Files
acdl/.ciagent/AUDIT.md
T
Jon Chery 7cccf989b1
acdl-ci / Lint (push) Successful in 7s
acdl-ci / Test (push) Successful in 26s
acdl-ci / Platform check-only (offline) (push) Successful in 8s
audit(v1.9): PASS — ARCHITECTURE.md v1.9 addendum + audit report
---ci---
phase: 43
milestone: v1.9
status: complete
---/ci---

Audit of the shipped v1.9 milestone:

Reconstruction: PASS — 16 v1.9 commits, all with ---ci--- blocks;
state reconstructs to milestone v1.9, phase 43, status complete.
Decisions D-080..D-089 all present in git log + .ciagent/ files.

File discipline: PASS — config.json, PROJECT.md, ROADMAP.md,
REQUIREMENTS.md, REVIEW.md, PERSONAS.md, VERIFY.md all consistent.
Fixed: ARCHITECTURE.md had no v1.9 coverage — added a v1.9 addendum
covering all 9 new code components (contract_resolver interpolation,
environment_check.load, hitl_gates, attestation_matrix,
separation_of_duties.route_halt_artifact, WizClient, kyverno_adapter,
per-env promotion, adapter parameterization) + the deferred D-083 items.

Branch hygiene: PASS — only main (local + remote); all 5 v1.9 phase
branches merged + pruned.

Commit discipline: PASS — 16/16 commits with ---ci--- blocks; no stale
implementation decisions; no unresolved v1.9 escalations.

Audit result: PASS.
2026-07-23 12:04:08 +00:00

63 lines
2.8 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# ACDL v1.9 — Audit Report
> Audit date: 2026-07-23. Auditor: ci-debugger. Milestone: v1.9. Result: PASS.
## Step 1: Reconstruction Test
- 16 v1.9 commits with `---ci---` blocks (specify → clarify → research →
plan → execute ×4 phases → verify/complete → review-fix).
- Reconstructed state: milestone v1.9, phase 43, status complete.
- Pipeline stages traversed: specify → clarify → research → plan → execute → verify → complete.
- Decisions D-080..D-089 all present in git log + `.ciagent/` files.
- config.json (v1.9 complete), PROJECT.md (v1.9 complete), REQUIREMENTS.md
(v1.9 complete, 12 reqs), ROADMAP.md (v1.9 complete, phases 3943),
REVIEW.md (READY TO SHIP), PERSONAS.md (v1.9), VERIFY.md, AUDIT.md.
**PASS.**
## Step 2: File Discipline
- `.ciagent/config.json`: valid JSON; mode, projects[] present. **PASS.**
- `.ciagent/PROJECT.md`: Vision/Core Value (≡ "What This Is"), Key
Decisions (v1.9 D-080..D-086), Requirements, Constraints, per-milestone
Objective sections (≡ "Milestones") present. Section names follow the
v1.0 established conventions (not the generic audit template). **PASS.**
- `.ciagent/ROADMAP.md`: phases 3943 present; all marked complete.
**PASS.**
- `.ciagent/REQUIREMENTS.md`: v1.9 traceability table complete (12/12
REQ-100..111 marked `complete (v1.9.0)`). **PASS.**
- `.ciagent/ARCHITECTURE.md`: **fixed during audit** — v1.9 addendum
added covering all new components (contract_resolver interpolation,
environment_check.load, hitl_gates, attestation_matrix,
separation_of_duties.route_halt_artifact, WizClient, kyverno_adapter,
per-environment promotion, adapter parameterization, deferred D-083).
All 9 v1.9 code components now referenced. **PASS (after fix).**
## Step 3: Branch Hygiene
- Local: `main` only. Remote: `origin/main` only.
- No phase or milestone branches remain (all 5 v1.9 phase branches merged
+ pruned during the run/ship workflow).
- No orphan branches.
**PASS.**
## Step 4: Commit Discipline
- 16/16 v1.9 commits have `---ci---` blocks with project/phase/milestone/
status fields.
- No stale implementation decisions (D-081..D-085, D-087..D-089 all have
code refs; D-080 + D-086 are process/meta decisions correctly living in
`.ciagent/` files).
- No unresolved v1.9 escalations (the 3 `audit(...)` commits in history
are from prior milestones v1.0/v1.6/v1.7).
**PASS.**
## Issues fixed during audit
1. **ARCHITECTURE.md missing v1.9 addendum** — the architecture doc had
no coverage of the v1.9 new components (hitl_gates, attestation_matrix,
interpolation, per-env promotion, adapter parameterization, Wiz/Kyverno
flesh-outs). Fixed: added a v1.9 addendum section covering all 9 new
code components + the per-env promotion model + the deferred D-083
items. Verified all 9 components now referenced.
## Audit result: PASS