline and Estimates
- **Q1**: Was the deadline set before or after the scope was understood?
- Evidence: ROADMAP.md (v1.0 07-21 → v1.10 07-27, 6 days); no deadline documented anywhere
- Answer: No deadline. Milestones complete when the agent finishes committing.
- Confidence: 0.78
- Decision: G-006 — autonomous OSS build has no deadline; cadence is fine.
- **Q2**: What is the project's critical path?
- Evidence: MISSING (no critical path analysis)
- Answer: Not applicable — no deadline means no critical path to push.
- Confidence: 0.75
- Decision: G-006 (carries forward).
- **Q3**: Are the estimates evidence-based?
- Evidence: MISSING (no estimates; phases complete in agent-time)
- Answer: No estimates. The cadence is a function of agent speed, not engineering sizing.
- Confidence: 0.72
- Decision: G-006 (carries forward — acceptable for autonomous OSS reference).
- **Q4**: Is there a working definition of done?
- Evidence: VERIFY.md; AUDIT.md; 4-layer verify gate (structural, behavioral, security, quality)
- Answer: Yes — the 4-layer verify gate + regression gate (D-091) is the definition of done. "Done" is not "whatever the latest demo shows"; it is a gated, audited state.
- Confidence: 0.80
- Decision: (resolved by existing verify gate)
### Axis 6 — Budget and Financial Realism
- **Q1**: What percentage of the budget is already spent vs. remaining?
- Evidence: MISSING (no budget file in .ciagent/)
- Answer: Unresolved — no budget documented.
- Confidence: 0.50
- Decision: G-008 — ESCALATION.
- **Q2**: Are there predictable cost drivers not in the original budget?
- Evidence: config.json escalation_hooks (deploy, delete_data); CAP-013..016 verified against live AWS account 581513795199
- Answer: Yes — live AWS resources exist (S3 state, DynamoDB outbox, ECS, CloudFront). No cost driver documentation.
- Confidence: 0.60
- Decision: G-008 (carries forward — escalation).
- **Q3**: What's the burn rate, and how long until the money runs out?
- Evidence: MISSING
- Answer: Unresolved.
- Confidence: 0.40
- Decision: G-008 (carries forward — escalation).
- **Q4**: Is the budget contingent on something that hasn't happened yet?
- Evidence: MISSING
- Answer: Unresolved — likely contingent on the leadership pitch yielding a pilot platform team (G-001).
- Confidence: 0.55
- Decision: G-008 (carries forward — escalation).
### Axis 7 — Risks, Assumptions, and Dependencies
- **Q1**: What are the top 3 assumptions the plan rests on?
- Evidence: PROJECT.md:79-88 (CAP-017..022 IAM-gated); D-039 (OIDC federation deferred, blocked on go-gitea/gitea#36988); D-090 (no cap on re-verification sweep)
- Answer: (1) Terraform plan path proves deployability. (2) Local emulators prove runtime behavior. (3) Gitea OIDC will eventually merge.
- Confidence: 0.72
- Decision: (resolved by G-005 escalation)
- **Q2**: What are you dependent on outside the team?
- Evidence: PROJECT.md:79-88 (admin principal needed for IAM re-bootstrap); go-gitea/gitea#36988 (OIDC blocker)
- Answer: An admin AWS principal (for CAP-017..022) and the Gitea OIDC PR (for D-039 waiver closure).
- Confidence: 0.78
- Decision: G-005 (carries forward — escalation).
- **Q3**: What is the single risk that, if it materializes, kills the project?
- Evidence: CAPABILITY_INVENTORY.md §"Cloud capabilities NOT re-verified" (6 of 22 capabilities, 27%)
- Answer: The unverifiable deploy path for CAP-017..022. If the terraform plan path does not translate to a real deploy, 27% of advertised capability is fictional.
- Confidence: 0.80
- Decision: G-005 — ESCALATION.
- **Q4**: Have you done a pre-mortem?
- Evidence: MISSING (no pre-mortem document)
- Answer: No pre-mortem on file. The v1.10 decay incident is the closest thing to a post-mortem.
- Confidence: 0.65
- Decision: (flagged; no binding decision — user accepted autonomous governance in G-009)
### Axis 8 — Governance, Decision-Making, and Communication
- **Q1**: Who is the decision-maker when two executives disagree?
- Evidence: config.json (autonomy=full); no human governance body documented
- Answer: The user is the single decision-maker. No executive disagreement is possible because there is no executive body.
- Confidence: 0.78
- Decision: G-009 — autonomous CI is the governance.
