Merge milestone/v1.14-refinement — v1.14 complete (NFR Refinement: bug fixes, security, stubs, tests, docs; 20 phases + final; tag v1.13.24)
v1.14 NFR Refinement milestone complete. 20 execution phases (P1-P20) +
1 final (P21). All P1/P2 backlog from v1.11 review resolved. Security
posture hardened (swallowed errors, account ID externalized, IAM scoped,
schema validation, credential hygiene). Stubs resolved (kyverno --kube-
version removed). 7 untested scripts gained coverage. Documentation
synced (ARCHITECTURE v1.11-v1.14 addenda, stale @v1.6-1.9 -> @v1.13,
GRILL G-005/G-008 resolved, COST.md window extended, D-083 deferral
recorded). Platform VPC parameterized.

561 tests pass (was 528 at v1.13.2; +33). 22/22 capabilities Verified.
6 grill binding decisions (G-101..G-106) applied. 1 escalation (E-001)
auto-resolved at full autonomy (D-101).

---ci---
project: acdl
phase: 21
milestone: v1.14
status: complete
---/ci---
2026-07-29 21:36:37 +00:00

313 lines
23 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# CIAgent Grill Report
## Run: 2026-07-27 19:30 (mode: interactive, focus: all)
### Verdict: Proceed with conditions (confidence: 0.72)
Two escalations must be resolved before the leadership pitch:
- **G-005 (risks):** 6 cloud capabilities (CAP-017..022) are deploy-unverified.
**RESOLVED (v1.11):** CAP-017..022 are now Verified live-aws via the
modules-lifecycle pipeline (apply/modify/destroy exit 0). The IAM-drift
framing is removed. See CAPABILITY_INVENTORY.md.
- **G-008 (budget):** No cost documentation exists despite live AWS resources.
**RESOLVED (v1.11):** COST.md now exists, documenting the v1.0→v1.10 spend
window + the v1.11 cost projection. The v1.14 P19 phase extends the
window to v1.11v1.14.
The project is reclassified as an **OSS reference implementation** (G-003),
not a sponsored product. The grill's sponsor/ROI/budget/timeline axes apply
in weakened form; the adoption, architecture, and risks axes apply in full.
### Axis 1 — Business Case
- **Q1**: What problem does this actually solve, and is that problem still the top priority?
- Evidence: PROJECT.md:3-21 (vision + North Star); G-003 reframing (OSS reference)
- Answer: ACDL is an OSS reference implementation showing the shape of an agentic cloud delivery platform. The problem (cognitive load of infra + operational work of safe change) is documented in docs/vision.md.
- Confidence: 0.85
- Decision: G-003 — reframe as OSS reference implementation; no sponsor/ROI required.
- **Q2**: Who is the named executive sponsor, and when did they last make a decision under pressure?
- Evidence: MISSING (no named sponsor in any .ciagent/ file)
- Answer: Not applicable for an OSS reference implementation (G-003). Senior leadership requesting the pitch is interest, not sponsorship.
- Confidence: 0.85
- Decision: G-003 (carries forward).
- **Q3**: What happens to the business if the project is cancelled?
- Evidence: PROJECT.md:487 ("0 consumer adoption"); 10 milestones shipped with no consumers
- Answer: If cancelled, no consumer loses a deployed system. The reference value (clonable shape) persists in the repo. Cancellation cost is low — consistent with OSS reference framing.
- Confidence: 0.80
- Decision: G-003 (carries forward).
- **Q4**: Is the ROI calculated against a counterfactual?
- Evidence: MISSING (no ROI calculation anywhere)
- Answer: Not applicable for an OSS reference implementation. The bar is "is it a credible, demonstrable reference?" not "is there a paying customer?"
- Confidence: 0.85
- Decision: G-003 (carries forward).
### Axis 2 — Scope and Requirements
- **Q1**: Is the scope expanding, contracting, or genuinely stable?
- Evidence: ROADMAP.md (v1.0→v1.10, 55 phases); v1.7 added uptime-kuma + decommission + RDS; v1.9.x added decks; v1.10 added regression-class VERIFY + local emulators
- Answer: Expanding. The Out-of-Scope table (REQUIREMENTS.md:61-72) is scoped to v1.1 only; later milestones added scope without boundary updates.
