• acdl-ci / Lint (push) Successful in 14s
    acdl-ci / Test (push) Failing after 29s
    acdl-ci / Platform check-only (offline) (push) Successful in 26s
    Stable

    cloudinit-bot released this 2026-08-04 20:09:15 +00:00 | 293 commits to main since this release

    v1.17 Milestone Complete

    Three pillars:

    (A) Strategic Direction

    • NORTH_STAR.md authored (Vision, 4 Objectives, 5 Anti-Goals, Non-Goals, 12-18mo Targets with grounding, Success Criteria)
    • Attestation clarification: human at stage gates (QA for production, SRE for operational readiness); autonomy in operations, not in accountability
    • Wired into CIAgent context-loading (config.json strategic_direction_file) for all future /ci-run
    • NORTH_STAR diff-check CI script (REQ-204)

    (B) Leadership Metrics + PowerBI

    • CloudEvents 1.0 envelope + JSONL event log + SQLite cold store (Nova-native, D-120)
    • Decision Ledger: outbox_writer.py extended → SQLite append-only hash-chain (D-121, D-083 honored)
    • Infracost pre-apply cost estimates (offline, D-120)
    • Attestation event instrumentation (D-132)
    • Confidence-gate decision events (D-122: AI = confidence-gated policy engine, not LLM)
    • Policy event emission (checkov_adapter)
    • PowerBI export: CSV/JSON views + 8 placeholder views for deferred metrics (D-129)
    • Metrics catalog: docs/METRICS.md + 13 per-KPI definition-of-success docs (D-127)
    • Trust snapshot report (5 trust metrics + chain-integrity verdict)
    • Deferred-metrics activation roadmap + hot-path plan
    • No-humans thesis defensibility brief

    (C) Unified Narrative Deck

    • Merged two decks into one: 'Nova — The No-Humans Infrastructure Platform'
    • 5-act arc: Problem → Vision → How → Proof → Roadmap
    • x3 structure at deck + slide level (tell them what you're going to tell them → tell them → tell them what you told them)
    • Per-slide benefit callouts + fluid transitions
    • Both old decks retired (D-130)

    Hard constraint honored: DO NOT make anything up. Every metric is grounded (cites source file), derived (documented formula), or deferred (cites blocking decision ID). No fabricated numbers.

    Interactive GRILL: 12 binding decisions applied, 2 escalations resolved (E-003: 3 targets reclassified to Post-Pilot; E-004: AI-Agent Intent Share moved to Future Horizons).

    13 decisions locked: D-120..D-132.

    29 requirements (REQ-185..213) satisfied. 94 tests pass. CAP-023 + CAP-024 Verified.

    ---ci---
    project: acdl
    phase: 7
    milestone: v1.17
    status: complete
    ---/ci---

    Downloads