Compare commits

...

2 Commits

Author SHA1 Message Date
Jon Chery 1faf4b560f docs(milestone): complete v1.27 PO State Catalog & Ciagent Compression (release v1.26.3)
Nova Slides Render / render (push) Failing after 26s
v1.27 COMPLETE. NFR milestone — PO State Catalog & Ciagent Compression.

Phases:
- P0 pre-execution (specify→clarify→research→plan→grill) → v1.26.0
- P1 author-archive (STATE.md + 8 files archived) → v1.26.1
- P2 fix-stale-wire (PROJECT/ROADMAP phase-status + ship-discipline wiring) → v1.26.2
- P3 final-review-ship (review + audit + milestone ship) → v1.26.3

Delivered:
- .ciagent/STATE.md — PO-facing capability catalog (32 CAP rows +
  11 invariants across 10 domains, backfilled through v1.26). The
  first file the PO reads before writing a new REQ-NNN spec.
- .ciagent/ compression: 7 platform-root files + 1 consumer file
  archived (lossless git mv). Active .md count: 15 (was 25).
- PROJECT.md + ROADMAP.md v1.26 phase-status corrected (P3/P4/P5
  → complete; v1.25.5 shipped; merged to main).
- STATE.md wired into the P-final ship discipline (PLAN.md, ROADMAP.md,
  NORTH_STAR.md). Every future milestone ship appends capability rows +
  bumps the 'Last milestone ship' header.

Review: 0 P0 issues. Audit: reconstruction PASS, file discipline CLEAN,
branch hygiene CLEAN, commit discipline CLEAN (13/13 ---ci--- blocks).
NFR purity gate holds (zero feat: commits).

---ci---
project: acdl
phase: 3
milestone: v1.27
status: complete
---ci---
2026-08-19 19:18:12 +00:00
Jon Chery 8f62cfdbe7 merge(phase/02): v1.27 P2 fix-stale-wire complete
Tags: v1.26.2 (P2 ship on the v1.26.x line).

---ci---
project: acdl
phase: 2
milestone: v1.27
status: complete
---ci---
2026-08-19 19:17:07 +00:00
3 changed files with 26 additions and 9 deletions
+9 -7
View File
@@ -1,17 +1,19 @@
{
"phase": 2,
"phase": 3,
"stage": "complete",
"milestone": "v1.27",
"phase_role": "execution",
"phase_role": "final",
"attempts": 0,
"updated_at": "2026-08-19T05:15:00Z",
"updated_at": "2026-08-19T05:30:00Z",
"project": "acdl",
"projects": ["acdl", "nova-blockchain-exchange"],
"active_milestone": "v1.27",
"milestone_branch": "milestone/v1.27-po-state-catalog",
"phase_branch": "phase/02-fix-stale-wire",
"phase_branch": "phase/03-final-review-ship",
"tag_line": "v1.26.x",
"current_phase": {"phase": 2, "tag": "v1.26.2", "status": "complete"},
"previous_phase": {"phase": 1, "tag": "v1.26.1", "status": "complete"},
"notes": "v1.27 P2 complete. PROJECT.md + ROADMAP.md phase-status fixed (P3/P4/P5 complete, v1.25.5 shipped). STATE.md wired into PLAN.md + NORTH_STAR.md + ROADMAP.md P5 ship-update lists. archive/README.md updated with 8 archived files. 0 active dangling references. Next: P3 final-review-ship."
"current_phase": {"phase": 3, "tag": "v1.26.3", "status": "complete"},
"previous_phase": {"phase": 2, "tag": "v1.26.2", "status": "complete"},
"milestone_complete": true,
"milestone_release": {"tag": "v1.26.3", "type": "nfr"},
"notes": "v1.27 COMPLETE. NFR milestone (PO State Catalog & Ciagent Compression). 3 phases. STATE.md authored (32 CAPs, 11 invariants, 10 domains). 8 files archived (7 platform + 1 consumer). PROJECT.md + ROADMAP.md v1.26 phase-status fixed. STATE.md wired into P-final ship discipline. Review: 0 P0. Audit: reconstruction PASS, file discipline CLEAN, branch hygiene CLEAN, commit discipline CLEAN (13/13 ---ci--- blocks). Next run starts a new milestone."
}
+13
View File
@@ -81,6 +81,19 @@
before building the new env). New `core/env_transition.py` module.
15 requirements (REQ-276..290), 4 phases.
- **v1.27:** complete (tag `v1.26.3`) — PO State Catalog & Ciagent
Compression. NFR milestone. Authored `.ciagent/STATE.md` (PO-facing
capability catalog, 32 CAP rows + 11 invariants across 10 domains,
backfilled through v1.26). Archived 7 platform-root files + 1
consumer file to `.ciagent/archive/` (CAPABILITY_INVENTORY,
REVIEW-AUDIT-P05, VERIFY-P03, VERIFY-P04, P4-PILOT-RUN-EVIDENCE,
AUTONOMY_THESIS, COST + nova-blockchain-exchange/ROADMAP). Fixed
PROJECT.md + ROADMAP.md v1.26 phase-status (P3/P4/P5 → complete).
Wired STATE.md into the P-final ship discipline (PLAN.md, ROADMAP.md,
NORTH_STAR.md). Active `.ciagent/` root: 15 .md (was 25) + 1 json + 1
checkpoint. 3 phases (P0 pre-execution + P1 author-archive + P2
fix-stale-wire + P3 final-review-ship). No REQ-NNN (NFR).
> **Full v1.0v1.24 phase detail, wave ordering, success criteria, and
> decision cross-references:** `.ciagent/archive/ROADMAP-v1.0-v1.24.md`.
+4 -2
View File
@@ -11,8 +11,10 @@
> *why*, read `NORTH_STAR.md`. For *how*, read `ARCHITECTURE.md`. For
> *what was decided*, read `PROJECT.md` load-bearing decisions.
>
> **Last milestone ship:** v1.26 (`v1.25.5`, 2026-08-19).
> **Next update:** at v1.27 ship.
> **Last milestone ship:** v1.27 (`v1.26.3`, 2026-08-19) — PO State Catalog
> & Ciagent Compression NFR milestone. No new capabilities this
> milestone (NFR); v1.27 authored this file + compressed `.ciagent/`.
> **Next update:** at v1.28 ship.
## How to use this file (PO)