Jon Chery 031c320551 audit(v1.1): CLEAN — reconstruction, file discipline, branch hygiene, commit discipline
---ci---
project: acdl
phase: 0
milestone: v1.1
status: audit
verdict: CLEAN
---/ci---

v1.1 milestone audit. Verdict: CLEAN — 0 P0 (no critical issues, no
feedback loop to EXECUTE), 5 P1 post-hoc hygiene items flagged for v1.2
cleanup.

Reconstruction test: PASS. HEAD ci block (d6b1923, == v1.2.0 tag) reads
status: complete, milestone: v1.1, requirements.covered: [REQ-16..28] —
matches the prompt's expected block. Walking back through the ci blocks
reproduces plan -> plan-as-execute -> shipped -> verify for every phase
(06-10) with the correct phase numbers + status progression. Tags
v1.1.0..v1.1.5 + v1.2.0 all present; ROADMAP.md phase statuses match the
tags; REQUIREMENTS.md traceability matches (REQ-16..22 -> v1.1.2,
REQ-23 -> v1.1.3, REQ-24/26 -> v1.1.4, REQ-25/27/28 -> v1.1.5).

File discipline: PASS with one P1 hygiene item. All 10 required .ciagent/
files present (config.json, PROJECT, ARCHITECTURE, REQUIREMENTS, ROADMAP,
PERSONAS, PLAN, RESEARCH, VERIFY, REVIEW). PLAN.md = Phase 10 (last
phase, not stale). VERIFY.md = Phase 10 (last verification). REVIEW.md
present (milestone review). No orphan files. PROJECT.md correctly frames
v1.1 as architecture finalization + v1 spike (no "30-min stub demo" as
current objective; v1.0 demo archived under demo/). P1-A: config.json
status field still reads "specify" (milestone is complete); PERSONAS.md
territory paths use stale platform/ prefix (renamed to acdl_platform/ in
Phase 08 prep commit 727c873) on lines 7, 38, 47, 56, 80, 109.

Branch hygiene: PASS. git branch -a shows only main + milestone/v1.0-initial
+ remotes/origin/*. No leftover phase/NN-* branches (all 5 deleted
post-merge). Working tree clean (gitignored artifacts excluded).

Commit discipline: PASS with one P1 hygiene item. 45 of 48 commits in
v1.1.0..HEAD carry a well-formed ---ci--- block with project/phase/
milestone/status from the documented set. The 3 no-ci commits
(52665b8 Add docs/architecture.md, 7614c41 Add docs/vision.md, b84a8a2
Update docs/architecture.md) are pre-specify upstream-doc ingestion
commits — each is an ancestor of the v1.1 specify commit (288607b); they
predate the v1.1 CIAgent protocol and fall inside the audit range only
because v1.1.0 is tagged at the v1.0 Phase 05 traceability commit. P1-C:
document tag-placement guidance in run.md for v1.2. Field usage rules
hold: release.tag only on the 5 ship commits; verdict only on the 5
verify + 1 review commit; requirements.covered on plan-as-execute +
complete. Merges: exactly the 5 documented --no-ff squash-merge ship
commits (each with 2 parents: prior verify + phase branch tip); no other
merges. All ci blocks close with ---/ci--- (no malformed closes).

P1-1 (carried-forward from REVIEW.md): two AWS access key IDs in
.ciagent/VERIFY.md Phase 09 narrative — public identifiers, not secret
pairs, in the audit narrative not in executable code. Non-blocking;
recommended redaction for v1.2.

P1-D: ROADMAP.md line 81 says "audit pending" — now stale (this audit
closes it).

No critical issues. The milestone is shippable as-is. The v1.2.0 tag on
main HEAD is valid.
2026-07-21 19:48:33 +00:00