- Confidence: 0.70
- Decision: G-010 — OSS scope is contributor-bounded; no out-of-scope table needed.
- **Q2**: Who owns the requirements, and have they been frozen?
- Evidence: REQUIREMENTS.md (115 REQs, REQ-01..REQ-115); config.json autonomy=full
- Answer: The user owns requirements via CLARIFY auto-resolution under full autonomy. Not frozen — each milestone adds REQs.
- Confidence: 0.70
- Decision: G-010 (carries forward).
- **Q3**: What is explicitly out of scope?
- Evidence: REQUIREMENTS.md:61-72 (v1.1 Out-of-Scope table only); PROJECT.md:42-51 (Domain Boundaries)
- Answer: Domain Boundaries section (PROJECT.md:42-51) defines durable out-of-scope: application business logic, IDE workflows, product backlog, node/OS-level compute. No per-milestone out-of-scope updates since v1.1.
- Confidence: 0.65
- Decision: G-010 — contributor-bounded scope accepted for OSS reference.
- **Q4**: Are there hidden requirements only disclosed late in delivery?
- Evidence: v1.10 milestone (decay disclosure, PROJECT.md:59-67) — 7 adapter defects undisclosed across 8 phases
- Answer: Yes — the v1.10 decay incident is a late-disclosed hidden requirement (reproducibility). D-091 regression gate is the mitigation.
- Confidence: 0.72
- Decision: G-007 (carries forward — milestone-level regression gate catches late-disclosed decay).
### Axis 3 — Architecture and Technical Feasibility
- **Q1**: Has the proposed architecture been validated by the people who will build and operate it?
- Evidence: PERSONAS.md (agent personas only); ARCHITECTURE.md (29KB); no human reviewer sign-off
- Answer: Validated by the agent that built it, not by a downstream platform team. Acceptable for an OSS reference (G-002 — Platform Team joins post-clone).
- Confidence: 0.72
- Decision: G-002 (carries forward).
- **Q2**: What is the integration surface?
- Evidence: ARCHITECTURE.md; adapters/ (terraform, wiz, kyverno, local emulators); contracts/ schema
- Answer: Contract schema (upstream) + engine adapters (downstream). Integration is bounded by the IR + PolicyCheckResult schemas.
- Confidence: 0.78
- Decision: (resolved by existing architecture; no new binding decision)
- **Q3**: Is there an existing system being replaced?
- Evidence: PROJECT.md:7-8 (vision: absorb cognitive load + operational work)
- Answer: ACDL replaces manual platform engineering + ticket-driven delivery. No existing system in this repo; downstream teams replace their own.
- Confidence: 0.75
- Decision: (resolved by G-002 white-label framing)
- **Q4**: What is the technical debt being inherited, and is it budgeted for?
- Evidence: v1.10 decay (7 adapter defects); D-091 regression gate at milestone completion (not per-phase)
- Answer: Diff-scoped VERIFY debt was paid down in v1.10. Per-phase regression gap is accepted debt (G-007).
- Confidence: 0.70
- Decision: G-007 — milestone-level regression gate is correct; inter-milestone decay is an accepted trade-off.
### Axis 4 — People, Skills, and Organization
- **Q1**: Which 2-3 people, if they left, would the project fail?
- Evidence: PERSONAS.md (agent personas); all binding decisions made by the user (D-034, D-090, G-001..G-012)
- Answer: One person — the user. Bus factor is 1.
- Confidence: 0.82
- Decision: G-011 — single-maintainer is normal for OSS reference; no action.
- **Q2**: Are the assigned resources actually allocated at the percentages claimed?
- Evidence: config.json (autonomy=full, max_concurrent_agents=5)
- Answer: The agent is the resource; allocation is 100% when invoked, 0% otherwise. No BAU fire-fighting claim to verify.
- Confidence: 0.78
- Decision: G-011 (carries forward).
- **Q3**: Is there a product owner with actual authority to prioritize?
- Evidence: config.json (autonomy=full, decision_confidence_threshold=0.6)
- Answer: The user is the product owner with absolute authority (full autonomy within user-locked constraints).
