REQ-215: RACI matrix in PROJECT.md (§ RACI Matrix) + docs/raci.md (citizen-dev-facing copy). 3 roles (Citizen Developer / Platform / Release Management co-owned). 7 work categories × R/A/C/I. Compliance-standard equivalence note: any upstream source (AI agent, SDLC, dev platform) is subject to the same gate. REQ-216: PDLC-upstream scope in PROJECT.md (§ Scope) + docs/scope.md. Promotes Core Tenet #2 + Anti-Goal #1 from buried tenets to a dedicated, unmissable scope statement. REQ-228: 2 new deck slides (17 Scope + 18 RACI) → 20 slides. Arc preview updated. Talking points synced. HTML + PPTX re-rendered (21 PPTX slides). ---ci--- project: acdl phase: 2 milestone: v1.18 status: execute requirements: covered: [REQ-215, REQ-216, REQ-228] partial: [] ---/ci---
68 lines
2.7 KiB
Markdown
68 lines
2.7 KiB
Markdown
# Scope — Nova is Downstream of PDLC
|
|
|
|
> **Source of truth:** `.ciagent/PROJECT.md` § Scope (v1.18, REQ-216).
|
|
> This page is the citizen-developer-facing copy.
|
|
|
|
## The Boundary
|
|
|
|
The **Product Development Lifecycle (PDLC)** is **upstream** of Nova. The
|
|
PDLC includes:
|
|
|
|
- Product backlog / roadmap planning
|
|
- Code authorship (via AI coding agent, IDE, or agentic SDLC platform)
|
|
- Sprint planning / issue tracking
|
|
- Application business logic
|
|
- IDE workflows / developer experience
|
|
|
|
Nova never penetrates the PDLC. Nova's domain is **infrastructure +
|
|
delivery only**.
|
|
|
|
## What Nova Does
|
|
|
|
Nova governs the downstream half:
|
|
|
|
- **Contract ingestion** — the validated entry point
|
|
- **Submission-readiness gate** — what is acceptable to start
|
|
(`schemas/submission-readiness.schema.json`)
|
|
- **Policy enforcement** — the confidence signal, Checkov, tagging
|
|
- **Cloud resource lifecycle** — Terraform plan/apply, state, IAM
|
|
- **Environment progression** — dev (autonomous) → qa (QA attestation) →
|
|
prod (SRE attestation) → dr (SRE attestation)
|
|
- **Immutable audit + attestation** — the Decision Ledger, the evidence
|
|
stream, the HITL gates
|
|
|
|
## The Integration Point
|
|
|
|
Integration between the PDLC and Nova is **only** through the validated,
|
|
published contract boundary:
|
|
|
|
```
|
|
PDLC (upstream) Nova (downstream)
|
|
───────────────── ─────────────────
|
|
product backlog contract ingestion
|
|
code authorship (AI agent / IDE / SDLC) → submission-readiness gate
|
|
sprint planning → policy enforcement
|
|
application business logic → cloud resource lifecycle
|
|
→ environment progression (dev→qa→prod→dr)
|
|
→ immutable audit + attestation
|
|
```
|
|
|
|
The citizen developer's AI coding agent, an upstream agentic SDLC
|
|
platform, or any upstream development platform may all produce
|
|
submissions. **The source does not matter** — all are subject to the
|
|
same compliance standards. Nova validates the submission, not the
|
|
author.
|
|
|
|
## What Nova is Not
|
|
|
|
- Not an upstream development platform (no product backlogs, IDE, code
|
|
authorship).
|
|
- Not a general-purpose AI agent platform (autonomy is narrow, bounded
|
|
by policy envelopes).
|
|
- Not a legacy infrastructure bridge (no VMs/bare metal/OS).
|
|
- Not a permissive delivery highway (no escape hatches past confidence
|
|
or HITL).
|
|
- Not a mutable audit log (VCS history ≠ regulatory evidence).
|
|
|
|
These anti-goals (from `docs/vision.md` §7 and Core Tenet #2) are
|
|
promoted here from buried tenets to an unmissable scope statement. |