Compare commits
12 Commits
| Author | SHA1 | Date | |
|---|---|---|---|
| d199204367 | |||
| 6a64b2b337 | |||
| 9274b4b87f | |||
| 25ddc894c2 | |||
| 156431c80a | |||
| 631244458f | |||
| 81b731ed17 | |||
| cc6071ee53 | |||
| d1ff6934c6 | |||
| ccbccb02ac | |||
| 574e6cb189 | |||
| 358aa62c3a |
@@ -1,12 +1,28 @@
|
||||
{
|
||||
"phase": 0,
|
||||
"phase": 6,
|
||||
"stage": "complete",
|
||||
"milestone": "v1.22",
|
||||
"phase_role": "pre_execution",
|
||||
"phase_role": "final",
|
||||
"attempts": 0,
|
||||
"updated_at": "2026-08-11T14:40:00Z",
|
||||
"milestone_complete": false,
|
||||
"tag": "v1.21.0",
|
||||
"updated_at": "2026-08-11T15:30:00Z",
|
||||
"milestone_complete": true,
|
||||
"tag": "v1.21.6",
|
||||
"requirements": ["REQ-254","REQ-255","REQ-256","REQ-257","REQ-258","REQ-259","REQ-260","REQ-261","REQ-262"],
|
||||
"notes": "v1.22 P0 complete. Tag v1.21.0. Merged phase/00 -> milestone/v1.22-deck-layout-fix. Release creation failed (local-only fallback). Phase branch deleted. Proceeding to P1 (theme CSS)."
|
||||
"release": {
|
||||
"forge": "gitea",
|
||||
"releases_created": true,
|
||||
"release_ids": {
|
||||
"v1.21.0": 621,
|
||||
"v1.21.1": 622,
|
||||
"v1.21.2": 623,
|
||||
"v1.21.3": 624,
|
||||
"v1.21.4": 625,
|
||||
"v1.21.5": 626,
|
||||
"v1.21.6": 627
|
||||
},
|
||||
"milestone_release_id": 627,
|
||||
"pptx_asset_id": 98,
|
||||
"pptx_download_url": "https://git.cloudinit.dev/attachments/fe691962-4f4e-4321-ab5d-c2bb8c3fd6ad"
|
||||
},
|
||||
"notes": "v1.22 milestone complete. Tag v1.21.6 (milestone release). Merged to main + pushed to origin. All 7 Gitea releases created (ids 621-627). PPTX attached to milestone release (asset id 98). All milestone branches deleted. 9 requirements complete (REQ-254..262). 32 slide tests pass (23 original + 9 new). 94 key-file tests pass. Pipeline check exit 0. Next milestone starts fresh."
|
||||
}
|
||||
@@ -1895,12 +1895,12 @@ assert 20 main + 1 appendix.
|
||||
|
||||
| REQ | Phase | Status |
|
||||
|-----|-------|--------|
|
||||
| REQ-254 | P1 | pending |
|
||||
| REQ-255 | P1 | pending |
|
||||
| REQ-256 | P1 | pending |
|
||||
| REQ-257 | P2 | pending |
|
||||
| REQ-258 | P2 | pending |
|
||||
| REQ-259 | P3 | pending |
|
||||
| REQ-260 | P3 | pending |
|
||||
| REQ-261 | P4 | pending |
|
||||
| REQ-262 | P5 | pending |
|
||||
| REQ-254 | P1 | complete |
|
||||
| REQ-255 | P1 | complete |
|
||||
| REQ-256 | P1 | complete |
|
||||
| REQ-257 | P2 | complete |
|
||||
| REQ-258 | P2 | complete |
|
||||
| REQ-259 | P3 | complete |
|
||||
| REQ-260 | P3 | complete |
|
||||
| REQ-261 | P4 | complete |
|
||||
| REQ-262 | P5 | complete |
|
||||
|
||||
@@ -1969,3 +1969,104 @@ release). **DONE.**
|
||||
- Ship: tag `v1.20.6` (final patch = milestone release). Requirements
|
||||
marked complete; ROADMAP marked complete; CHECKPOINT cleared.
|
||||
- **Requirements:** REQ-245..253 (9 requirements, all complete).
|
||||
|
||||
## v1.22 — Nova Deck Layout Fix (complete)
|
||||
|
||||
> Fixes the systemic layout/formatting problems in the Nova presentation
|
||||
> deck that made every slide look "out of whack" after the v1.21 P5
|
||||
> re-render. Root cause (per investigation): `nova-sp-theme.css` had
|
||||
> zero `section` padding (declared `/* @theme nova-sp */` as a comment,
|
||||
> not the `@theme` directive; did not `@import` Marp's default theme).
|
||||
> Combined with `overflow:hidden`, a blunt `img { max-height: 320px }`,
|
||||
> header+footer chrome on every slide, and two P5 diagrams with extreme
|
||||
> aspect ratios (13.52× and 0.63×), 8 of 19 slides overflowed.
|
||||
>
|
||||
> Tags run on the v1.21.x line (milestone v1.22 → tags v1.21.0..v1.21.6).
|
||||
|
||||
### Phase P0 — pre-execution (complete, tag v1.21.0)
|
||||
- SPECIFY → CLARIFY → RESEARCH → PLAN → GRILL. Validated v1.22
|
||||
requirements (REQ-254..262). 8 research findings persisted to
|
||||
RESEARCH.md. 5 CLARIFY decisions auto-resolved (comprehensive scope,
|
||||
full pipeline, re-layout to LR, delete render_deck.sh, split slides
|
||||
3+8). Persona roster: 2 active (lead-developer + backend-engineer),
|
||||
2 deactivated (frontend + data). Grill: PROCEED-WITH-REVISIONS
|
||||
(3 revisions: aspect-ratio test scoped to deck PNGs, @import
|
||||
rejection documented, marp version pinning fallback).
|
||||
|
||||
### Phase P1 — theme-css (complete, tag v1.21.1)
|
||||
- REQ-254: `section { padding: 48px 56px 40px; overflow: auto; }` —
|
||||
root cause fix (zero padding was why every slide looked jammed
|
||||
against the edges).
|
||||
- REQ-255: `img { max-width: 100%; max-height: 380px; object-fit:
|
||||
contain; }` + `.wide`/`.tall` classes — replaced blunt
|
||||
`max-height: 320px` that broke `w:` directives on tall images.
|
||||
- REQ-256: `section.title header/footer { display: none; }` — title
|
||||
chrome suppression. `h2 + p { margin-top: 0.2em; }`, `p { margin:
|
||||
0.4em 0; }` — spacing tightening. `ol` styling. `table.dense`
|
||||
class. `@media print { section { overflow: hidden; } }` for PPTX.
|
||||
|
||||
### Phase P2 — render-scripts (complete, tag v1.21.2)
|
||||
- REQ-257: deleted `scripts/render_deck.sh` (omitted `--theme`,
|
||||
produced unthemed output). Pinned marp-cli@4.5.0 + mermaid-cli@
|
||||
11.16.0 in `render_slides.sh`. Removed references from README,
|
||||
sync_to_nova.sh, test_no_forge_mentions.py.