225 lines
16 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# ACDL v1.1 Milestone — Audit
**Auditor:** ci-audit-verifier (model: glm-5.2)
**Scope:** v1.1 milestone — Phases 0610 (tags v1.1.1..v1.1.5), milestone ship tag `v1.2.0`, diff `v1.1.0..HEAD` (48 commits)
**Date:** 2026-07-21
**Verdict:** **CLEAN** — 0 P0 (no critical issues, no feedback loop), 2 P1 post-hoc hygiene items, 0 P2.
---
## 1. Reconstruction test
**PASS.** The project state can be reconstructed from the git log `---ci---` blocks alone, and it matches the `.ciagent/` file contents.
### HEAD ci block (d6b1923)
The latest `---ci---` block on `main` HEAD (== `v1.2.0` tag target) reads:
```
project: acdl
phase: 0
milestone: v1.1
status: complete
requirements:
covered: [REQ-16..REQ-28]
```
This matches the prompt's expected block exactly: `status: complete`, `milestone: v1.1`, `requirements covered: [REQ-16..28]`. ✅
### Phase progression (walk-back through ci blocks)
Each phase (0610) shows the documented plan → plan-as-execute → shipped → verify progression with the correct phase number. The complete sequence reconstructed from `git log`:
| Phase | plan commit | plan-as-execute commits | ship commit (release.tag) | verify commit (verdict) |
|-------|--------------|--------------------------|----------------------------|--------------------------|
| 06 | b927f90 (`status: plan`) | e044a2d | ecb2c78 (`release.tag: v1.1.1`) + 4ab15cb (docs) | 0779a92 (`verdict: VERIFIED`) |
| 07 | b40aadd | 92d4535, f8e99ed, 6ed93f0, 68d90c0, 412e1ef | 8723206 (`release.tag: v1.1.2`) | 167a92f (`verdict: VERIFIED`) |
| 08 | a003168 | f8ddd8b, 1d5c4d2, d28630d, 727c873 (prep) | 067fef1 (`release.tag: v1.1.3`) + 96ab42f (docs) | 6d27dad (`verdict: VERIFIED`) |
| 09 | 327ba1d | e054a95, 3070a68, 3936bf46 | 5555796 (`release.tag: v1.1.4`) + 4c93147 (docs) | e71539d (`verdict: VERIFIED`) |
| 10 | cc4c27c (prep 798f430) | 8437a51, 622abe0, 7afaa34, e29319a | 35a336a (`release.tag: v1.1.5`) + d3aa960 (docs) | 4b87584 (`verdict: VERIFIED`) |
Then the milestone tail: 2ed2ca6 (`status: review`, `verdict: READY TO SHIP`) → d6b1923 (`status: complete`, `v1.2.0` tag). ✅
### Tags
`git tag --list` returns the expected set:
- `v1.0.1..v1.0.5` (v1.0 demo phase tags, preserved per D-rule)
- `v1.1.0` (pre-v1.1 demo — points at 58adf9e, the v1.0 Phase 05 traceability commit)
- `v1.1.1..v1.1.5` (phase patches 0610)
- `v1.2.0` (milestone ship tag — points at HEAD d6b1923, the complete commit)
All 12 tags present; no missing tags; no extra tags. ✅
### ROADMAP.md ↔ tags
The ROADMAP.md phase statuses match the tags exactly:
- Phase 06 → `complete (v1.1.1)`
- Phase 07 → `complete (v1.1.2)`
- Phase 08 → `complete (v1.1.3)`
- Phase 09 → `complete (v1.1.4)`
- Phase 10 → `complete (v1.1.5)`
The v1.1 milestone header (line 74) reads `## v1.1 (Complete — architecture finalization + v1 spike, 2026-07-21)` and line 80 says `Status: COMPLETE — all 5 phases shipped (v1.1.1..v1.1.5) + verified; review READY TO SHIP (0 P0); audit pending`. The "audit pending" clause is now stale (this audit closes it) — see P1-A below.
### REQUIREMENTS.md ↔ tags
The v1.1 traceability table (lines 117129) matches the phase tags:
| REQ | Phase | Status (file) | Tag (git) | Match |
|-----|-------|---------------|-----------|-------|
| REQ-16..22 | 07 | complete (v1.1.2) | v1.1.2 | ✅ |
| REQ-23 | 08 | complete (v1.1.3) | v1.1.3 | ✅ |
| REQ-24, 26 | 09 | complete (v1.1.4) | v1.1.4 | ✅ |
| REQ-25, 27, 28 | 10 | complete (v1.1.5) | v1.1.5 | ✅ |
The HEAD complete-commit ci block's `requirements.covered: [REQ-16..REQ-28]` matches REQUIREMENTS.md's 13 complete entries. ✅
### Reconstruction conclusion
Reconstructing the project state from git log `---ci---` blocks alone reproduces the `.ciagent/` file contents (PROJECT.md phase table, ROADMAP.md statuses, REQUIREMENTS.md traceability, REVIEW.md verdict). **No drift detected.**
---
## 2. .ciagent/ file discipline
**PASS with one P1 hygiene item.** All required files exist; the latest phase's PLAN/VERIFY are in place; no orphans; no stale v1.0 framing. One stale-path issue in PERSONAS.md.
### Required files (all present)
| File | Exists | Notes |