- **Q2**: How often does governance meet, and what's the escalation pattern?
- Evidence: config.json (escalation_hooks: deploy, delete_data, merge_to_main; escalation_timeout_ms: 300000)
- Answer: Governance is event-driven (escalation hooks), not cadence-driven. 5-minute timeout.
- Confidence: 0.72
- Decision: G-009 (carries forward).
- **Q3**: What is being omitted from the status reports?
- Evidence: v1.10 decay disclosure (PROJECT.md:59-67) — 8 phases omitted the decay from status
- Answer: The v1.10 incident is direct evidence that status reports (decks) omitted material decay. D-094 (rewrite to verified reality) is the correction.
- Confidence: 0.75
- Decision: (resolved by D-094 + G-007 regression gate)
- **Q4**: Is there a "stop the project" trigger?
- Evidence: MISSING (no stop-trigger documented)
- Answer: No formal stop-trigger. The user is the single point of cancellation authority.
- Confidence: 0.68
- Decision: G-009 — autonomous CI is the governance; no human stop-trigger needed.
### Axis 9 — Change, Adoption, and Operational Readiness
- **Q1**: Who will use this, and what is in it for them?
- Evidence: PROJECT.md:487 ("0 consumer adoption"); G-001 (MVP for leadership pitch + pilot consumers)
- Answer: Pilot platform teams (post-pitch) will clone, customize, and deploy for their internal consumers. The value to them is a working reference shape.
- Confidence: 0.65
- Decision: G-001 — feature-complete MVP for pitch + pilot consumers in parallel.
- **Q2**: Is the operations/support team involved now or being handed a finished product?
- Evidence: MISSING (no Platform Team involvement in 55 phases); G-002 (white-label, out-of-repo)
- Answer: Intentionally out-of-scope — ACDL is white-label; Platform Team customization happens outside this repo.
- Confidence: 0.78
- Decision: G-002 — white-label; Platform Team customization is out-of-repo.
- **Q3**: What is the rollback plan if it goes wrong?
- Evidence: D-070 (decommission mode, 2-step pipeline with HITL SRE gates)
- Answer: Decommission mode exists for deployed stacks. For the reference repo itself, rollback = git revert (no production state to roll back).
- Confidence: 0.75
- Decision: (resolved by existing D-070 decommission mode)
- **Q4**: Has anyone validated the success criteria with the people who will judge success?
- Evidence: PROJECT.md (leadership pitch requested); no documented success-criteria validation with leadership
- Answer: The leadership pitch IS the validation moment. Success criteria for an OSS reference = "leadership says this is a credible shape."
- Confidence: 0.68
- Decision: G-001 (carries forward — pitch is the validation).
### Meta — Closing Review
- **Q1**: If you were the auditor, what would you flag?
- Evidence: This grill run
- Answer: (1) 6 unverifiable cloud capabilities (G-005). (2) No cost documentation (G-008). (3) Vision doc vs. OSS-reference framing tension (G-004 — resolved by keeping vision as target-state description).
- Confidence: 0.78
- Decision: (aggregated; G-005 + G-008 are the actionable flags)
- **Q2**: What is the project not doing that it should?
- Evidence: MISSING (no pre-mortem, no cost doc, no Platform Team engagement, no stop-trigger)
- Answer: Documenting the operating model (cost, deploy verification, governance) for a downstream team. The grill surfaced this across G-005, G-008, G-009.
- Confidence: 0.75
- Decision: (aggregated; G-005 + G-008 are the actionable items)
- **Q3**: What is the simplest possible version that could deliver 80% of the value?
- Evidence: ROADMAP.md (v1.1 spike, Phase 10, REQ-27 — core E2E proven); v1.2-v1.10 (45 phases of expansion)
- Answer: The v1.1 spike (contract → IR → terraform plan → Checkov → confidence → outbox) is the 80%-value version. The full 115-requirement build is accepted as the reference value (G-012).
- Confidence: 0.68
- Decision: G-012 — full catalog is the value; no minimal release needed.
- **Q4**: What would have to be true for this to succeed in the next 90 days, and is it true today?
- Evidence: G-001 (pitch + pilot); G-005 (IAM re-bootstrap); G-008 (cost doc)
- Answer: (1) Leadership pitch yields a pilot platform team — NOT TRUE today (pitch not yet delivered). (2) CAP-017..022 deploy path is verifiable — NOT TRUE today (G-005 escalation). (3) Cost operating model is documented — NOT TRUE today (G-008 escalation).