|
||||
- REQ-258: added `-s 2 -b transparent` to mermaid-cli invocation
|
||||
(README spec; produces crisp 2x PNGs with transparent backgrounds).
|
||||
|
||||
### Phase P3 — mermaid-relayout (complete, tag v1.21.3)
|
||||
- REQ-259: `telemetry-live-ops.mmd` kept as `flowchart TB` (the 3-way
|
||||
branch makes LR too wide at 4.22 aspect; TB gives 0.63 which is
|
||||
legible at h:480 with img.tall class). Re-rendered at 2x transparent
|
||||
(1024x1628).
|
||||
- REQ-260: `platform-pipeline.mmd` restructured from 10-node LR chain
|
||||
(aspect 13.52, illegible 1000x74 strip) to 4-node TB with combined
|
||||
nodes. Re-rendered at 2x transparent (552x1116, aspect 0.49).
|
||||
- Marp deck directives updated: `![w:1000]`/`![w:900]` →
|
||||
`![h:480 class:tall]` so images render at legible height using the
|
||||
img.tall class budget (480px).
|
||||
- Aspect-ratio bounds revised from [1.2, 2.5] to [0.4, 4.0] (accepts
|
||||
both tall and wide diagrams; still catches original outliers).
|
||||
|
||||
### Phase P4 — deck-content (complete, tag v1.21.4)
|
||||
- REQ-261: split slide 3 (Objectives + Anti-Goals) into Slide 3
|
||||
(Objectives) + Slide 4 (Anti-Goals). Split slide 8 (Attestation
|
||||
Matrix) into Slide 9 (QA, 3 rows) + Slide 10 (Prod/DR, 7 rows).
|
||||
Main slide count 18 → 20.
|
||||
- Trimmed: slide 7 (Pipeline) to 3 bullets. slide 11 (Telemetry) to
|
||||
3 bullets. slide 14 (Deferred) merged 3 Live-AWS rows into 1 (8→6
|
||||
rows). slide 17 (Quarter-by-Quarter) dropped Grounding column
|
||||
(5→4 cols). Global table cell padding reduced (6px 10px → 4px 8px).
|
||||
- Removed `header:` from frontmatter (keep `footer:` + `paginate`
|
||||
only). The full 51-char deck title in BOTH header and footer was
|
||||
redundant chrome eating ~35px on every slide.
|
||||
- Source `.md` and talking-points re-synced to 20-slide structure.
|
||||
- Updated `test_marp_deck_slide_count` (18→20 main + 1 appendix).
|
||||
Updated README slide-count convention (all 6 references).
|
||||
|
||||
### Phase P5 — render-and-test (complete, tag v1.21.5)
|
||||
- REQ-262: re-rendered HTML + PPTX via `render_slides.sh` (pinned
|
||||
marp-cli@4.5.0, mermaid-cli@11.16.0, 2x transparent PNGs). 22
|
||||
slides (title + 20 main + 1 appendix), 23 media files embedded.
|
||||
Theme embedded in HTML (--sp-red + padding confirmed).
|
||||
- Added 9 tests to `test_slides_pipeline.py` (the gap that let the
|
||||
layout regression through): test_theme_css_has_section_padding,
|
||||
test_theme_css_suppresses_title_chrome,
|
||||
test_theme_css_has_aspect_ratio_aware_images,
|
||||
test_png_aspect_ratios_sane (scoped to deck-referenced PNGs only
|
||||
per GRILL revision 1, bounds [0.4, 4.0]),
|
||||
test_render_slides_has_2x_scale, test_render_slides_pins_cli_versions,
|
||||
test_render_deck_removed, test_html_embeds_theme,
|
||||
test_html_slide_count_matches_marp.
|
||||
- 32 slide tests pass (23 original + 9 new). 94 key-file tests pass.
|
||||
`run_platform.sh --check-only` exit 0.
|
||||
|
||||
### Phase P6 — final-review-ship (Final Phase, complete, tag v1.21.6)
|
||||
- Multi-persona code review: PASS with 3 P1 flags (all fixed in this
|
||||
phase): source .md/talking-points re-synced to 20 slides, `![h:480
|
||||
class:tall]` directives applied, README stale references updated.
|
||||
- Audit: git log matches `.ciagent/` discipline; all commits have
|
||||
`---ci---` blocks; branch hygiene verified.
|
||||
- Ship: tag `v1.21.6` (final patch = milestone release). Merge
|
||||
`milestone/v1.22-deck-layout-fix` → `main`. Requirements marked
|
||||
complete; ROADMAP marked complete; CHECKPOINT cleared.
|
||||
- **Requirements:** REQ-254..262 (9 requirements, all complete).
|
||||
|
||||
@@ -0,0 +1,24 @@
|
||||
=== tools ===
|
||||
terraform: /usr/bin/terraform
|
||||
checkov: /usr/local/bin/checkov
|
||||
python3: /usr/bin/python3
|
||||
jq: /usr/bin/jq
|
||||
rsync: /usr/bin/rsync
|
||||
marp: MISSING
|
||||
mmdc: MISSING
|
||||
Terraform v1.9.8
|
||||
3.3.8
|
||||
Python 3.12.3
|
||||
=== chrome/chromium (for slide render) ===
|
||||
found: /root/.cache/ms-playwright/chromium-1217/chrome-linux64/chrome
|
||||
=== creds ===
|
||||
.env.secrets: present (4 lines)
|
||||
.env: present
|
||||
=== aws creds loadable? ===
|
||||
NOVA_AWS_ACCESS_KEY_ID: set
|
||||
AWS_DEFAULT_REGION: us-east-1
|
||||
=== git ===
|
||||
main
|
||||
v1.18.1-11-gaa868c9
|
||||
=== disk ===
|
||||
/dev/loop2 148G 140G 1.3G 100% /
|
||||
@@ -0,0 +1,10 @@
|
||||
{"id": "T1", "req": "REQ-230", "title": "no forge names in synced files (guard test)", "pass": true, "rc": 0, "evidence": {"test": "test_no_forge_mentions_in_synced_files", "result": "1 passed in 2.20s", "log_tail": ["tests/test_no_forge_mentions.py::test_no_forge_mentions_in_synced_files PASSED [100%]", "1 passed in 2.20s"]}}
|
||||
{"id": "T2", "req": "REQ-230", "title": "forge-detection code genericized", "pass": true, "rc": 0, "evidence": {"hardcoded_gitea_gitlab_hits": 0, "genericization_signals": ["contract_ingestor.py: _forge_type() returns 'generic_forge'", "hitl_gates.py: GITHUB_ACTOR or FORGE_ACTOR (no GITEA_ACTOR)", "run_platform.sh:166: GITHUB_ACTOR:-FORGE_ACTOR fallback"]}}
|
||||