- Confidence: 0.80
- Decision: G-011 (carries forward).
- **Q4**: Is the team building capability they don't have?
- Evidence: RESEARCH.md (101KB); local emulating adapters (Phase 53) — capability was built and proven
- Answer: No — the agent built and verified the capability. Not a prototype-hoping-to-learn scenario.
- Confidence: 0.78
- Decision: (resolved by existing evidence)
### Axis 5 — Timeline and Estimates
- **Q1**: Was the deadline set before or after the scope was understood?
- Evidence: ROADMAP.md (v1.0 07-21 → v1.10 07-27, 6 days); no deadline documented anywhere
- Answer: No deadline. Milestones complete when the agent finishes committing.
- Confidence: 0.78
- Decision: G-006 — autonomous OSS build has no deadline; cadence is fine.
- **Q2**: What is the project's critical path?
- Evidence: MISSING (no critical path analysis)
- Answer: Not applicable — no deadline means no critical path to push.
- Confidence: 0.75
- Decision: G-006 (carries forward).
- **Q3**: Are the estimates evidence-based?
- Evidence: MISSING (no estimates; phases complete in agent-time)
- Answer: No estimates. The cadence is a function of agent speed, not engineering sizing.
- Confidence: 0.72
- Decision: G-006 (carries forward — acceptable for autonomous OSS reference).
- **Q4**: Is there a working definition of done?
- Evidence: VERIFY.md; AUDIT.md; 4-layer verify gate (structural, behavioral, security, quality)
- Answer: Yes — the 4-layer verify gate + regression gate (D-091) is the definition of done. "Done" is not "whatever the latest demo shows"; it is a gated, audited state.
- Confidence: 0.80
- Decision: (resolved by existing verify gate)
### Axis 6 — Budget and Financial Realism
- **Q1**: What percentage of the budget is already spent vs. remaining?
- Evidence: MISSING (no budget file in .ciagent/)
- Answer: Unresolved — no budget documented.
- Confidence: 0.50
- Decision: G-008 — ESCALATION.
- **Q2**: Are there predictable cost drivers not in the original budget?
- Evidence: config.json escalation_hooks (deploy, delete_data); CAP-013..016 verified against live AWS account 581513795199
- Answer: Yes — live AWS resources exist (S3 state, DynamoDB outbox, ECS, CloudFront). No cost driver documentation.
- Confidence: 0.60
- Decision: G-008 (carries forward — escalation).
- **Q3**: What's the burn rate, and how long until the money runs out?
- Evidence: MISSING
- Answer: Unresolved.
- Confidence: 0.40
- Decision: G-008 (carries forward — escalation).
- **Q4**: Is the budget contingent on something that hasn't happened yet?
- Evidence: MISSING
- Answer: Unresolved — likely contingent on the leadership pitch yielding a pilot platform team (G-001).
- Confidence: 0.55
- Decision: G-008 (carries forward — escalation).
### Axis 7 — Risks, Assumptions, and Dependencies
- **Q1**: What are the top 3 assumptions the plan rests on?
- Evidence: PROJECT.md:79-88 (CAP-017..022 IAM-gated); D-039 (OIDC federation deferred, blocked on go-gitea/gitea#36988); D-090 (no cap on re-verification sweep)
- Answer: (1) Terraform plan path proves deployability. (2) Local emulators prove runtime behavior. (3) Gitea OIDC will eventually merge.
- Confidence: 0.72
- Decision: (resolved by G-005 escalation)
- **Q2**: What are you dependent on outside the team?
- Evidence: PROJECT.md:79-88 (admin principal needed for IAM re-bootstrap); go-gitea/gitea#36988 (OIDC blocker)
- Answer: An admin AWS principal (for CAP-017..022) and the Gitea OIDC PR (for D-039 waiver closure).
- Confidence: 0.78
- Decision: G-005 (carries forward — escalation).
- **Q3**: What is the single risk that, if it materializes, kills the project?
- Evidence: CAPABILITY_INVENTORY.md §"Cloud capabilities NOT re-verified" (6 of 22 capabilities, 27%)
- Answer: The unverifiable deploy path for CAP-017..022. If the terraform plan path does not translate to a real deploy, 27% of advertised capability is fictional.
