AUTONOMY_THESIS.md (git mv from NO_HUMANS_THESIS.md): reframe from 'removing humans' to 'autonomy in operations, human at stage gates'. Drop D-### citations + internal file paths; keep anti-claims, reworded. Anti-claim #1 now: 'decisions are NOT made by an LLM — deterministic scripts calculate a score; the platform functions without AI'. NORTH_STAR.md: - Vision: 'invisible' → 'visible' (operations become visible — recurring theme); polish for technical audience (security, remediation velocity, reliability, lead time). - Objective #2: 'provable trust in AI decisions' → 'provable trust in automated decisions' (deterministic scripts calculate a score; platform functions without AI). - Objective #3: four CTO-grade metrics (Lead Time PR→Prod, Infra Vuln Count trend, MTTR, Cloud Spend Reduction) → all flow into PowerBI. - Objective #4: 'default substrate for agentic consumption' → integrate with externally owned PDLC/SDLC/Agentic/Citizen Developer platforms regardless of source; Nova provides skills + MCP endpoints; all prod intents go through the same controls + quality gates. - Anti-goals: drop #1 (hyperscaler competitor), #4 (legacy untagged), #5 (sold to operators). Add: 'not an upstream development platform', 'not a replacement for the PDLC'. Reword #3 (no 'removes humans'). docs/raci.md: 3 roles → 4 roles. Add Quality Engineering column. Rename Release Management → SRE. Split release attestation into Quality attestation (QA) + Production readiness (SRE). Platform no longer holds A for attestation — reassigned to QE/SRE. docs/scope.md: add integration framing (skills + MCP endpoints, all sources go through same controls). Render scripts: default deck name → nova-autonomous-cloud-delivery. ONBOARDING + terraform/onboarding: 'no-humans' → 'autonomous'. ---ci--- project: acdl phase: 1 milestone: v1.21 status: execute phase_role: execution ---/ci---
12 KiB
NORTH_STAR — Nova
Status: Draft (pending interactive GRILL → final) Milestone: v1.21 — Nova Deck Refinement & Pipeline Hardening Owner: Product Owner Purpose: Durable strategic intent. Read by CIAgent in every future
/ci-runso the platform's direction survives across milestones. This is NOT a status document (that's PROJECT.md) and NOT an engineering architecture (that's the telemetry reference in RESEARCH.md/ ARCHITECTURE.md). It is the PO's committed direction: what we're building toward, what we refuse to build, and how we'll know we won.
Vision
Infrastructure operations become visible. Every environment provisioned, every incident healed, every risk remediated — by an autonomous system whose trustworthiness is provable, not promised. Human attestation remains required at stage gates — QA signs off for production, SRE greenlights based on operational readiness — but the operator is never in the loop of normal operations.
Nova is the autonomous infrastructure layer that lets product teams ship without engaging an operator, and lets executives trust the platform not because it never fails but because every decision is captured, scored, and accountable. The recurring theme across the platform is that infrastructure operations become visible — security posture, remediation velocity, reliability, and lead time are surfaced as queryable signals rather than hidden in tribal knowledge.
Strategic Objectives (4)
1. Demonstrate production-grade zero-touch operations. Nova must run real customer estates with no human in the loop of normal operations — autonomy as the default, not the demo. Stage-gate attestation (QA for production, SRE for operational readiness) remains human by design; operational escalations (AI confidence too low to proceed) are the failure mode we drive toward zero. Everything else collapses if autonomy isn't real.
2. Establish provable trust in automated decisions. Trust is established by deterministic scripts that calculate a score and a band outcome that gates the action — the platform functions without AI. "AI decisions" are really automated decisions. The audit substrate — Decision Ledger, confidence scoring, circuit breakers, blast-radius controls — turns "autonomous" from a marketing claim into a defensible one. Trust is the moat. Features can be copied; an immutable, queryable decision history cannot.
3. Deliver compounding, quantifiable ROI for customers. Each quarter on Nova must show measurable improvement on four CTO-grade metrics, all of which flow into PowerBI views and are captured by the telemetry pipeline:
- Lead Time — from PR merge to production deployment (downward trend).
- Infrastructure Vulnerability Count — open findings on deployed resources (downward trend, demonstrating that proactive scanning + remediation keeps up with the AI-era 0-day pace).
- MTTR — for platform-detected and platform-remediated incidents.
