6b410d9ab4
P2 W1: PROJECT.md v1.26 phase-status block (lines 428-438): - P3/P4/P5 'pending' → 'complete' with shipped tags (v1.25.3/4/5) - v1.26 Overview marked shipped (merged to main 2026-08-19) - Added STATE.md pointer to Capability Status section header - Updated CAPABILITY_INVENTORY.md refs → archive/CAPABILITY_INVENTORY-v1.10.md P2 W2: ROADMAP.md v1.26 section: - P3/P4/P5 'planned' → 'complete' with shipped tags - v1.26 Overview '(active, ...)' → '(complete, tag v1.25.5, merged to main)' - Added STATE.md to v1.25 + v1.26 P5 'Updated at ship' lists P2 W3: Wired STATE.md into ship discipline: - PLAN.md: added 'Durable convention (v1.27 establishes)' section — every future P-final Wave 3 file-update list includes STATE.md (append new capability rows, mark deprecations, bump 'Last milestone ship' header). - NORTH_STAR.md: added 'Relationship to engineering files (v1.27 update)' section — STATE.md is the *what exists* catalog (PO-owned, additive); NORTH_STAR is the *why*; ARCHITECTURE the *how*; CHECKPOINT the *now*. P2 W4: archive README + consumer PROJECT pointer: - archive/README.md: added 'v1.27 compression — archived files (8 files, lossless git mv)' section with 3 tables (3 superseded refs + 4 v1.26 verifications/review/evidence + 1 consumer) + a note on the v1.26 pre-execution artifacts (in git history, not on disk). Updated 'Why archive' to record both compressions (v1.26 P2 + v1.27 P1). - nova-blockchain-exchange/PROJECT.md: added phase-by-phase history pointer to platform ROADMAP §v1.26 (consumer ROADMAP archived). P2 W5: Fixed remaining dangling references to archived files: - ARCHITECTURE.md §12.8 line 566: P4-PILOT-RUN-EVIDENCE.md → archive/ - nova-blockchain-exchange/README.md (3 refs): P4-PILOT-RUN-EVIDENCE.md → archive/P4-PILOT-RUN-EVIDENCE-v1.26.md - IAM_POLICY.md (2 refs): CAPABILITY_INVENTORY.md → archive/ Verified: 0 active dangling references remaining (grep confirms all matches are in archive/ or v1.27 P0 records describing the archive). ---ci--- project: acdl phase: 2 milestone: v1.27 status: execute wave: W6 ---ci---
127 lines
6.4 KiB
Markdown
127 lines
6.4 KiB
Markdown
# `.ciagent/archive/` — Completed-Milestone History
|
||
|
||
This directory holds byte-identical snapshots of `.ciagent/` files that
|
||
were compressed out of the active agent context. Compression is **lossless
|
||
via relocation**: every original byte is reachable here, and the git
|
||
history at the commit prior to compression preserves the authoritative
|
||
state for offline agent loading.
|
||
|
||
## Why archive
|
||
|
||
The active milestone is v1.27 (PO State Catalog & Ciagent Compression).
|
||
The `.ciagent/` root was compressed twice:
|
||
|
||
1. **v1.26 P2 compression** (~11,164 lines → ~5,232): the
|
||
completed-milestone narratives (v1.0–v1.24) were relocated. Per the
|
||
run.md context-loading model, agents read `.ciagent/` every
|
||
`/ci-run`; the historical narrative was not load-bearing for v1.26
|
||
execution and was relocated to keep the working context lean.
|
||
2. **v1.27 P1 compression** (~5,232 → ~3,882): the v1.26 phase
|
||
verifications + review + evidence + the dated CAPABILITY_INVENTORY
|
||
(superseded by STATE.md) + AUTONOMY_THESIS (folded into NORTH_STAR)
|
||
+ COST (predates v1.26 pilot) were relocated. The 4 pre-execution
|
||
files (CLARIFY/GRILL/IDEATE/RESEARCH) were rewritten by v1.27 P0
|
||
and stay active through v1.27.
|
||
|
||
## Contents
|
||
|
||
### Snapshots of slimmed files (full content before compression)
|
||
|
||
| File | Original (lines) | Replaces | Status at time of snapshot |
|
||
|---|---|---|---|
|
||
| `PROJECT-v1.0-v1.24.md` | 1784 | `.ciagent/PROJECT.md` | v1.0–v1.24 milestone-by-milestone narrative + active milestone v1.26 sections |
|
||
| `REQUIREMENTS-v1.0-v1.24.md` | 2490 | `.ciagent/REQUIREMENTS.md` | All requirements v1.0 (REQ-01) through v1.26 (REQ-322) |
|
||
| `ROADMAP-v1.0-v1.24.md` | 2341 | `.ciagent/ROADMAP.md` | All phase breakdowns v1.0 through v1.26 |
|
||
| `ARCHITECTURE-v1.0-v1.24.md` | 945 | `.ciagent/ARCHITECTURE.md` | Full architecture reference + historical "how we got here" narrative |
|
||
|
||
The slimmed in-place files retain: active milestone v1.26 context, the
|
||
v1.25 milestone (since v1.26 tags ride the v1.25.x line), the durable
|
||
vision/tenets/RACI/capability-status sections, and the current-state
|
||
architecture reference.