|------|--------|-------|
| `config.json` | ✅ | mode=single, active_project=acdl, milestone=v1.1 |
| `PROJECT.md` | ✅ | v1.1 objective (architecture finalization + v1 spike); D-034..D-046 + D-P08/P09/P10 present |
| `ARCHITECTURE.md` | ✅ | v1.1 target architecture; v1.1 spike scope; Gitea API surface with D-039 OIDC waiver |
| `REQUIREMENTS.md` | ✅ | REQ-16..28 complete; traceability table matches tags |
| `ROADMAP.md` | ✅ | v1.1 header marked Complete; phases 0610 statuses match tags |
| `PERSONAS.md` | ✅ | v1.1 roster; deactivated v1.0 stub-engineer; phase-specific overrides |
| `PLAN.md` | ✅ | Phase 10 (the last phase) — `phase: 10, name: v1-spike-l2-and-contract-e2e` |
| `RESEARCH.md` | ✅ | 8 research targets (OIDC blocker, runner tooling, IR prior art, Checkov adapter, outbox, confidence signal, audit ledger, HITL matrix) |
| `VERIFY.md` | ✅ | Phase 10 verification (the last one) — `Verdict: Phase 10: VERIFIED`, tag v1.1.5 |
| `REVIEW.md` | ✅ | new for the milestone review — `Verdict: READY TO SHIP`, 0 P0, 1 P1 carried-forward |
### No stale v1.0 framing in v1.1 files
- `PROJECT.md` correctly states the v1.1 objective (line 53: "Finalize the architecture to v1.0 ... and prove the locked commitments with one end-to-end v1 implementation spike"). **No** occurrence of "30-min stub demo" / "30 min" / "stub demo" as the current objective. The v1.0 demo is correctly archived under `demo/` (line 89). ✅
- The v1.0 demo is referenced as the *prior* milestone (status complete, tag v1.1.0) with a pointer to its archived location. ✅
### PLAN.md = Phase 10 (the last phase)
PLAN.md frontmatter: `phase: 10`, `name: v1-spike-l2-and-contract-e2e`, `requirements: [REQ-25, REQ-27, REQ-28]`. Not a stale Phase 0609 plan. ✅
### VERIFY.md = Phase 10 (the last verification)
VERIFY.md header: `# Phase 10 — v1-spike-l2-and-contract-e2e (v1.1) VERIFY`, `Verdict: Phase 10: VERIFIED`, `Tag: v1.1.5`. Not a stale Phase 0609 verification. ✅
### No orphan .ciagent/ files
`ls .ciagent/` shows exactly the 10 standard files (config.json + the 9 markdown files). No leftover/extra files. ✅
### P1-A (post-hoc hygiene, non-blocking)
**Two stale-path drift items inside `.ciagent/`:**
1. **`config.json` line 8:** `"status": "specify"` — the milestone is `complete` (shipped v1.2.0), but the project-status field still reads `specify`. Should be `"complete"` (or `shipped`). Cosmetic — the milestone field reads `v1.1` correctly, and ROADMAP.md carries the authoritative status.
2. **`PERSONAS.md` territory paths:** 6 references use the stale `platform/...` path prefix (lines 7, 38, 47, 56, 80, 109) instead of the renamed `acdl_platform/...`. The rename happened in Phase 08 prep commit 727c873 (`fix(P08 prep): rename platform/ -> acdl_platform/ (stdlib shadow fix)`). All executable code + the other `.ciagent/` files use `acdl_platform/`; PERSONAS.md was not updated. The territories listed (`platform/confidence_signal.py`, `platform/contract_resolver.py`, `platform/outbox/**`, `platform/registry/**`, `platform/hitl_matrix_design.md`, `platform/audit_ledger_design.md`, `platform/separation_of_duties.py`) should all read `acdl_platform/...`. Non-blocking — the verification toolchain (`PERSONAS.md` `verification_toolchain.typecheck` line 7 also has the stale `platform/**/*.py`) is overridden per-phase by each PLAN.md's explicit `verification.typecheck`, so the stale path does not break any verify script. **Recommended redaction for v1.2 cleanup.**
---
## 3. Branch hygiene
**PASS.** Clean branch topology, clean working tree.
### Branch list
`git branch -a` returns:
- `main`
- `milestone/v1.0-initial` (the v1.0 milestone branch, intentionally retained)
- `remotes/origin/main`
- `remotes/origin/milestone/v1.0-initial`