- Cloud Spend Reduction — on pilot estates vs. the pre-Nova baseline.
If leadership cannot point to a number that improves quarter-over-quarter on these four axes, Nova fails its commercial test, regardless of how clever the automation is.
4. Integrate with externally owned development platforms — regardless of source. Nova integrates with externally owned PDLC, SDLC, Agentic, and Citizen Developer platforms with no regard for the source of the intent. Nova provides a set of skills and MCP endpoints that help the developer or AI agent make their application production-grade. Regardless of the source, all intents to deploy to production go through the same rigorous controls, quality gates, attestation, and evidence stream. Nova is the layer any of those platforms reach for first when an agent needs to deploy — not a vendor arriving late to that market.
Anti-Goals (4 — what Nova is fundamentally NOT)
- Not a general-purpose AI agent platform. We are purpose-built for infrastructure operations. Breadth here produces shallow tools; depth here wins the category.
- Not a system that removes humans from accountability. Only from normal operations. Every automated decision lands in an immutable ledger. Every stage-gate promotion (qa/prod/dr) requires a human attestation recorded with approver identity, separation-of-duties check, and the evidence matrix. The absence of an operator in the loop is never the absence of a record.
- Not an upstream development platform. Nova does not own the product backlog, IDE workflows, code authorship, or application business logic. The PDLC is upstream; Nova integrates with it through a validated contract boundary — Nova never penetrates it.
- Not a replacement for the Product Development Lifecycle (PDLC). Nova governs infrastructure + delivery only. Product lifecycle decisions (what to build, when to ship, for whom) remain with the product team. Nova makes their intent production-grade; it does not own the intent.
Non-Goals (v1.17 milestone scope — deferred work, not permanent boundaries)
Anti-Goals are what Nova fundamentally is not. Non-Goals are what we will not do this milestone — deferred work, not permanent boundaries. Each Non-Goal cites the controlling decision ID.
- Live AWS re-provisioning (deferred — D-096). Metrics that require live infrastructure ship as placeholder PowerBI views with documented schemas.
- Onboarding auto-grant (deferred — D-113/D-114/D-119). Only the request-path metric is grounded; the requested→granted funnel is a placeholder.
- ML anomaly-forecasting / predictive remediation (no emitter today). The Predictive-vs-Reactive metric ships as a placeholder.
- Drift detection scheduled job (deferred — D-096 + no scheduler). Drift metrics ship as placeholders.
- Live cost CUR reconciliation (deferred — D-096). Pre-apply Infracost estimates are grounded; actual-spend reconciliation is a placeholder.
- S3 Object Lock / JWS tamper-evident ledger (deferred — D-083). The Decision Ledger uses a local SQLite hash-chain this milestone; the Object-Lock/JWS build-out is a future milestone.
- Multi-cloud support (Azure/GCP/K8s). Nova is AWS-only this milestone.
12–18 Month Targets
Targets are committed, not aspirational. Each is a number a board member can repeat back to us. The grounding column records whether the metric is measurable this milestone, and if not, what blocks it.
Honesty note (GRILL G-Q6 binding): Nova has 0 consumer adoption today (
PROJECT.md:495). Three targets (Touchless Resolution, Human Escalation, AI Decision Accuracy) are scoped "across production estates" — the measurement pipeline is grounded this milestone, but the denominator is zero until a pilot estate activates. These targets are reclassified as Post-Pilot (the pipeline works; the numbers fill when consumers exist). This is the same honesty model as Cloud Spend Reduction (partial: pipeline grounded, actuals deferred).