|
||
|
||
### Completed-phase artifacts (relocated verbatim)
|
||
|
||
| File | Original (lines) | Phase(s) documented |
|
||
|---|---|---|
|
||
| `REVIEW.md` | 111 | Multi-persona code review records from completed phases |
|
||
| `AUDIT.md` | 553 | Project health audit records (reconstruction tests, branch hygiene) |
|
||
| `VERIFY.md` | 86 | Per-phase verification records |
|
||
| `PRE_MORTEM.md` | 228 | Pre-mortem analyses for completed milestones |
|
||
|
||
### v1.27 compression — archived files (8 files, lossless `git mv`)
|
||
|
||
> The v1.27 NFR milestone (PO State Catalog & Ciagent Compression) archived
|
||
> 7 platform-root files + 1 consumer file. All are byte-identical
|
||
> relocations; git history at the pre-v1.27 commits preserves the
|
||
> authoritative state.
|
||
|
||
#### Snapshots of superseded durable references (3 files)
|
||
|
||
| File | Original (lines) | Superseded by | Status at time of snapshot |
|
||
|---|---|---|---|
|
||
| `CAPABILITY_INVENTORY-v1.10.md` | 120 | `.ciagent/STATE.md` (v1.27) | The 2026-07-27 re-verification sweep (v1.1→v1.8 capabilities). Predates v1.26 pilot (CAP-025 absent; blockchain capabilities absent). |
|
||
| `AUTONOMY_THESIS-v1.21.md` | 65 | `NORTH_STAR.md` Vision + Anti-Goals #2 | "Last refined: v1.21" — the autonomy-in-operations thesis, fully folded into NORTH_STAR.md. |
|
||
| `COST-v1.14.md` | 106 | (future cost milestone) | AWS cost report dated 2026-07-29, framed "v1.0 → v1.14". Predates v1.26 live pilot (ECS + ALB + DynamoDB + S3 costs not reflected). |
|
||
|
||
#### v1.26 phase verifications + review + evidence (4 files)
|
||
|
||
| File | Original (lines) | Phase(s) documented |
|
||
|---|---|---|
|
||
| `VERIFY-P03.md` | 39 | v1.26 P3 verification — PASS (shipped `v1.25.3`) |
|
||
| `VERIFY-P04.md` | 31 | v1.26 P4 verification — PASS (shipped `v1.25.4`) |
|
||
| `REVIEW-AUDIT-P05.md` | 218 | v1.26 P5 final review + audit — PROCEED (shipped `v1.25.5`; 0 P0 remain; audit CLEAN) |
|
||
| `P4-PILOT-RUN-EVIDENCE-v1.26.md` | 46 | v1.26 live apply evidence (`blkex-pilot-apply-v0.2`; confidence 0.800 pass; outcome backfilled; hash chain valid) |
|
||
|
||
#### Consumer subproject archive (1 file)
|
||
|
||
| File | Original (lines) | Phase(s) documented |
|
||
|---|---|---|
|
||
| `nova-blockchain-exchange/archive/ROADMAP-v1.26.md` | 57 | v1.26 consumer roadmap (P3/P4/P5 marked "planned" at archive time; v1.26 shipped `v1.25.5`). Phase narrative preserved in the platform `.ciagent/ROADMAP.md` §v1.26. |
|
||
|
||
#### v1.26 pre-execution artifacts (in git history, not archived to disk)
|
||
|
||
The v1.26 pre-execution files (CLARIFY, GRILL, IDEATE, RESEARCH) were
|
||
overwritten by the v1.27 P0 pre-execution cycle. The v1.26-era content
|
||
is preserved in git history at the pre-v1.27-P0 commits (search the
|
||
log for `docs(P00):` commits on the `milestone/v1.26-pilot-activation`
|
||
line). The v1.27 P0 versions stay active through v1.27; they archive at
|
||
v1.28 P1 if v1.28 happens. Decisions D-200..D-213 (v1.26) are folded
|
||
into `PROJECT.md` load-bearing decisions; D-214..D-225 (v1.27) live in
|
||
the active `CLARIFY.md`.
|
||
|
||
### Live operational files NOT archived
|
||
|
||
These files remain at their canonical `.ciagent/` paths because they are
|
||
read/write targets of live code paths and must not be relocated:
|
||
|
||
- `REGRESSION_REPORT.json` — written by `core/regression_verify.py:705`,
|
||
read by `core/metrics/collector.py:27` + `core/metrics/trust_snapshot.py:21`
|
||
+ `metrics/` views.
|
||
- `REGRESSION_REPORT.md` — written by `core/regression_verify.py:704`,
|
||
referenced by `scripts/run_regression.sh`.
|
||
- `CHECKPOINT.json` — the authoritative resume point for `/ci-run`.
|
||
- `config.json` — operational configuration (no historical content).
|
||
|
||
## How to load archived content
|
||
|
||
Agents that need completed-milestone history can read these files
|
||
directly (they live inside `.ciagent/`, so the path convention holds):
|
||
|
||
```
|
||
.ciagent/archive/PROJECT-v1.0-v1.24.md
|
||
.ciagent/archive/REQUIREMENTS-v1.0-v1.24.md
|
||
.ciagent/archive/ROADMAP-v1.0-v1.24.md
|
||
.ciagent/archive/ARCHITECTURE-v1.0-v1.24.md
|
||
.ciagent/archive/{REVIEW,AUDIT,VERIFY,PRE_MORTEM}.md
|
||
```
|
||
|
||
For the authoritative pre-compression state of any `.ciagent/` file,
|
||
use git history at the commit immediately preceding the compression
|
||
commit (search the log for `chore(P02): compress .ciagent/ files`).
|
||
|
||
## `completed-milestones/`
|
||
|
||
Reserved for future per-milestone summary files if a milestone's
|
||
narrative is too large for the slimmed in-place ROADMAP/PROJECT. Currently
|
||
empty; v1.0–v1.24 narrative is fully preserved in the four snapshot
|
||
files above. |