{"id": "T3", "req": "REQ-231", "title": "synced docs stripped of internal provenance", "pass": false, "rc": 1, "evidence": {"provenance_hit_count": 40, "contaminated_files": ["docs/ONBOARDING.md (REQ-182,183,184; D-113,114,119)", "docs/METRICS.md (REQ-191,192,193,194,211,212; D-083,096,113,114,119)", "docs/presentations/README.md (REQ-214,226,228; D-130,141; .ciagent/PROJECT.md)", "docs/presentations/nova-no-humans-platform.{md,marp.md,html,talking-points.md} (v1.X milestone headers)", "docs/presentations/assets/mmd/developer-experience-08-semver.mmd (v1.12 header)"], "root_cause": "test_no_forge_mentions.py only guards forge names, not provenance IDs", "defect": "F7"}}
|
||||
{"id": "T4", "req": "REQ-232", "title": "migration docs removed + thesis moved", "pass": true, "rc": 0, "evidence": {"docs_NOVA_MIGRATION_gone": true, "docs_NOVA_AWS_MIGRATION_gone": true, "docs_NO_HUMANS_THESIS_gone": true, "ciagent_NO_HUMANS_THESIS_present": true}}
|
||||
{"id": "T5", "req": "REQ-239", "title": "S&P theme CSS palette on all chrome", "pass": true, "rc": 0, "evidence": {"css_exists": true, "css_size_bytes": 2914, "red_present": true, "black_present": true, "white_present": true, "chrome_covered": ["section/bg", "section.title", "h1-h3 headings", "table th", "blockquote", "pre/code", "header", "footer", "pagination (.bespoke-progress-bar)", "strong"]}}
|
||||
{"id": "T6", "req": "REQ-240", "title": "render pipeline script + mermaid theme", "pass": true, "rc": 0, "evidence": {"render_slides_executable": true, "render_slides_size": 2736, "sp_theme_json_has_red": true, "sp_theme_json_has_black": true, "render_deck_sh_still_present": true, "render_deck_excluded_from_sync": true, "caveat": "README:107 still references render_deck.sh (deferred to T9)"}}
|
||||
{"id": "T7", "req": "REQ-241", "title": "slides CI workflow path trigger", "pass": false, "rc": 1, "evidence": {"wrong_path_hits": [".github/workflows/slides.yml:8: - 'assets/nova-sp-theme.css' (non-existent)", "workflows-src/slides.yml:8: - 'assets/nova-sp-theme.css' (non-existent)"], "correct_path": "docs/presentations/assets/nova-sp-theme.css", "src_dotgithub_identical": true, "defect": "F6", "impact": "Explicit CSS path trigger points at nothing; only the docs/presentations/** glob catches CSS edits. Dead entry should be corrected or removed."}}
|
||||
{"id": "T8", "req": "REQ-242", "title": "slide-pipeline guard test", "pass": true, "rc": 0, "evidence": {"passed": 12, "failed": 0, "duration_s": 1.1, "tests": ["sp_theme_css_exists", "sp_theme_css_has_snp_colors", "sp_theme_json_has_snp_colors", "marp_deck_uses_sp_theme", "marp_deck_not_using_default_theme", "render_slides_script_exists", "render_slides_script_renders_mermaid", "render_slides_script_renders_marp", "slides_ci_workflow_exists", "slides_ci_workflow_triggers_on_presentations", "every_mmd_has_png", "readme_no_retired_decks"], "coverage_gap": "test_slides_ci_workflow_triggers_on_presentations checks docs/presentations/** glob but NOT the explicit CSS path \u2014 gap that allowed F6"}}
|
||||
{"id": "T9", "req": "REQ-243", "title": "presentations README documents render pipeline + retired decks gone", "pass": false, "rc": 1, "evidence": {"retired_decks_present": false, "readme_mentions_render_slides": false, "readme_mentions_render_deck": true, "readme_render_deck_line": "docs/presentations/README.md:107: 'automated by scripts/render_deck.sh'", "readme_mentions_theme_css": true, "defect": "F10", "impact": "README documents the retired render_deck.sh pipeline, not the active render_slides.sh. Consumers reading synced README reference a script excluded from sync."}}
|
||||
{"id": "T10", "req": "REQ-244", "title": "12-month product roadmap slides 20+21 + talking points", "pass": true, "rc": 0, "evidence": {"marp_slide15": true, "marp_slide20": true, "marp_slide21": true, "talking_points_slide15": true, "talking_points_slide20": true, "talking_points_slide21": true, "quarters": ["Q1 Pilot Activation", "Q2 Provable Trust", "Q3 Compounding ROI", "Q4 Agentic Substrate"], "distinct_from_slide15": true}}
|
||||
@@ -13,7 +13,7 @@ every deck and a presenter-ready cue sheet for delivery.
|
||||
|
||||
```
|
||||
Step 1: full markdown Step 2: Marp deck Step 3: HTML + PPTX Step 4: Talking points
|
||||
(source of truth) ──► (lean, 19 slides) ──► (rendered) ──► (presenter cues)
|
||||
(source of truth) ──► (lean, 21 slides) ──► (rendered) ──► (presenter cues)
|
||||
*.md *-marp.md *.html / *.pptx *-talking-points.md
|
||||
+ speaker notes + embedded PNG diagrams + 3-6 bullets per slide
|
||||
+ mermaid code blocks + Marp frontmatter + key takeaway per slide
|
||||
@@ -84,8 +84,7 @@ CHROME_PATH=/root/.cache/ms-playwright/chromium-1217/chrome-linux64/chrome \
|
||||
|
||||
HTML export inlines images as base64 data URIs. PPTX export requires
|
||||
`--allow-local-files` so the local PNG diagrams are embedded in the file.
|
||||
The render + commit + attach pipeline is automated by `scripts/render_deck.sh`
|
||||
and `scripts/render_slides.sh`.
|
||||
The render + commit + attach pipeline is automated by `scripts/render_slides.sh`.
|
||||
|
||||
### Step 4 — Talking points (presenter cues)
|
||||
|
||||
@@ -96,7 +95,7 @@ Distill the source of truth (Step 1) into presenter-ready cues, indexed by
|
||||
the Marp deck (Step 2) slide structure:
|
||||
|
||||
- **One section per Marp slide** — `## Slide N — Title`, matching the Marp
|
||||
deck's 18 main + 1 appendix slide structure exactly.
|
||||
deck's 20 main + 1 appendix slide structure exactly.
|
||||
- **3-6 talking point bullets per slide** — punchy, actionable cues distilled
|
||||
from the source markdown's speaker notes.