- Confidence: 0.72
- Decision: (aggregated; G-005 + G-008 + G-001 pitch are the 90-day conditions)
### Binding Decisions
| ID | Axis | Decision | Confidence |
|----|------|----------|-----------|
| G-001 | adoption | Feature-complete MVP for leadership pitch + pilot consumers in parallel; CIAgent builds, Platform Team deploys | 0.65 |
| G-002 | adoption | ACDL is white-label; Platform Team customization is out-of-repo; resolves ops-handoff concern | 0.78 |
| G-003 | business | Reframe as OSS reference implementation; no sponsor/ROI required | 0.85 |
| G-004 | business | Keep production-deployment vision; reference describes target state | 0.75 |
| G-005 | risks | ESCALATION — re-bootstrap IAM or mark CAP-017..022 deploy-unverified in decks | 0.80 |
| G-006 | timeline | Autonomous OSS build has no deadline; cadence acceptable | 0.72 |
| G-007 | architecture | Milestone-level regression gate is correct; system worked as designed | 0.70 |
| G-008 | budget | ESCALATION — add COST.md or document zero-cloud-cost operating model | 0.74 |
| G-009 | governance | Autonomous CI is the governance; no human stop-trigger needed | 0.68 |
| G-010 | scope | OSS scope is contributor-bounded; no out-of-scope table needed | 0.65 |
| G-011 | people | Single-maintainer is normal for OSS reference; no action | 0.70 |
| G-012 | meta | Full catalog is the value; no minimal release needed | 0.68 |
### Escalations
- **[G-005] risks** — 6 cloud capabilities (CAP-017..022: DynamoDB contracts table, Lambda contract-ingestor, ECS service live, CloudFront production stack, uptime-kuma, OIDC role) are deploy-unverified. The `acdl-spike-runner` IAM user cannot fix its own IAM (chicken-and-egg). Either re-bootstrap IAM with an admin principal to re-verify, or explicitly mark these 6 as "design-verified, deploy-unverified" in every leadership deck before the pitch. Resolves: project-killing risk (Axis 7 Q3).
- **[G-008] budget** — No cost documentation exists in `.ciagent/` despite live AWS resources (account 581513795199, CAP-013..016 verified). Either add a `COST.md` documenting monthly AWS spend, or explicitly document that ACDL runs at zero cloud cost (local emulators are the primary tier; live-AWS is a one-off spike per milestone). Resolves: financial-control gap (Axis 6 Q1-Q4).
---
## Run: 2026-07-29 20:25 (mode: adversarial, focus: v1.14 NFR plan)
### Verdict: FEASIBLE WITH BINDING DECISIONS (confidence: 0.72)
The v1.14 milestone is a sound, well-evidenced NFR sweep with a genuine,
traceable backlog. Not fundamentally infeasible. Four binding decisions
close plan defects + unverified assumptions that would otherwise re-expose
the v1.11 4-VPC failure mode. One escalation (E-001) auto-resolved at full
autonomy with assumption logging.
### 9-Axis scores
| Axis | Confidence | Forcing question (short) |
|------|-----------|---------------------------|
| 1 Business | 0.80 | Real backlog (5 P1 + 4 P2 + 6 swallowed errors + 15+ hardcoded IDs); cancellation survivable but inherits decay risk |
| 2 Scope | 0.70 | User-directed + frozen; P13 has a hidden feature door (implement vs remove); P2 conditional-child edges past wiring |
| 3 Architecture | 0.62 | P8 grep unsatisfiable for backend blocks; P8 state-bucket continuity unguarded; P9 IAM naming unverified; P4/P8 file overlap |
| 4 People | 0.85 | Agentic single-operator; runtime availability is the key-person risk |
| 5 Timeline | 0.68 | No deadline; 20-phase unverified span is the longest since G-007; P8 is the latent multi-phase-rework risk |
| 6 Budget | 0.85 | NFR-only, no new AWS resources; P8 re-creation is a one-shot accident not structural cost |
| 7 Risks | 0.60 | A1 (acdl-* naming unverified), A2 (fallback constant unbound), A3 (P4 gate hardening); kill-risk = P8 orphans state |
| 8 Governance | 0.72 | Full autonomy; no mid-milestone stop trigger; per-phase "green" ≠ "capabilities Verified" |
| 9 Adoption | 0.70 | No external users; rollback is git-level for code, AWS-state rollback unaddressed if P8 misfires pre-detection |