- Confidence: 0.80
- Decision: G-005 — ESCALATION.
- **Q4**: Have you done a pre-mortem?
- Evidence: MISSING (no pre-mortem document)
- Answer: No pre-mortem on file. The v1.10 decay incident is the closest thing to a post-mortem.
- Confidence: 0.65
- Decision: (flagged; no binding decision — user accepted autonomous governance in G-009)
### Axis 8 — Governance, Decision-Making, and Communication
- **Q1**: Who is the decision-maker when two executives disagree?
- Evidence: config.json (autonomy=full); no human governance body documented
- Answer: The user is the single decision-maker. No executive disagreement is possible because there is no executive body.
- Confidence: 0.78
- Decision: G-009 — autonomous CI is the governance.
- **Q2**: How often does governance meet, and what's the escalation pattern?
- Evidence: config.json (escalation_hooks: deploy, delete_data, merge_to_main; escalation_timeout_ms: 300000)
- Answer: Governance is event-driven (escalation hooks), not cadence-driven. 5-minute timeout.
- Confidence: 0.72
- Decision: G-009 (carries forward).
- **Q3**: What is being omitted from the status reports?
- Evidence: v1.10 decay disclosure (PROJECT.md:59-67) — 8 phases omitted the decay from status
- Answer: The v1.10 incident is direct evidence that status reports (decks) omitted material decay. D-094 (rewrite to verified reality) is the correction.
- Confidence: 0.75
- Decision: (resolved by D-094 + G-007 regression gate)
- **Q4**: Is there a "stop the project" trigger?
- Evidence: MISSING (no stop-trigger documented)
- Answer: No formal stop-trigger. The user is the single point of cancellation authority.
- Confidence: 0.68
- Decision: G-009 — autonomous CI is the governance; no human stop-trigger needed.
### Axis 9 — Change, Adoption, and Operational Readiness
- **Q1**: Who will use this, and what is in it for them?
- Evidence: PROJECT.md:487 ("0 consumer adoption"); G-001 (MVP for leadership pitch + pilot consumers)
- Answer: Pilot platform teams (post-pitch) will clone, customize, and deploy for their internal consumers. The value to them is a working reference shape.
- Confidence: 0.65
- Decision: G-001 — feature-complete MVP for pitch + pilot consumers in parallel.
- **Q2**: Is the operations/support team involved now or being handed a finished product?
- Evidence: MISSING (no Platform Team involvement in 55 phases); G-002 (white-label, out-of-repo)
- Answer: Intentionally out-of-scope — ACDL is white-label; Platform Team customization happens outside this repo.
- Confidence: 0.78
- Decision: G-002 — white-label; Platform Team customization is out-of-repo.
- **Q3**: What is the rollback plan if it goes wrong?
- Evidence: D-070 (decommission mode, 2-step pipeline with HITL SRE gates)
- Answer: Decommission mode exists for deployed stacks. For the reference repo itself, rollback = git revert (no production state to roll back).
- Confidence: 0.75
- Decision: (resolved by existing D-070 decommission mode)
- **Q4**: Has anyone validated the success criteria with the people who will judge success?
- Evidence: PROJECT.md (leadership pitch requested); no documented success-criteria validation with leadership
- Answer: The leadership pitch IS the validation moment. Success criteria for an OSS reference = "leadership says this is a credible shape."
- Confidence: 0.68
- Decision: G-001 (carries forward — pitch is the validation).
### Meta — Closing Review
- **Q1**: If you were the auditor, what would you flag?
- Evidence: This grill run
- Answer: (1) 6 unverifiable cloud capabilities (G-005). (2) No cost documentation (G-008). (3) Vision doc vs. OSS-reference framing tension (G-004 — resolved by keeping vision as target-state description).
- Confidence: 0.78
- Decision: (aggregated; G-005 + G-008 are the actionable flags)
- **Q2**: What is the project not doing that it should?
- Evidence: MISSING (no pre-mortem, no cost doc, no Platform Team engagement, no stop-trigger)
- Answer: Documenting the operating model (cost, deploy verification, governance) for a downstream team. The grill surfaced this across G-005, G-008, G-009.