Current-milestone targets (grounded or derived this milestone)
| Domain | Target | Grounding (v1.17) | Note |
|---|---|---|---|
| MTTR (p95) | < 60 seconds | grounded (platform-run MTTR) | apply.failed → successful retry; infra-incident MTTR deferred (no incident detection) |
| Cloud Spend Reduction | ≥ 25% on pilot estates vs. 12-month pre-Nova baseline | partial | pre-apply estimate grounded (Infracost); actual-spend deferred (D-096 CUR) |
| L1 / L2 Ops Hours Avoided | ≥ 70% of pre-Nova FTE allocation | derived | formula over run count × manual baseline (computed on N internal runs; production-denominator activates post-pilot) |
| Platform ROI | ≥ 250% measured annually | derived | formula (labor savings + cloud savings + avoided downtime) ÷ platform op cost (computed on N internal runs; production-denominator activates post-pilot) |
| Decision Ledger Coverage | 100% of AI actions with backfilled outcome | grounded (this milestone builds it) | outbox_writer.py → SQLite hash-chain |
| Attestation Coverage | 100% of prod/dr promotions attested by a human | grounded | hitl_gates.py + outbox approver_* attributes; separation-of-duties on prod |
Post-Pilot targets (pipeline grounded this milestone; denominator activates when a pilot estate runs)
| Domain | Target | Grounding (v1.17) | Note |
|---|---|---|---|
| Touchless Resolution Rate | ≥ 99% across production estates | partial (pipeline grounded; denominator = 0 today) | runs completing without operational HITL block ÷ total runs (attestation gates excluded); activates post-pilot |
| Human Escalation Frequency | < 0.1% of platform actions | partial (pipeline grounded; denominator = 0 today) | operational HITL blocks only (confidence-driven); attestation sign-offs excluded; activates post-pilot |
| AI Decision Accuracy | ≥ 99.5% (no rollback, no follow-up incident within 5 min of action) | partial (pipeline grounded; denominator = 0 today) | decisions not followed by apply.failed/incident within 5min; activates post-pilot |
Deferred targets (measurement requires future systems)
| Domain | Target | Grounding (v1.17) | Note |
|---|---|---|---|
| Predictive vs. Reactive Ratio | ≥ 3 : 1 (prevention dominates reaction) | deferred | requires ML forecasting service (future emitter) |
| Drift Auto-Reversal Rate | ≥ 95% within one detection cycle | deferred | requires drift detection (D-096 + scheduler) |
Committed targets whose measurement is deferred remain committed — the target is the destination; the metric is the odometer, and some odometers aren't built yet. Each deferred metric ships as a placeholder PowerBI view + a definition-of-success doc recording the dependency. Post-Pilot targets are committed targets whose measurement pipeline is grounded this milestone; the numbers activate when a pilot estate runs.
Future Horizons (strategic direction, not committed targets)
| Domain | Aspiration | Note |
|---|---|---|
| AI-Agent Intent Share | ≥ 40% of total intent volume originated by non-human consumers | Strategic Objective #4 direction. No backing requirement, no placeholder view, no emitter today. Moves to a committed target when agentic consumption is real. |
Success Criteria (v1.17 — what constitutes success for THIS milestone)
Distinct from the 12–18mo targets: those are the destination. These are the milestone's exit criteria.
v1.17 is a success if:
- Decision Ledger emits
ai.decision.madefor 100% of platform runs with outcome backfill, ANDattestation.recordedevents for 100% of qa/prod/dr promotions (event completeness — all 3 gates captured; grounded inoutbox_writer.py→ SQLite hash-chain; honors D-083). The Attestation Coverage metric (target 100%) measures prod/dr promotions specifically — see REQ-194. docs/METRICS.mdcatalogs every executive KPI with agrounded/derived/deferredstatus, a source file or decision ID, and a per-KPI definition-of-success doc indocs/metrics/.- The PowerBI export produces all fact/dimension views + 8 empty placeholder views for deferred metrics (with documented schemas ready to fill when their blocking decisions lift).
- The unified narrative deck ships with the x3 arc (Problem→Vision→How→Proof→Roadmap) at deck + slide level, per-slide benefit callouts, and fluid transitions; both old decks retired.
NORTH_STAR.mdis wired into CIAgent context-loading so every future/ci-runreads it.- CAP-023 (metrics collector) + CAP-024 (deck structure) pass in the regression gate.
What "won" looks like
By month 18, Nova is the layer enterprise leadership points to when they say "we don't have an infrastructure ops team anymore, and the audit trail is stronger than it ever was" — and it is the default substrate their AI engineering teams reach for first when an agent needs to deploy.
Relationship to v1.17 engineering
- Pillar A (this file): strategic direction — durable, PO-authored.
- Pillar B (engineering): the telemetry reference architecture (adapted from the PO's technical-direction input) lives in RESEARCH.md/ARCHITECTURE.md. It is the how; this file is the why.
- Pillar C (story): the unified narrative deck proves Pillars A+B to leadership. The deck's Proof section cites grounded metrics; its Roadmap section cites deferred targets honestly.