### Binding Decisions
| ID | Axis | Decision | Confidence |
|----|------|----------|-----------|
| G-101 | architecture | P8 grep scope amended to exclude terraform `backend "s3"` blocks (bucket arg is static-config-only, evaluated pre-init; cannot reference `data.aws_caller_identity`). Resource ARNs in policy/code ARE externalized; backend blocks stay literal or move to `-backend-config` (separate change). | 0.80 |
| G-102 | risks | P8 must bind `ACDL_AWS_ACCOUNT_ID` fallback to the live account ID (not a placeholder) AND the lifecycle workflow (full-mode jobs) must set `ACDL_AWS_ACCOUNT_ID` from `aws sts get-caller-identity` before any lifecycle invocation. No full-mode run proceeds with the env unset. | 0.78 |
| G-103 | scope | P13 must take the removal+documentation path (remove `--kube-version` + document deferral to GitOps reconciler roadmap), NOT the implementation path. Implementing version-aware policy selection is a new feature, violating D-095. | 0.85 |
| G-104 | architecture | P9 must verify (grep/audit of `modules/l1/*/terraform/main.tf` + `modules/l2/*/composition.json`) that every IAM role + KMS key created by the lifecycle pipeline matches `acdl-*` prefix before merge. CloudFront + WAFv2 (CloudFront scope) remain `Resource: "*"` with a documented global-ARN constraint. | 0.70 |
| G-105 | governance | P4's regression-gate hardening must be validated by running the full regression gate immediately after P4 lands (not deferred to P21). Gate must pass clean post-P4 before W2 begins. | 0.70 |
| G-106 | governance | A mid-milestone regression-gate checkpoint is added after W2 (P12), before W3 begins. Gate runs offline (D-091); a non-Verified result halts W3 until fixed. Not a re-litigation of G-007 (per-phase stays deferred) — a single checkpoint at the natural seam after the security wave. | 0.65 |
### Escalations
- **[E-001] risks** — P8 state-bucket continuity re-exposes the v1.11 4-VPC
root cause. G-102 proposes a binding mitigation (bind fallback + wire env
into workflow), but the residual risk (a future full-mode lifecycle run
with a misconfigured env orphans live state and re-creates resources)
cannot be reduced below 0.20 by plan-level decisions alone. **Auto-
resolved at full autonomy (D-101):** accept the residual risk; G-102's
binding mitigation (fallback bound to live account ID + workflow env
wiring) is the control. The lifecycle pipeline defaults to plan-only
(REQ-134) — full-mode runs are workflow_dispatch only, reducing the
accident surface. If the user prefers zero residual risk, direct that
P8 exclude the state-bucket name from externalization entirely
(externalize only resource ARNs, leave the backend `bucket` literal).
Confidence 0.55; auto-resolved per `config.autonomy.level=full`.
---
## Run: 2026-07-30 (mode: interactive, focus: v1.15-Nova rebrand, all 9 axes)
### Verdict: Proceed with conditions (confidence: 0.82)
A Major/breaking rebrand (ACDL → Nova) across prose, decks, code, env vars,
consumer path, SSM path, AWS tag keys, and AWS resource names — 4 execution
phases + 1 final. The plan is technically sound and the scope is user-directed
(D-102..D-112). Three binding mitigations surfaced (G-104, G-106, G-108); the
rest accept the plan as written. Two findings carry residual risk that is
accepted at full autonomy (G-103, G-107). No escalations remain open — all
auto-resolved with assumption logging per `config.autonomy.level=full`.
The single most material correction: **the versioning scheme was wrong**.
The plan tagged a Major/breaking milestone on the v1.14.x PATCH line
(`v1.14.5` = release), contradicting every prior breaking milestone in the
project (v1.1→v1.2.0, v1.5→v1.5.0, v1.11→v1.11.0 — all minor bumps). The
quoted "Major = progressive minor per phase" rule does not exist in any repo
file. **G-104 binds: re-tag as v1.15.x minor-bumped phases** (P1→v1.15.0 …
P5→v1.15.4, with v1.15.4 IS the milestone release).