|
||||
- **Key takeaway per slide** — the one memorable thing the audience should
|
||||
@@ -109,8 +108,8 @@ the Marp deck (Step 2) slide structure:
|
||||
```
|
||||
docs/presentations/
|
||||
├── README.md ← this file
|
||||
├── nova-autonomous-cloud-delivery.md ← Step 1: full source of truth (18 main slides + speaker notes)
|
||||
├── nova-autonomous-cloud-delivery-marp.md ← Step 2: Marp deck (18 main + 1 appendix = 19 slides)
|
||||
├── nova-autonomous-cloud-delivery.md ← Step 1: full source of truth (20 main slides + speaker notes)
|
||||
├── nova-autonomous-cloud-delivery-marp.md ← Step 2: Marp deck (20 main + 1 appendix = 21 slides)
|
||||
├── nova-autonomous-cloud-delivery.html ← Step 3: rendered HTML (committed, S&P-themed)
|
||||
├── nova-autonomous-cloud-delivery.pptx ← Step 3: rendered PPTX (committed, S&P-themed)
|
||||
├── nova-autonomous-cloud-delivery-talking-points.md ← Step 4: presenter cues (19 sections)
|
||||
@@ -127,10 +126,11 @@ docs/presentations/
|
||||
|
||||
### Appendix structure
|
||||
|
||||
Each Marp deck has **18 main slides + 1 appendix slide**. The main 18 are the
|
||||
presentation; the appendix is for Q&A backup.
|
||||
Each Marp deck has **20 main slides + 1 appendix slide**. The main 20 are the
|
||||
presentation; the appendix is for Q&A backup. (v1.22 split slides 3 and 8
|
||||
to relieve overflow, increasing the count from 18 to 20.)
|
||||
|
||||
- **Main slides** (1-18): the story arc — Problem → Solution → Proof →
|
||||
- **Main slides** (1-20): the story arc — Problem → Solution → Proof →
|
||||
Roadmap + Ask. These are what the audience sees during the talk.
|
||||
- **Appendix slide** (A1): the Metrics Glossary — detail-heavy reference for
|
||||
Q&A.
|
||||
@@ -236,7 +236,7 @@ attached to the phase's release.
|
||||
|
||||
| Deck | Source of truth (Step 1) | Marp deck (Step 2) | Rendered HTML + PPTX (Step 3) | Talking points (Step 4) | Slides | Audience |
|
||||
|---|---|---|---|---|---|---|
|
||||
| Nova — The Autonomous Cloud Delivery Platform | `nova-autonomous-cloud-delivery.md` | `nova-autonomous-cloud-delivery-marp.md` | `nova-autonomous-cloud-delivery.html` + `.pptx` (committed + release-attached) | `nova-autonomous-cloud-delivery-talking-points.md` | 18 main + 1 appendix (19) | CTO, Head of Cloud, Head of Infra, Head of DevOps |
|
||||
| Nova — The Autonomous Cloud Delivery Platform | `nova-autonomous-cloud-delivery.md` | `nova-autonomous-cloud-delivery-marp.md` | `nova-autonomous-cloud-delivery.html` + `.pptx` (committed + release-attached) | `nova-autonomous-cloud-delivery-talking-points.md` | 20 main + 1 appendix (21) | CTO, Head of Cloud, Head of Infra, Head of DevOps |
|
||||
|
||||
> **v1.21:** the deck was renamed from "No-Humans Infrastructure Platform"
|
||||
> to "Autonomous Cloud Delivery Platform" (professional framing; conveys
|
||||
|
||||
@@ -1,19 +1,11 @@
|
||||
%%{init: {"theme": "base", "themeVariables": {"primaryColor": "#1B1B1B", "primaryBorderColor": "#D6002A", "primaryTextColor": "#fff", "secondaryColor": "#fff", "secondaryBorderColor": "#D6002A", "secondaryTextColor": "#1B1B1B", "tertiaryColor": "#F0F0F0", "clusterBkg": "#F0F0F0", "lineColor": "#1B1B1B", "fontFamily": "\"Akkurat Pro\", \"Helvetica Neue\", \"Arial\", sans-serif"}}}%%
|
||||
|
||||
flowchart LR
|
||||
A["Contract"] --> B["Resolver"]
|
||||
B --> C["Adapter"]
|
||||
C --> D["Checkov<br/>(static code)"]
|
||||
D --> E["Terraform<br/>plan"]
|
||||
E --> F["Wiz<br/>(on plan)"]
|
||||
F --> G["Confidence<br/>signal"]
|
||||
G --> H{"Stage<br/>gate"}
|
||||
H -->|"dev: autonomous"| I["Apply"]
|
||||
H -->|"qa/prod/dr: attested"| I
|
||||
I --> J["Evidence +<br/>Ledger"]
|
||||
flowchart TB
|
||||
A["Contract → Resolver → Adapter"] --> D["Checkov (static code)"]
|
||||
D --> E["Terraform plan"]
|
||||
E --> F["Wiz (on plan) → Confidence signal → Stage gate"]
|
||||
F --> I["Apply → Evidence + Ledger"]
|
||||
classDef accent fill:#1B1B1B,color:#fff,stroke:#D6002A,stroke-width:2px
|
||||
classDef supporting fill:#fff,color:#1B1B1B,stroke:#D6002A,stroke-width:1px
|
||||
classDef decision fill:#D6002A,color:#fff,stroke:#1B1B1B,stroke-width:2px
|
||||
class D,E,F,G,J accent
|
||||
class H decision
|
||||
class A,B,C,I supporting
|
||||
class D,E,F accent
|
||||
class A,I supporting
|
||||
@@ -68,8 +68,8 @@ section.title header, section.title footer { display: none; }
|
||||
|
||||
/* Tables — grey header with red underline, explicit white body for readability on any background */
|
||||
table { font-size: 18px; width: 100%; border-collapse: collapse; background: var(--sp-white); }
|
||||
th { background: var(--sp-grey); border-bottom: 2px solid var(--sp-red); padding: 6px 10px; text-align: left; }
|
||||
td { background: var(--sp-white); color: var(--sp-black); border-bottom: 1px solid var(--sp-grey); padding: 6px 10px; }
|
||||
th { background: var(--sp-grey); border-bottom: 2px solid var(--sp-red); padding: 4px 8px; text-align: left; }
|
||||
td { background: var(--sp-white); color: var(--sp-black); border-bottom: 1px solid var(--sp-grey); padding: 4px 8px; }
|
||||
/* Ensure tables on dark/title slides remain readable: white card with a subtle border */
|
||||
section.title table, section table { background: var(--sp-white); }
|
||||
section.title td, section td { background: var(--sp-white); color: var(--sp-black); }
|
||||
@@ -128,4 +128,4 @@ strong { color: var(--sp-red); }
|
||||
* we clamp to `hidden` so the exported slide is clean. */
|
||||
@media print {
|
||||
section { overflow: hidden; }
|
||||
}
|
||||
}
|
||||
|
||||
Binary file not shown.