**No leftover `phase/NN-*` branches** (all 5 phase branches — `phase/06-archive-demo-and-reorient`, `phase/07-architecture-v1-finalization`, `phase/08-aws-bootstrap`, `phase/09-v1-spike-ir-and-l1-and-adapter`, `phase/10-v1-spike-l2-and-contract-e2e` — were deleted post-merge, confirmed by the ship commit messages referencing the squash-merge of the phase branch). ✅
### Working tree
`git status` on `main`: "nothing to commit, working tree clean". The branch is ahead of `origin/main` by 43 commits (the v1.1 milestone work has not been pushed to the remote yet — this is expected for an audit pass before the milestone is declared shipped; the push is the final ship step). No uncommitted changes; no stray artifacts (`.env.secrets`, `terraform/spike/.terraform/`, `terraform/spike/.terraform.lock.hcl`, `terraform/spike/tfplan`, `terraform/spike/*.tfstate*` are all gitignored per REVIEW.md Lens 3). ✅
### Branch hygiene conclusion
Clean. ✅
---
## 4. Commit discipline
**PASS with one P1 hygiene item.** Every v1.1-stage commit carries a `---ci---` block with the documented fields; the field-usage rules hold; the merges are the documented `--no-ff` squash-merge pattern.
### `---ci---` block presence
48 commits in `v1.1.0..HEAD`. Audit of ci-block presence:
- **3 commits with no `---ci---` block:** `52665b8 Add docs/architecture.md`, `7614c41 Add docs/vision.md`, `b84a8a2 Update docs/architecture.md`. All three are **pre-specify upstream-doc ingestion** commits: each is an ancestor of the specify commit `288607b` (`docs(specify): ingest docs/vision+architecture`). They are the raw upstream `docs/` files being added to the repo *before* the v1.1 CIAgent protocol was applied (the specify commit 288607b is the first v1.1-stage commit and the first to carry a v1.1 `---ci---` block). These three commits belong to the v1.0→v1.1 transition, not the v1.1 milestone proper. They are inside the `v1.1.0..HEAD` audit range only because `v1.1.0` is tagged at the v1.0 Phase 05 traceability commit (58adf9e) — a tag-placement choice that puts the v1.0-complete + audit-v1.0 + docs-ingestion commits inside the v1.1 range. **P1-B (post-hoc, non-blocking):** if the audit protocol requires every commit in the `v1.1.0..HEAD` range to carry a v1.1 ci block, these three pre-specify ingestion commits technically fail it. However: (a) they predate the v1.1 specify stage, (b) the v1.0 milestone-complete commit `80ac975` and the v1.0 audit `d700148` carry v1.0 ci blocks (correct for their milestone), and (c) the v1.0 contracts commit `30e63d6` carries a v1.0 ci block. Only the 3 raw `docs/` ingestion commits lack any ci block at all. Recommended for a future note in the run.md about tag placement (a v1.1.0 tag on the v1.0 *complete* commit rather than the v1.0 Phase 05 traceability commit would have excluded these from the v1.1 range). Non-blocking.
- **45 commits with `---ci---` blocks:** all carry `project: acdl`, `phase:` (0 for milestone-stage, 610 for phase-stage), `milestone: v1.1`, and `status:` from the documented set {specify, clarify, research, plan, plan-as-execute, shipped, verify, review, complete}. ✅
### Field usage rules
- **`release.tag`** appears only on the 5 ship commits (ecb2c78 v1.1.1, 8723206 v1.1.2, 067fef1 v1.1.3, 5555796 v1.1.4, 35a336a v1.1.5) — never on plan/plan-as-execute/verify/review/complete commits. ✅
- **`verdict`** appears only on the 5 verify commits (0779a92, 167a92f, 6d27dad, e71539d, 4b87584) and the 1 review commit (2ed2ca6) — never elsewhere. ✅
- **`requirements.covered`** appears on plan-as-execute commits (where a task covers a specific REQ) and on the complete commit (REQ-16..28). The complete commit uses the documented nested form (`requirements:\n covered: [...]`). ✅
- **No ad-hoc fields.** All fields used (`project`, `phase`, `milestone`, `status`, `release.tag`, `verdict`, `requirements.covered`, `persona`, `tasks`) are from the documented set. ✅
### Merge commits
`git log --merges v1.1.0..HEAD` returns exactly the 5 ship commits:
```
35a336a ship: phase-10 ... (v1.1.5) [parents: e71539d d3aa960]
5555796 ship: phase-09 ... (v1.1.4) [parents: 327ba1d 4c93147]
067fef1 ship: phase-08 ... (v1.1.3) [parents: 167a92f 96ab42f]
8723206 ship: phase-07 ... (v1.1.2) [parents: b40aadd 412e1ef]