### Per-axis findings
#### Axis 1 — Feasibility
**Challenge:** Can the full rebrand (1,465 `ACDL`/`acdl` occurrences across 205
files, 21 env vars, 11 AWS resources, 5 tag keys, 67 SSM refs, 23 consumer-path
refs) actually be done in 4 execution phases? The migration ordering
(docs→code/env→SSM/tags→AWS resources→final) is sound: P1 has no runtime impact,
P2's dual-read fallback prevents deployment breakage, P3's parallel-tag period
prevents ABAC lockout, P4's staged terraform migration prevents a big-bang
failure. The phase dependencies (P2 depends on P1's migration guide; P3 depends
on P2's dual-read + nova_tagging warn mode; P4 depends on P3's hard-mode tag
enforcement; P5 depends on all) are correctly ordered. **Confidence 0.85** that
the 4-phase structure is feasible. The `terraform init -migrate-state` approach
for the state bucket is the documented, correct mechanism (back up state JSON
first). No hidden dependencies found: the `.env.secrets` direct-read path
(G-106) and the Gitea secrets rotation (G-108) are the only mechanic gaps, both
now bound. **Verdict: ACCEPT-AS-IS.** **G-103.**
#### Axis 2 — Scope
**Challenge:** Is the full AWS resource rename WITH migration (downtime
accepted) over-scoped for a rebrand? D-102 locked this as user-directed. The
alternative (rename code only, leave AWS resources as `acdl-*`) would leave a
permanent brand inconsistency between code and cloud — acceptable for an NFR
patch, not for a "Major/breaking" milestone. The S&P visual theme is correctly
out of scope (D-107). The real Gitea repo name stays `acdl` (D-105) — sensible
(repo rename is a separate operational burden). Past Gitea release titles stay
`ACDL vX.Y.Z` (forward-only) — sensible (no history rewrite). Git branch/tag
naming has no brand name (D-112) — sensible. **Missing from scope:** the CI
workflow secret-references (`.gitea/workflows/*` `secrets.ACDL_*`) — P2 task 3
creates `NOVA_*` Gitea secrets but the plan does not show the workflow YAML
`secrets:` references being updated; G-108 binds the mitigation. **Confidence
0.80.** **Verdict: ACCEPT-AS-IS.** **G-104** (versioning — see Axis 5).
#### Axis 3 — Cost
**Challenge:** What's the real cost (downtime, person-hours, risk) and is it
justified for a *rebrand*? Per A1 (conf 0.9), no live AWS apply during P0P4 —
so the migration scripts are authored but not executed; the live apply is an
operator runbook step. Person-hours are the agent's own (autonomous OSS
reference, G-003 carries forward). Downtime is accepted (D-102) but deferred to
the operator runbook. Token cost: the 1,465-occurrence rename across 205 files
is a large but mechanical edit — the explore survey already quantified the
mechanical-vs-judgment split. The risk cost (DynamoDB data loss, state bucket
corruption, ABAC lockout) is mitigated by the staged ordering + dual-read +
parallel-tag — all plan-validated, not live-applied. For an OSS reference with
0 consumer adoption (PROJECT.md:487), the cost is bounded. **Confidence 0.80.**
**Verdict: ACCEPT-AS-IS.** **G-105.**
#### Axis 4 — Schedule / risk
**Challenge:** DynamoDB data loss, state bucket migration, ABAC breakage,
consumer disruption. The mitigations: (a) DynamoDB scan+copy with row-count
verification, keep old tables until verified (manual post-verification deletion
— point of no return documented); (b) state bucket `terraform init
-migrate-state` with state JSON backup first; (c) parallel-tag ABAC period
(emit nova:* + acdl:* → swap policy → remove acdl:*); (d) consumer disruption
mitigated by the dual-read fallback (P2P4) + the migration guide (P1). The top
3 assumptions: A1 (no live apply — conf 0.9, verified by the established
v1.11v1.14 pattern), A2 (.env.secrets keys renamed, values stay — conf 0.85,
now bound by G-106), A3 (Gitea release API reachable — conf 0.8, verified HTTP
200). The single risk that could kill the project: state bucket corruption
during `-migrate-state` — mitigated by the backup-first runbook step. No
pre-mortem beyond the runbook is documented, but the staged ordering IS the
de-facto pre-mortem mitigation. **Confidence 0.78.** **Verdict: ACCEPT-AS-IS.**
**G-106.**
#### Axis 5 — Technical soundness
**Challenge:** Is the dual-read fallback design sound? Is the parallel-tag ABAC
migration safe? Is `terraform init -migrate-state` correct? **Dual-read:**
sound in principle (NOVA_X preferred, ACDL_X fallback), BUT the `.env.secrets`
load path bypasses the `core/env.py` helper — `run_platform.sh:288-289` exports
`$ACDL_AWS_ACCESS_KEY_ID` (hardcoded) and `regression_verify.py:309-312`
parses the file matching `k == "ACDL_AWS_ACCESS_KEY_ID"` (hardcoded). If P2
renames the `.env.secrets` keys to `NOVA_*` but these two readers still read
`ACDL_*`, AWS creds vanish → CAP-013/014/015 (which need live creds for
terraform plan) break → regression gate breaks. **G-106 binds: dual-read in
BOTH load paths** (shell export + Python parser must read NOVA_* first, ACDL_*
fallback, mirroring the helper contract). **Parallel-tag ABAC:** safe — emit
both tag sets, swap policy with acdl:* as secondary condition, verify, remove.