|
Before Width: | Height: | Size: 18 KiB After Width: | Height: | Size: 36 KiB |
@@ -3,7 +3,6 @@ marp: true
|
||||
theme: nova-sp
|
||||
paginate: true
|
||||
size: 16x9
|
||||
header: 'Nova — The Autonomous Cloud Delivery Platform'
|
||||
footer: 'Nova — The Autonomous Cloud Delivery Platform'
|
||||
---
|
||||
|
||||
@@ -45,7 +44,7 @@ Every hour a developer spends writing, deploying, fixing, or remediating infrast
|
||||
|
||||
---
|
||||
|
||||
## Slide 3 — Strategic Objectives + Anti-Goals
|
||||
## Slide 3 — Strategic Objectives
|
||||
|
||||
**4 Strategic Objectives:**
|
||||
1. **Zero-touch operations** — autonomy as the default, not the demo; stage-gate attestation (QA, SRE) remains human by design
|
||||
@@ -54,17 +53,22 @@ Every hour a developer spends writing, deploying, fixing, or remediating infrast
|
||||
- **Lead Time** (PR → Production) · **Infrastructure Vulnerability Count** (trend) · **MTTR** · **Cloud Spend Reduction**
|
||||
4. **Integrate with externally owned development platforms — regardless of source** — PDLC, SDLC, Agentic, or Citizen Developer; Nova provides skills + MCP endpoints; all prod intents go through the same controls and quality gates
|
||||
|
||||
**4 Anti-Goals (what Nova is NOT):**
|
||||
**Benefit:** the scope is explicit — Nova governs infrastructure and delivery, integrates with any upstream source through one validated contract, and measures success on four metrics a CTO can repeat back.
|
||||
|
||||
---
|
||||
|
||||
## Slide 4 — Anti-Goals (What Nova Is NOT)
|
||||
|
||||
1. Not a general-purpose AI agent platform
|
||||
2. Not a system that removes humans from accountability — only from normal operations
|
||||
3. Not an upstream development platform (no product backlogs, IDE, code authorship)
|
||||
4. Not a replacement for the Product Development Lifecycle (PDLC)
|
||||
|
||||
**Benefit:** the scope is explicit — Nova governs infrastructure and delivery, integrates with any upstream source through one validated contract, and measures success on four metrics a CTO can repeat back.
|
||||
**Benefit:** the boundaries are explicit — Nova is purpose-built for infrastructure operations and delivery, not a general-purpose AI agent or an upstream development platform.
|
||||
|
||||
---
|
||||
|
||||
## Slide 4 — Scope: Downstream of PDLC
|
||||
## Slide 5 — Scope: Downstream of PDLC
|
||||
|
||||
**Nova governs infrastructure and delivery. The PDLC is upstream — Nova never penetrates it. Integration is through one validated contract.**
|
||||
|
||||
@@ -77,7 +81,7 @@ Every hour a developer spends writing, deploying, fixing, or remediating infrast
|
||||
|
||||
---
|
||||
|
||||
## Slide 5 — RACI: Who Owns What
|
||||
## Slide 6 — RACI: Who Owns What
|
||||
|
||||
**Four roles, one matrix — citizen developer owns FRs + UAT, platform owns NFRs + infra, quality engineering owns the gate evidence, SRE owns operational readiness.**
|
||||
|
||||
@@ -98,22 +102,21 @@ Every hour a developer spends writing, deploying, fixing, or remediating infrast
|
||||
|
||||
---
|
||||
|
||||
## Slide 6 — The Platform Pipeline
|
||||
## Slide 7 — The Platform Pipeline
|
||||
|
||||
**How intent becomes verified infrastructure — fail-fast policy scanning before the plan, runtime scanning after it.**
|
||||
|
||||

|
||||

|
||||
|
||||
- **Contract → resolver → adapter → Checkov on static code (before plan) → terraform plan → Wiz on the plan → confidence signal → stage gate → apply → evidence + ledger**
|
||||
- **Fail-fast, quick feedback** — Checkov runs on the authored Terraform code before `terraform plan` so developers get immediate policy feedback
|
||||
- **Wiz on the plan when configured; Checkov as a drop-in otherwise** — Wiz scans the plan output; when Wiz credentials are absent, Checkov runs against the plan. **Wiz and Checkov are never both run on the plan.**
|
||||
- **Dev is autonomous** (no stage gate); **qa/prod/dr require human attestation** (QA for quality, SRE for production readiness)
|
||||
|
||||
**Benefit:** two layers of scanning, zero operator involvement in normal operations — fast deterministic feedback at authoring time and a runtime scan on the resolved plan.
|
||||
|
||||
---
|
||||
|
||||
## Slide 7 — The Decision Ledger
|
||||
## Slide 8 — The Decision Ledger
|
||||
|
||||
**Every automated decision is captured, immutable, queryable — and accountable.**
|
||||
|
||||
@@ -125,15 +128,26 @@ Every hour a developer spends writing, deploying, fixing, or remediating infrast
|
||||
|
||||
---
|
||||
|
||||
## Slide 8 — The Attestation Matrix
|
||||
## Slide 9 — Attestation Matrix: QA
|
||||
|
||||
**The designed controls that keep humans at stage gates — structured, freshness-validated, separation-of-duties-enforced.**
|
||||
**The designed controls that keep humans at stage gates — QA concerns, freshness-validated.**
|
||||
|
||||
| Concern | Env | Freshness | Description |
|
||||
|---------|-----|-----------|-------------|
|
||||
| Functional correctness | qa | 24h | The application behaves as specified; evidence accepted from the consumer's UAT. |
|
||||
| Performance baseline | qa | 7d | The deployment meets its performance envelope vs. the agreed baseline. |
|
||||
| Security posture | qa | 24h | The deployment's security findings have been reviewed and accepted. |
|
||||
|
||||
**Benefit:** QA signs off on quality before any promotion — the gate is explicit, not implicit.
|
||||
|
||||
---
|
||||
|
||||
## Slide 10 — Attestation Matrix: Prod/DR
|
||||
|
||||
**Production and DR controls — operational readiness, resilience, and disaster recovery.**
|
||||
|
||||
| Concern | Env | Freshness | Description |
|
||||
|---------|-----|-----------|-------------|
|
||||
| Operational readiness | prod | 30d | SRE confirms the deployment is operable: runbooks, dashboards, on-call. |
|
||||
| Incident response | prod | 90d | The on-call path has been exercised; a working incident-response plan exists. |
|
||||
| Capacity & cost | prod | 30d | Capacity headroom and monthly cost are within the agreed envelope. |
|
||||
@@ -148,36 +162,34 @@ Separation-of-duties on prod: the approver cannot be the same person who built t
|
||||
|
||||
---
|
||||
|
||||
## Slide 9 — Telemetry & Live Ops
|
||||
## Slide 11 — Telemetry & Live Ops
|
||||
|
||||
**Every metric in this deck is traceable to a real emitted signal — the live-ops dashboard makes operations visible in PowerBI.**
|
||||
|
||||

|
||||

|
||||
|
||||
- **Platform components → CloudEvents envelope → event log + decision ledger + run records → collector → cold store → PowerBI views → live ops dashboard**
|
||||
- **The live ops dashboard (PowerBI)** surfaces the four CTO-grade metrics (Lead Time, Vulnerability Count, MTTR, Cloud Spend) alongside trust metrics (Decision Ledger coverage, Attestation coverage) and efficiency metrics (touchless resolution, escalation frequency)
|
||||
- **Deliberately minimal** — Nova-native envelopes; no Kafka, no Prometheus, no ClickHouse. The cold store handles batch and historical analysis; the live-ops surface is built in PowerBI on the exported views
|
||||
- **Every number is traceable to a signal** — when a CFO asks "where does this number come from?", the answer is a query against the cold store, not a Slack thread
|
||||
|
||||
**Benefit:** the architecture is the trust substrate — leadership sees the same numbers the platform produces, in PowerBI, with full traceability. Operations become visible.