- Confidence: 0.75
- Decision: (aggregated; G-005 + G-008 are the actionable items)
- **Q3**: What is the simplest possible version that could deliver 80% of the value?
- Evidence: ROADMAP.md (v1.1 spike, Phase 10, REQ-27 — core E2E proven); v1.2-v1.10 (45 phases of expansion)
- Answer: The v1.1 spike (contract → IR → terraform plan → Checkov → confidence → outbox) is the 80%-value version. The full 115-requirement build is accepted as the reference value (G-012).
- Confidence: 0.68
- Decision: G-012 — full catalog is the value; no minimal release needed.
- **Q4**: What would have to be true for this to succeed in the next 90 days, and is it true today?
- Evidence: G-001 (pitch + pilot); G-005 (IAM re-bootstrap); G-008 (cost doc)
- Answer: (1) Leadership pitch yields a pilot platform team — NOT TRUE today (pitch not yet delivered). (2) CAP-017..022 deploy path is verifiable — NOT TRUE today (G-005 escalation). (3) Cost operating model is documented — NOT TRUE today (G-008 escalation).
- Confidence: 0.72
- Decision: (aggregated; G-005 + G-008 + G-001 pitch are the 90-day conditions)
### Binding Decisions
| ID | Axis | Decision | Confidence |
|----|------|----------|-----------|
| G-001 | adoption | Feature-complete MVP for leadership pitch + pilot consumers in parallel; CIAgent builds, Platform Team deploys | 0.65 |
| G-002 | adoption | ACDL is white-label; Platform Team customization is out-of-repo; resolves ops-handoff concern | 0.78 |
| G-003 | business | Reframe as OSS reference implementation; no sponsor/ROI required | 0.85 |
| G-004 | business | Keep production-deployment vision; reference describes target state | 0.75 |
| G-005 | risks | ESCALATION — re-bootstrap IAM or mark CAP-017..022 deploy-unverified in decks | 0.80 |
| G-006 | timeline | Autonomous OSS build has no deadline; cadence acceptable | 0.72 |
| G-007 | architecture | Milestone-level regression gate is correct; system worked as designed | 0.70 |
| G-008 | budget | ESCALATION — add COST.md or document zero-cloud-cost operating model | 0.74 |
| G-009 | governance | Autonomous CI is the governance; no human stop-trigger needed | 0.68 |
| G-010 | scope | OSS scope is contributor-bounded; no out-of-scope table needed | 0.65 |
| G-011 | people | Single-maintainer is normal for OSS reference; no action | 0.70 |
| G-012 | meta | Full catalog is the value; no minimal release needed | 0.68 |
### Escalations
- **[G-005] risks** — 6 cloud capabilities (CAP-017..022: DynamoDB contracts table, Lambda contract-ingestor, ECS service live, CloudFront production stack, uptime-kuma, OIDC role) are deploy-unverified. The `acdl-spike-runner` IAM user cannot fix its own IAM (chicken-and-egg). Either re-bootstrap IAM with an admin principal to re-verify, or explicitly mark these 6 as "design-verified, deploy-unverified" in every leadership deck before the pitch. Resolves: project-killing risk (Axis 7 Q3).
- **[G-008] budget** — No cost documentation exists in `.ciagent/` despite live AWS resources (account 581513795199, CAP-013..016 verified). Either add a `COST.md` documenting monthly AWS spend, or explicitly document that ACDL runs at zero cloud cost (local emulators are the primary tier; live-AWS is a one-off spike per milestone). Resolves: financial-control gap (Axis 6 Q1-Q4).
---
## Run: 2026-07-29 20:25 (mode: adversarial, focus: v1.14 NFR plan)
### Verdict: FEASIBLE WITH BINDING DECISIONS (confidence: 0.72)
The v1.14 milestone is a sound, well-evidenced NFR sweep with a genuine,
traceable backlog. Not fundamentally infeasible. Four binding decisions
close plan defects + unverified assumptions that would otherwise re-expose
the v1.11 4-VPC failure mode. One escalation (E-001) auto-resolved at full
autonomy with assumption logging.