Plan-validated only per A1 (live ABAC stays acdl:* until operator runbook).
**`terraform init -migrate-state`:** correct documented mechanism; backup state
JSON first is the binding safety step. **Versioning contradiction:** the plan
tags a Major milestone on the v1.14.x PATCH line — G-104 binds re-tag as
v1.15.x minor-bumped. **Confidence 0.85.** **Verdict: MITIGATE-BINDING (G-106).**
**G-104, G-106.**
#### Axis 6 — Testability / verifiability
**Challenge:** Can the success criteria actually be verified? Will the
regression gate stay 16/16 across a 1,465-occurrence rename? Is `grep -rni ACDL`
returning 0 realistic? The gate-stays-16/16 binding constraint (PLAN.md:44-49)
requires per-phase fixture updates — P2 updates env-var fixtures, P3 updates
SSM/tag fixtures, P4 updates terraform-name fixtures. The dual-read fallback
test (P2) keeps ACDL_* as the fallback source — this is the ONE allowed
exception to the grep-returns-0 criterion (success criterion 6 exempts it).
`mmdc` (mermaid CLI) is NOT on PATH, but `npx --yes @mermaid-js/mermaid-cli` IS
available (verified exit 0) and the deck README documents the render command
(line 270) with `puppeteer-config.json` for no-sandbox — so the 5 `.mmd` PNG
re-exports in P1 task 3 are feasible. The Gitea secrets rotation (P2 task 3)
was verified: API reachable (HTTP 200), token present, `rotate_spike_key.sh`
pattern exists. **Confidence 0.82.** **Verdict: ACCEPT-AS-IS.** **G-107.**
#### Axis 7 — Security
**Challenge:** Does the rebrand introduce a security regression? (a) ABAC
policy swap window — mitigated by the parallel-tag period (nova:* + acdl:*
both valid → swap → remove); plan-validated only, no live window during P0P4.
(b) Secret rotation — `.env.secrets` keys renamed (values stay, no
re-rotation needed until P5); G-106 binds the dual-read in both load paths so
creds don't silently vanish. (c) `.env.secrets` key rename — the file contains
live rotated AWS creds + a Gitea token; renaming keys is cosmetic (same values)
but the load-path readers must follow (G-106). (d) IAM policy scope (v1.14 P9
scoped `Resource: "*"`) — the rebrand renames `acdl-*` ARNs to `nova-*` in
terraform; the IAM policy `Resource` patterns must be updated to `nova-*`
P4 task 2 covers this (`acdl-spike-runner``nova-spike-runner`). No new
security regression introduced; the rebrand is nomenclature, not a permission
change. **Confidence 0.80.** **Verdict: ACCEPT-AS-IS.** **G-108.**
#### Axis 8 — Maintainability
**Challenge:** Will the dual-read fallback + parallel-tag period create
technical debt that's hard to clean up? Is P5 (remove fallback) realistic? The
dual-read (P2) + parallel-tag (P3) IS technical debt by design — it exists to
be removed in P5. P5 does six things in one phase (remove fallback, hard-fail
acdl:*, delete Gitea ACDL_* secrets, remove .env.secrets legacy comment,
multi-persona review + audit, milestone ship). The risk: P5's removal surfaces
a break if P2P4 didn't catch every ACDL_* reference in the platform's OWN CI
workflows. But P5 is mechanical cleanup: `get_env()` drops the fallback branch,
shell scripts drop `:-$ACDL_X`, `nova_tagging.py` flips warn→hard-fail. The
grep-returns-0 success criteria are verifiable. The 0-consumer-adoption state
(PROJECT.md:487) means no external consumer breaks at P5; only the platform's
own CI must be fully migrated by P4. **Confidence 0.78.** **Verdict:
ACCEPT-AS-IS.** **G-109.**
#### Axis 9 — Adversarial
**Challenge:** Worst-case scenario? What breaks first? Rollback plan if P4
goes wrong mid-flight? **Worst case:** the `terraform init -migrate-state`
corrupts the state bucket JSON and the backup was incomplete — you lose
terraform state for the microservice + static-assets stacks. **Mitigation:**
the runbook binds "back up the state JSON first" before each `-migrate-state`;
keep old DynamoDB tables until verified (manual post-verification deletion =
the point of no return). The staged ordering (KMS alias → SNS/SG → Lambda →
DynamoDB → ECR → IAM → state bucket → ALB last) means a mid-flight failure at