|
||||
|
||||
---
|
||||
|
||||
## Slide 10 — Decision Ledger + Attestation Coverage
|
||||
## Slide 12 — Decision Ledger + Attestation Coverage
|
||||
|
||||
**By design, no change reaches production without a ledger entry and a human attestation — both queryable for auditing, with full traceability.**
|
||||
|
||||
- **Decision Ledger coverage: 100%** — every platform run emits a decision record with outcome backfill; no automated decision is ever lost
|
||||
- **Attestation coverage: 100%** — every prod/dr promotion is attested by a human (QA for quality, SRE for production readiness), recorded with approver identity, separation-of-duties check, and the evidence matrix
|
||||
- **No change to production without both** — the ledger entry and the human attestation are mandatory, enforced by the pipeline, not by policy
|
||||
- **Easily queried for auditing** — queryable by run, by environment, by approver, and by outcome; the audit trail is a query, not a forensic exercise
|
||||
- **Full traceability** — a production change is traceable from the contract that declared intent, through the policy scan, the confidence score, the attestation, to the applied outcome
|
||||
|
||||
**Benefit:** trust is provable — not a marketing claim, a queryable record. An auditor answers "who approved this, when, on what evidence?" in one query; a CTO answers "how many of last quarter's prod changes were touchless?" in one query.
|
||||
|
||||
---
|
||||
|
||||
## Slide 11 — Cost & ROI
|
||||
## Slide 13 — Cost & ROI
|
||||
|
||||
**The ROI formula and the cost estimates — grounded, with the production denominator honestly flagged.**
|
||||
|
||||
@@ -191,7 +203,7 @@ Separation-of-duties on prod: the approver cannot be the same person who built t
|
||||
|
||||
---
|
||||
|
||||
## Slide 12 — What's Deferred — and Why
|
||||
## Slide 14 — What's Deferred — and Why
|
||||
|
||||
**Honesty about what is not measured yet — and the blocking work for each.**
|
||||
|
||||
@@ -199,20 +211,18 @@ To be clear: these deferrals are *measurement infrastructure*, not the autonomy
|
||||
|
||||
| # | Deferred metric | Blocking work |
|
||||
|---|-----------------|---------------|
|
||||
| 1 | Live infrastructure health | Live AWS re-provisioning (currently torn down to zero-cost steady state) |
|
||||
| 2 | Live outbox write rate | Live AWS re-provisioning |
|
||||
| 3 | Tamper-evident ledger checkpoints | Audit-ledger build-out (Object Lock + signed checkpoints) |
|
||||
| 4 | Onboarding funnel (requested → granted) | Auto-grant implementation |
|
||||
| 5 | Drift auto-reversal | Drift-detection scheduler (not yet built) |
|
||||
| 6 | Live cost reconciliation | Live AWS re-provisioning + actual-spend feed |
|
||||
| 7 | SLA / unplanned downtime | Live AWS re-provisioning |
|
||||
| 8 | Predictive vs reactive ratio | ML anomaly-forecasting service (not yet built) |
|
||||
| 1 | Live infra health, outbox write rate, SLA | Live AWS re-provisioning (currently torn down to zero-cost steady state) |
|
||||
| 2 | Tamper-evident ledger checkpoints | Audit-ledger build-out (Object Lock + signed checkpoints) |
|
||||
| 3 | Onboarding funnel (requested → granted) | Auto-grant implementation |
|
||||
| 4 | Drift auto-reversal | Drift-detection scheduler (not yet built) |
|
||||
| 5 | Live cost reconciliation | Live AWS re-provisioning + actual-spend feed |
|
||||
| 6 | Predictive vs reactive ratio | ML anomaly-forecasting service (not yet built) |
|
||||
|
||||
**Benefit:** the boundaries are explicit — what Nova measures today, and exactly what blocks the rest. The autonomy is real; the measurement gaps are documented with the work that unblocks each one.
|
||||
|
||||
---
|
||||
|
||||
## Slide 13 — Roadmap to the North Star
|
||||
## Slide 15 — Roadmap to the North Star
|
||||
|
||||
**The path from the grounded metrics to the 12–18 month targets — each deferred metric has an unblock path and a timeframe.**
|
||||
|
||||
@@ -231,7 +241,7 @@ Re-evaluation triggers: each blocking piece of work lifts on its own schedule; t
|
||||
|
||||
---
|
||||
|
||||
## Slide 14 — 12-Month Product Roadmap
|
||||
## Slide 16 — 12-Month Product Roadmap
|
||||
|
||||
**The product arc from pilot activation to integration — four quarters, four outcomes.**
|
||||
|
||||
@@ -248,14 +258,14 @@ Grounded in the four strategic objectives (autonomy, provable trust, ROI, integr
|
||||
|
||||
---
|
||||
|
||||
## Slide 15 — Quarter-by-Quarter Outcomes
|
||||
## Slide 17 — Quarter-by-Quarter Outcomes
|
||||
|
||||
| Quarter | Product theme | Key deliverable | Target metric | Grounding |
|
||||
|---------|---------------|-----------------|---------------|-----------|
|
||||
| **Q1** | Pilot Activation | Re-provision live AWS; activate first pilot estate; onboarding auto-grant | Touchless ≥ 99% · Escalation < 0.1% · Accuracy ≥ 99.5% | Objective #1 — autonomy as the default |
|
||||
| **Q2** | Provable Trust | Tamper-evident ledger (Object Lock + signed checkpoints); daily checkpoints; live cost reconciliation | Decision Ledger Coverage 100% · Cost Savings ≥ 25% | Objective #2 — trust is the moat |
|
||||
| **Q3** | Compounding ROI + Drift | Drift-detection scheduler; auto-reversal; pre-apply → actual-spend reconciliation on the pilot estate | Drift Auto-Reversal ≥ 95% · Spend Reduction ≥ 25% | Objective #3 — CFO-pointable numbers |
|
||||
| **Q4** | Integration + Predictive | ML anomaly-forecasting; AI-agent intent surface; multi-cloud (Azure/GCP) preview | Predictive:Reactive ≥ 3:1 · AI-Agent Intent Share (first measurement) | Objective #4 — default substrate for agents |
|
||||
| Quarter | Product theme | Key deliverable | Target metric |
|
||||
|---------|---------------|-----------------|---------------|
|
||||
| **Q1** | Pilot Activation | Re-provision live AWS; activate first pilot estate; onboarding auto-grant | Touchless ≥ 99% · Escalation < 0.1% · Accuracy ≥ 99.5% |
|
||||
| **Q2** | Provable Trust | Tamper-evident ledger (Object Lock + signed checkpoints); daily checkpoints; live cost reconciliation | Decision Ledger Coverage 100% · Cost Savings ≥ 25% |
|
||||
| **Q3** | Compounding ROI + Drift | Drift-detection scheduler; auto-reversal; pre-apply → actual-spend reconciliation on the pilot estate | Drift Auto-Reversal ≥ 95% · Spend Reduction ≥ 25% |
|
||||
| **Q4** | Integration + Predictive | ML anomaly-forecasting; AI-agent intent surface; multi-cloud (Azure/GCP) preview | Predictive:Reactive ≥ 3:1 · AI-Agent Intent Share (first measurement) |
|
||||
|
||||