### 9-Axis scores
| Axis | Confidence | Forcing question (short) |
|------|-----------|---------------------------|
| 1 Business | 0.80 | Real backlog (5 P1 + 4 P2 + 6 swallowed errors + 15+ hardcoded IDs); cancellation survivable but inherits decay risk |
| 2 Scope | 0.70 | User-directed + frozen; P13 has a hidden feature door (implement vs remove); P2 conditional-child edges past wiring |
| 3 Architecture | 0.62 | P8 grep unsatisfiable for backend blocks; P8 state-bucket continuity unguarded; P9 IAM naming unverified; P4/P8 file overlap |
| 4 People | 0.85 | Agentic single-operator; runtime availability is the key-person risk |
| 5 Timeline | 0.68 | No deadline; 20-phase unverified span is the longest since G-007; P8 is the latent multi-phase-rework risk |
| 6 Budget | 0.85 | NFR-only, no new AWS resources; P8 re-creation is a one-shot accident not structural cost |
| 7 Risks | 0.60 | A1 (acdl-* naming unverified), A2 (fallback constant unbound), A3 (P4 gate hardening); kill-risk = P8 orphans state |
| 8 Governance | 0.72 | Full autonomy; no mid-milestone stop trigger; per-phase "green" ≠ "capabilities Verified" |
| 9 Adoption | 0.70 | No external users; rollback is git-level for code, AWS-state rollback unaddressed if P8 misfires pre-detection |
### Binding Decisions
| ID | Axis | Decision | Confidence |
|----|------|----------|-----------|
| G-101 | architecture | P8 grep scope amended to exclude terraform `backend "s3"` blocks (bucket arg is static-config-only, evaluated pre-init; cannot reference `data.aws_caller_identity`). Resource ARNs in policy/code ARE externalized; backend blocks stay literal or move to `-backend-config` (separate change). | 0.80 |
| G-102 | risks | P8 must bind `ACDL_AWS_ACCOUNT_ID` fallback to the live account ID (not a placeholder) AND the lifecycle workflow (full-mode jobs) must set `ACDL_AWS_ACCOUNT_ID` from `aws sts get-caller-identity` before any lifecycle invocation. No full-mode run proceeds with the env unset. | 0.78 |
| G-103 | scope | P13 must take the removal+documentation path (remove `--kube-version` + document deferral to GitOps reconciler roadmap), NOT the implementation path. Implementing version-aware policy selection is a new feature, violating D-095. | 0.85 |
| G-104 | architecture | P9 must verify (grep/audit of `modules/l1/*/terraform/main.tf` + `modules/l2/*/composition.json`) that every IAM role + KMS key created by the lifecycle pipeline matches `acdl-*` prefix before merge. CloudFront + WAFv2 (CloudFront scope) remain `Resource: "*"` with a documented global-ARN constraint. | 0.70 |
| G-105 | governance | P4's regression-gate hardening must be validated by running the full regression gate immediately after P4 lands (not deferred to P21). Gate must pass clean post-P4 before W2 begins. | 0.70 |
| G-106 | governance | A mid-milestone regression-gate checkpoint is added after W2 (P12), before W3 begins. Gate runs offline (D-091); a non-Verified result halts W3 until fixed. Not a re-litigation of G-007 (per-phase stays deferred) — a single checkpoint at the natural seam after the security wave. | 0.65 |
### Escalations
- **[E-001] risks** — P8 state-bucket continuity re-exposes the v1.11 4-VPC
root cause. G-102 proposes a binding mitigation (bind fallback + wire env
into workflow), but the residual risk (a future full-mode lifecycle run
with a misconfigured env orphans live state and re-creates resources)
cannot be reduced below 0.20 by plan-level decisions alone. **Auto-
resolved at full autonomy (D-101):** accept the residual risk; G-102's
binding mitigation (fallback bound to live account ID + workflow env
wiring) is the control. The lifecycle pipeline defaults to plan-only
(REQ-134) — full-mode runs are workflow_dispatch only, reducing the
accident surface. If the user prefers zero residual risk, direct that
P8 exclude the state-bucket name from externalization entirely
(externalize only resource ARNs, leave the backend `bucket` literal).
Confidence 0.55; auto-resolved per `config.autonomy.level=full`.