any step leaves prior steps intact and old resources still named `acdl-*`. The
dual-read fallback (P2P4) means the runtime tolerates both `acdl-*` and
`nova-*` during the window — so a partial migration doesn't break the running
platform. **What breaks first:** the `.env.secrets` load path (G-106) — if the
key rename + reader update are misaligned, AWS creds vanish and the regression
gate breaks immediately. G-106 binds the mitigation. **Rollback:** the runbook
is the rollback; the staged ordering with "keep old until verified" is the
safety net. ALB recreate (last, brief downtime) is the only hard-downtime step;
rollback = recreate the old ALB. **Confidence 0.75.** **Verdict: ACCEPT-AS-IS.**
**G-110.**
### Binding decisions (G-103..G-110)
| ID | Axis | Decision | Confidence | Rationale |
|----|------|----------|-----------|-----------|
| G-103 | 1 (Feasibility) | ACCEPT-AS-IS | 0.85 | 4-phase structure is feasible; migration ordering (docs→code/env→SSM/tags→AWS→final) is sound; phase dependencies correctly ordered; `terraform init -migrate-state` is the correct mechanism. |
| G-104 | 2/5 (Scope/Technical) | MITIGATE-BINDING | 0.90 | **Re-tag as v1.15.x minor-bumped phases** (P1→v1.15.0 … P5→v1.15.4, v1.15.4 IS the milestone release). The v1.14.x PATCH-line scheme contradicts every prior breaking milestone (v1.1→v1.2.0, v1.5→v1.5.0, v1.11→v1.11.0). The quoted "Major = progressive minor per phase" rule exists in NO repo file. A Major/breaking milestone shipping as v1.14.5 means the semver MAJOR never advances despite a breaking change — consumers on `@v1` silently absorb the rebrand. Update PLAN.md, ROADMAP.md §v1.15, PROJECT.md §v1.15, and ARCHITECTURE.md §v1.15 Addendum tag references. |
| G-105 | 3 (Cost) | ACCEPT-AS-IS | 0.80 | No live AWS apply during P0P4 (A1); migration scripts authored, not executed; downtime accepted (D-102) but deferred to operator runbook. For an OSS reference with 0 consumer adoption, cost is bounded. |
| G-106 | 4/5 (Risk/Technical) | MITIGATE-BINDING | 0.88 | **Dual-read in BOTH `.env.secrets` load paths.** `run_platform.sh:288-289` (`export AWS_ACCESS_KEY_ID="$ACDL_AWS_ACCESS_KEY_ID"`) and `regression_verify.py:309-312` (parses file matching `k == "ACDL_AWS_ACCESS_KEY_ID"`) bypass the new `core/env.py get_env()` helper. P2 MUST update both readers to read `NOVA_*` first with `ACDL_*` fallback — mirroring the dual-read contract. Without this, renaming `.env.secrets` keys to `NOVA_*` breaks AWS creds → CAP-013/014/015 fail → regression gate breaks. Old `ACDL_*` keys removed in P5. |
| G-107 | 6 (Testability) | ACCEPT-AS-IS | 0.82 | Per-phase fixture updates keep the gate 16/16 (PLAN.md:44-49 binding constraint). `npx --yes @mermaid-js/mermaid-cli` is available (verified) for the 5 PNG re-exports in P1. Gitea API reachable (HTTP 200) + token present for P2 task 3. |
| G-108 | 7 (Security) | MITIGATE-BINDING | 0.80 | **P2 task 3 must update the CI workflow `secrets:` references** (`.gitea/workflows/*`, `.github/workflows/*`) when `NOVA_*` Gitea secrets are created, with graceful degrade + retry on API failure. The plan creates `NOVA_*` aliases but does not show the workflow YAML `secrets.ACDL_*` references being updated. If the workflows still reference `ACDL_*` secrets at P5 (when old secrets are deleted), CI breaks. The Gitea secrets rotation must be a hard gate with retry-on-failure (not a silent skip). |
| G-109 | 8 (Maintainability) | ACCEPT-AS-IS | 0.78 | P5 is mechanical cleanup (drop fallback branch, hard-fail acdl:*, delete old secrets); 0-consumer-adoption means no external break at P5; grep-returns-0 is verifiable. |
| G-110 | 9 (Adversarial) | ACCEPT-AS-IS | 0.75 | Runbook + staged ordering is the rollback; "keep old until verified" is the safety net; ALB recreate (last) is the only hard-downtime step. The `.env.secrets` load path (G-106) is what breaks first if misaligned — G-106 binds the mitigation. |
### Escalations
None remain open. All material questions resolved with confidence ≥ 0.60.