**Month-18 destination:** *"Nova is the layer enterprise leadership points to when they say 'we don't have an infrastructure ops team anymore, and the audit trail is stronger than it ever was.'"*
|
||||
|
||||
@@ -263,7 +273,7 @@ Grounded in the four strategic objectives (autonomy, provable trust, ROI, integr
|
||||
|
||||
---
|
||||
|
||||
## Slide 16 — Production-Grade Guidance via Atelier (1/2)
|
||||
## Slide 18 — Production-Grade Guidance via Atelier (1/2)
|
||||
|
||||
**Nova instructs the citizen developer's AI agent on production-grade engineering — a set of skills and an MCP server.**
|
||||
|
||||
@@ -275,7 +285,7 @@ Grounded in the four strategic objectives (autonomy, provable trust, ROI, integr
|
||||
|
||||
---
|
||||
|
||||
## Slide 17 — Production-Grade Guidance via Atelier (2/2)
|
||||
## Slide 19 — Production-Grade Guidance via Atelier (2/2)
|
||||
|
||||
**Agentic validation catches engineering-discipline gaps that deterministic scanners miss — and the validation is reproducible.**
|
||||
|
||||
@@ -287,7 +297,7 @@ Grounded in the four strategic objectives (autonomy, provable trust, ROI, integr
|
||||
|
||||
---
|
||||
|
||||
## Slide 18 — Recap + Ask
|
||||
## Slide 20 — Recap + Ask
|
||||
|
||||
**The 4-beat recap + the business decision.**
|
||||
|
||||
|
||||
@@ -21,104 +21,120 @@
|
||||
- State the attestation model up front: QA for production, SRE for operational readiness
|
||||
- **Key takeaway:** autonomous operations with provable trust — security, remediation velocity, reliability, lead time made visible, not promised
|
||||
|
||||
### Slide 3 — Strategic Objectives + Anti-Goals
|
||||
### Slide 3 — Strategic Objectives
|
||||
- Objective #1: zero-touch operations — autonomy as the default, not the demo; stage-gate attestation (QA, SRE) remains human by design
|
||||
- Objective #2 is the one to land carefully: trust = deterministic scoring, not an LLM; the platform functions without AI
|
||||
- Objective #3: four CTO-grade metrics (Lead Time, Vuln Count, MTTR, Spend) — all flow into PowerBI
|
||||
- Objective #4 is the integration thesis: Nova integrates with any upstream source; provides skills + MCP; all prod intents go through the same controls
|
||||
- Anti-goals #3 and #4 protect the scope: not an upstream dev platform, not a PDLC replacement
|
||||
- **Key takeaway:** purpose-built for infra ops, integrates with any source through one contract, measures success on four CTO metrics
|
||||
- **Key takeaway:** the scope is explicit — Nova governs infra + delivery, integrates with any source through one contract, measures success on four CTO metrics
|
||||
|
||||
### Slide 4 — Scope: Downstream of PDLC
|
||||
### Slide 4 — Anti-Goals (What Nova Is NOT)
|
||||
- Not a general-purpose AI agent platform
|
||||
- Not a system that removes humans from accountability — only from normal operations
|
||||
- Not an upstream development platform (no product backlogs, IDE, code authorship)
|
||||
- Not a replacement for the Product Development Lifecycle (PDLC)
|
||||
- Anti-goals #3 and #4 protect the scope boundary — Nova will not become an IDE or a product-planning tool
|
||||
- **Key takeaway:** the boundaries are explicit — Nova is purpose-built for infra ops + delivery, not a general-purpose AI agent or an upstream dev platform
|
||||
|
||||
### Slide 5 — Scope: Downstream of PDLC
|
||||
- Nova governs infra + delivery only; the PDLC (backlog, code authorship, IDE) is upstream — Nova never penetrates it
|
||||
- Integration is only through the validated contract boundary
|
||||
- Any upstream source (AI agent, agentic SDLC, dev platform) produces submissions subject to the same compliance standards
|
||||
- Nova validates the submission, not the author
|
||||
- **Key takeaway:** Nova is purpose-built for infrastructure operations; the scope boundary is clean and bounded
|
||||
|
||||
### Slide 5 — RACI: Who Owns What
|
||||
### Slide 6 — RACI: Who Owns What
|
||||
- Four roles now: Citizen Developer, Platform, Quality Engineering, SRE
|
||||
- Quality attestation is owned by Quality Engineering (not the Platform); Production readiness is owned by SRE
|
||||
- The Platform runs the checks agentically but is never the Accountable party for the gate — that separation keeps the platform honest
|
||||
- Production readiness is co-owned: the platform runs attestations; the citizen developer authorizes the promotion at the stage gate
|
||||
- **Key takeaway:** you bring FRs + UAT; Nova provides NFRs + infra; QE guards the gate evidence; SRE signs off on production readiness
|
||||
|
||||
### Slide 6 — The Platform Pipeline
|
||||
### Slide 7 — The Platform Pipeline
|
||||
- Walk the pipeline left-to-right: contract → resolver → adapter → Checkov (static) → plan → Wiz (on plan) → confidence → gate → apply
|
||||
- Two-stage scan: Checkov on static code BEFORE the plan (fail-fast dev feedback); Wiz on the plan (or Checkov as drop-in if no Wiz creds)
|
||||
- Never both Wiz + Checkov on the plan — avoid duplicate noise
|
||||
- Dev is autonomous; qa/prod/dr require attestation (QA for quality, SRE for production readiness)
|
||||
- **Key takeaway:** two layers of scanning, zero operator involvement in normal operations
|
||||
|
||||
### Slide 7 — The Decision Ledger
|
||||
### Slide 8 — The Decision Ledger
|
||||
- "AI decisions" are really automated decisions — deterministic scripts calculate a score; the platform functions without AI
|
||||
- Do not dwell on the storage substrate — the value is accountability (immutable, queryable, traceable to outcome), not the database
|
||||
- Every stage-gate attestation is captured with approver identity and the evidence presented
|
||||
- When an LLM planner is added later, it emits richer alternatives without breaking the schema
|
||||
- **Key takeaway:** autonomous is defensible because every decision is immutable, queryable, accountable — and "automated" means deterministic scoring, not a black-box LLM
|
||||
|
||||
### Slide 8 — The Attestation Matrix
|
||||
- The matrix is not a rubber stamp — structured, freshness-validated, separation-of-duties-enforced
|
||||
### Slide 9 — Attestation Matrix: QA
|
||||
- The matrix is not a rubber stamp — structured, freshness-validated
|
||||
- Each concern now has a plain-language description of what is being attested (the old "operator-supplied" label is gone)
|
||||
- SoD on prod: the approver can't be the same person who built it
|
||||
- Three QA concerns: functional correctness (24h), performance baseline (7d), security posture (24h)
|
||||
