Jon Chery 38eaec9337 docs(P01): create 3-wave phase plan (REQ-01/09/10)
---ci---
phase: 1
milestone: v1.0
status: plan
plan:
  waves: 3
  wave_1_coordination: [T-1.1 gitignore+layout+README, T-1.2 verify_phase01.sh]
  wave_2_backend: [T-2.1 gitea_setup.sh, T-2.2 pipeline.yml skeleton, T-2.3 issue-to-contract.yml skeleton]
  wave_3_coordination: [T-3.1 wire verify + traceability update]
  requirements_covered: [REQ-01, REQ-09, REQ-10]
  must_haves: 6
  verification:
    typecheck: bash -n scripts/*.sh
    test: scripts/verify_phase01.sh
    build: no-op
---/ci---

PLAN.md defines 3 vertical-slice waves: coordination (skeleton + verify
script), backend (Gitea setup + workflow skeletons), coordination (wiring +
traceability). infra-stub-engineer and frontend-engineer have 0 tasks this
phase. Branch for EXECUTE will be phase/01-repo-scaffolding.
2026-07-21 12:59:27 +00:00
S
Description
Nova — The New Dawn of DevSecOps. Autonomous infrastructure delivery: consumers declare intent, the platform ships safely with an immutable audit trail.
69 MiB
Languages
Python 87.2%
Shell 8.6%
HCL 4.2%