Two findings carry accepted residual risk (auto-resolved at full autonomy
with assumption logging):
- **G-103 (Axis 1):** residual risk that the 4-phase structure underestimates
the 1,465-occurrence rename effort — accepted; per-phase fixture updates
(G-107) + the explore survey's mechanical-vs-judgment split bound the effort.
- **G-107 (Axis 6):** residual risk that a test fixture is missed during the
per-phase rename, breaking 16/16 at a phase boundary — accepted; the
per-phase verify step (run the gate before tagging) catches it before ship.
### Forcing questions asked (7)
1. **Versioning contradiction** — Major milestone on v1.14.x PATCH line vs.
prior breaking milestones all minor-bumped. → **G-104 MITIGATE-BINDING**
(re-tag as v1.15.x).
2. **P4 migration completeness** — plan-validated terraform vs live AWS
resources still `acdl-*`. → **G-103/105 ACCEPT-AS-IS** (runbook for live).
3. **`.env.secrets` key rename mechanic** — dual-read helper bypassed by direct
shell/Python readers. → **G-106 MITIGATE-BINDING** (dual-read in both load
paths).
4. **Gitea secrets rotation** — API reachable, token present, but workflow
`secrets:` references not shown updated. → **G-108 MITIGATE-BINDING** (update
workflow refs, hard gate + retry).
5. **ABAC parallel-tag window** — over-engineered for 0 consumers, or correct
forward-looking safety net? → **G-108/Axis-4 ACCEPT-AS-IS** (parallel-tag is
the mitigation, plan-validated).
6. **Regression gate during rebrand** — 16/16 across 1,465-occurrence rename?
**G-107 ACCEPT-AS-IS** (per-phase fixture updates).
7. **P5 fallback removal realism** — cleanup + review + audit + ship in one
phase? → **G-109 ACCEPT-AS-IS** (mechanical cleanup).
8. **P4 rollback plan** — runbook + staged ordering sufficient? → **G-110
ACCEPT-AS-IS** (staged ordering is the rollback).
### What the project is NOT doing that it should (adversarial close)
- **Documenting the versioning rule it now follows.** G-104 binds the
v1.15.x minor-bumped scheme, but no `.ciagent/` file records the
versioning convention. The plan should add a one-line versioning note to
PROJECT.md §v1.15 or a `VERSIONING.md` so the next milestone doesn't
re-litigate this.
- **Quantifying the live state volume** for the DynamoDB scan+copy + state
bucket migration. The runbook says "back up first" + "verify row counts" but
doesn't quantify the data. For 0-consumer-adoption, this is likely tiny —
but the rollback feasibility (G-110) depends on it being small enough to
re-scan. Accepted residual risk.
### Simplest 80%-value version
The simplest version that delivers 80% of the rebrand value: **P1 (docs/decks)
+ P2 (code/env dual-read) + P5 (ship)** — skip the live AWS resource migration
(P3 SSM/tags + P4 AWS resources) entirely. The code + docs would say Nova; the
cloud would still say `acdl-*`. This is the "rename code only, leave cloud"
option D-102 rejected. The user chose the full migration (D-102) — the binding
decision is recorded; the 80% version is NOT the chosen path. The full scope is
accepted as user-directed.
### What must be true for success in the next 90 days, and is it true today?
1. **The dual-read helper + both `.env.secrets` load paths are updated in
lockstep (G-106).** — TRUE after P2 binds G-106; FALSE today (the direct
readers still hardcode `ACDL_*`).
2. **The regression gate stays 16/16 at every phase boundary (G-107).**
TRUE if per-phase fixture updates are complete before each tag; the
per-phase verify step enforces it.
3. **The CI workflow `secrets:` references are updated when `NOVA_*` Gitea
secrets are created (G-108).** — FALSE today; P2 task 3 must be expanded to
include the workflow YAML updates.
4. **The versioning scheme is corrected to v1.15.x (G-104).** — FALSE today;
the plan says v1.14.x. Must be corrected before P0 ship.
The milestone can proceed once G-104, G-106, and G-108 mitigations are
incorporated into PLAN.md. Confidence 0.82.