ecb2c78 ship: phase-06 ... (v1.1.1) [parents: b927f90 4ab15cb]
```
Each ship commit has two parents: (1) the prior `verify` commit on `main`, and (2) the phase branch's final `docs(PNN): post-ship traceability` commit. This is the documented `--no-ff` squash-merge pattern (the phase branch is merged into main as a merge commit, not a fast-forward). **No** other merge commits exist in the range — no surprise merges, no `--ff-only` regressions. ✅
### Closing-tag note
All 45 ci-block commits close the block with `---/ci---` (the documented closing tag). **No** commit uses the malformed `---ci---` close. ✅
---
## Critical issues
**No critical issues (0 P0).** The audit found no blocking problems:
- Reconstruction test passes — git log reproduces the `.ciagent/` state with no drift.
- File discipline passes — all 10 files present, latest-phase PLAN/VERIFY in place, no orphans, no stale v1.0 framing.
- Branch hygiene passes — clean topology, no leftover phase branches, clean working tree.
- Commit discipline passes — every v1.1-stage commit carries a well-formed `---ci---` block; field rules hold; merges are the documented pattern.
**No feedback loop is triggered.** The milestone does not need to return to EXECUTE.
---
## Post-hoc hygiene (P1s for v1.2 cleanup)
| ID | Item | Severity | File / location | Fix |
|----|------|----------|-----------------|-----|
| **P1-1** (carried-forward from REVIEW.md) | Two AWS access key IDs (`AKIAYOZHMKZ7RK26N66W` rotated spike key, `AKIAYOZHMKZ772SINHFX` deactivated root key) appear in `.ciagent/VERIFY.md` Phase 09 narrative. **Public identifiers, not secret pairs.** They live in the `.ciagent/` audit narrative, not in any executable code path. | P1 (non-blocking) | `.ciagent/VERIFY.md` Phase 09 narrative | Replace with placeholders `AKIA…SPIKE` / `AKIA…ROOT-DEACTIVATED` in a v1.2 redaction pass. |
| **P1-A** (audit-new) | `config.json` line 8 `"status": "specify"` is stale — the milestone is `complete` (v1.2.0 shipped). | P1 (non-blocking) | `.ciagent/config.json:8` | Update to `"status": "complete"` (or `"shipped"`) in v1.2 cleanup. |
| **P1-B** (audit-new) | `PERSONAS.md` territory paths (lines 7, 38, 47, 56, 80, 109) reference the stale `platform/...` prefix instead of the renamed `acdl_platform/...`. The rename happened in Phase 08 prep (commit 727c873). The verification toolchain line 7 also has the stale `platform/**/*.py` glob. Non-blocking: each PLAN.md overrides the toolchain per-phase, and territories are descriptive (enforcement mode = `warn`). | P1 (non-blocking) | `.ciagent/PERSONAS.md` lines 7, 38, 47, 56, 80, 109 | Replace `platform/` with `acdl_platform/` in v1.2 cleanup. |
| **P1-C** (audit-new, observation) | 3 pre-specify upstream-doc ingestion commits (`52665b8 Add docs/architecture.md`, `7614c41 Add docs/vision.md`, `b84a8a2 Update docs/architecture.md`) carry no `---ci---` block. They predate the v1.1 specify stage (each is an ancestor of the specify commit 288607b). They fall inside the `v1.1.0..HEAD` audit range only because the `v1.1.0` tag is placed at the v1.0 Phase 05 traceability commit (58adf9e) rather than the v1.0 complete commit (80ac975). | P1 (non-blocking, process note) | tag placement + run.md | Document in run.md that the milestone-complete tag should be placed on the milestone-complete commit to exclude the transition-window commits from the next milestone's audit range. No file change needed for v1.1; v1.2 should pick the tag placement deliberately. |
| **P1-D** (audit-new, cosmetic) | `ROADMAP.md` line 81 says `audit pending` — now stale (this audit closes it). | P1 (non-blocking, cosmetic) | `.ciagent/ROADMAP.md:81` | Update to `audit CLEAN` (or remove the clause) in v1.2 cleanup. |
---
## Final verdict
**v1.1 milestone audit: CLEAN**
- 0 P0 (no critical issues, no feedback loop).
- 5 P1 post-hoc hygiene items (1 carried-forward from REVIEW.md + 4 audit-new), all non-blocking, all flagged for v1.2 cleanup.
- The milestone is shippable as-is. The `v1.2.0` tag on `main` HEAD is valid.