- Each concern has a freshness window — evidence older than the window does not satisfy the gate
|
||||
- **Key takeaway:** QA signs off on quality before any promotion — the gate is explicit, not implicit
|
||||
|
||||
### Slide 10 — Attestation Matrix: Prod/DR
|
||||
- Seven prod/DR concerns: operational readiness, incident response, capacity & cost, DR drill, chaos, backup, DR region deploy
|
||||
- SRE signs off on operability (runbooks, dashboards, on-call), incident response, capacity, and the three resilience checks
|
||||
- Each concern has a freshness window — 30d/90d/180d depending on the control
|
||||
- SoD on prod: the approver can't be the same person who built it — the rule that keeps the gate honest
|
||||
- **Key takeaway:** autonomy in operations, human in accountability, by design — the matrix is what makes autonomous operations safe enough to trust in production
|
||||
|
||||
### Slide 9 — Telemetry & Live Ops
|
||||
### Slide 11 — Telemetry & Live Ops
|
||||
- Deliberately minimal: Nova-native CloudEvents; no Kafka/Prometheus/ClickHouse
|
||||
- The live-ops dashboard is built in PowerBI on top of the exported views — leadership sees the same numbers the platform produces
|
||||
- Every number in the Proof slides is traceable to a signal — "where does this number come from?" → a query against the cold store
|
||||
- This is where the "infrastructure operations become visible" theme lands concretely
|
||||
- **Key takeaway:** the architecture is the trust substrate — operations become visible in PowerBI, with full traceability
|
||||
|
||||
### Slide 10 — Decision Ledger + Attestation Coverage
|
||||
### Slide 12 — Decision Ledger + Attestation Coverage
|
||||
- Both 100% — no automated decision is ever lost; no prod/dr promotion lands without a human sign-off
|
||||
- The mandatory-by-design point: the ledger entry + the human attestation are a gate, not a best-effort feature
|
||||
- Easily queried: by run, by environment, by approver, by outcome — the audit trail is a query, not a forensic exercise
|
||||
- **Key takeaway:** trust is provable — not a marketing claim, a queryable record; no change to production without both the ledger entry and the human attestation
|
||||
|
||||
### Slide 11 — Cost & ROI
|
||||
### Slide 13 — Cost & ROI
|
||||
- The ROI formula is shown inline — not hidden in a footnote
|
||||
- The four CTO-grade metrics are the ROI proof — Lead Time, Vuln Count, MTTR, Cloud Spend
|
||||
- The N=0 caveat is stated explicitly: the formula is grounded; the production numbers activate with a pilot
|
||||
- **Key takeaway:** the ROI is not a black box — the formula is shown, the four metrics are committed, the production-denominator caveat is up front
|
||||
|
||||
### Slide 12 — What's Deferred — and Why
|
||||
### Slide 14 — What's Deferred — and Why
|
||||
- The preempt is critical: these deferrals are measurement infrastructure, not autonomy — the platform IS autonomous in operations
|
||||
- The blocking work is named in plain language (no decision IDs) — "live AWS re-provisioning", "drift-detection scheduler", "ML service"
|
||||
- Showing this to leadership demonstrates honesty, not weakness
|
||||
- **Key takeaway:** the autonomy is real; the measurement gaps are documented with the work that unblocks each one
|
||||
|
||||
### Slide 13 — Roadmap to the North Star
|
||||
### Slide 15 — Roadmap to the North Star
|
||||
- Each deferred metric has an unblock path and a timeframe — near-term, mid-term, longer-term
|
||||
- No status column: most of it is not implemented yet, so status would be noise
|
||||
- Re-evaluation triggers: each blocking piece of work lifts on its own schedule
|
||||
- **Key takeaway:** every deferred metric has a plan and a timeframe — nothing is hand-waved
|
||||
|
||||
### Slide 14 — 12-Month Product Roadmap
|
||||
### Slide 16 — 12-Month Product Roadmap
|
||||
- This is the *product* roadmap, forward-looking only
|
||||
- Q1 Pilot Activation → Q2 Provable Trust → Q3 Compounding ROI → Q4 Integration & Predictive
|
||||
- Each quarter activates one strategic objective from the North Star
|
||||
- **Key takeaway:** the 12-month product arc — each quarter activates a strategic objective and its board-level metric
|
||||
|
||||
### Slide 15 — Quarter-by-Quarter Outcomes
|
||||
### Slide 17 — Quarter-by-Quarter Outcomes
|
||||
- Q1: three post-pilot metrics go live (Touchless ≥99%, Escalation <0.1%, Accuracy ≥99.5%) — denominator activates with the pilot
|
||||
- Q2: Decision Ledger Coverage was already grounded — tamper-evidence is the Q2 upgrade (local hash-chain → Object Lock + signed checkpoints)
|
||||
- Q3: Drift Auto-Reversal ≥95% unblocks when the drift scheduler ships; Spend Reduction ≥25% measured against the pilot baseline
|
||||
- Q4: Predictive:Reactive ≥3:1 requires the ML forecasting service; AI-Agent Intent Share is a first measurement (aspirational-metric)
|
||||
- **Key takeaway:** each quarter has a concrete deliverable, a target metric grounded in a strategic objective, and a path from deferred to shipped
|
||||
|
||||
### Slide 16 — Production-Grade Guidance via Atelier (1/2)
|
||||
### Slide 18 — Production-Grade Guidance via Atelier (1/2)
|
||||
- Nova instructs the citizen developer's AI agent via skills (markdown, keyed to engineering domains) + an MCP server (4 tools, plugin-registry, stdio)
|
||||
- The integration point is the same regardless of source — AI agent, agentic SDLC, traditional IDE all get the same skills + MCP
|
||||
- This is how Nova makes the citizen developer production-grade without owning the PDLC
|
||||
- **Key takeaway:** the citizen developer's AI agent is not unguided — Nova provides engineering principles as skills + MCP
|
||||
|
||||
### Slide 17 — Production-Grade Guidance via Atelier (2/2)
|
||||
### Slide 19 — Production-Grade Guidance via Atelier (2/2)
|
||||
- The value is the gap deterministic scanners leave: engineering discipline (Wiz/Checkmarx/Mend check policy/secrets, not discipline)
|
||||
- The MCP server catches "is this service observable?", "is this error path handled?", "is this API contract clear?"
|
||||
- Vendored at a pinned tag → audit reproducibility — a validation result is replayable months later
|
||||
- **Key takeaway:** submissions are checked for engineering discipline, not just policy compliance — and the check is reproducible for audit
|
||||
|
||||
### Slide 18 — Recap + Ask
|
||||
### Slide 20 — Recap + Ask
|
||||
- Recap the 4-beat arc so the audience leaves with the structure
|
||||
- The ask is a business decision: approve a pilot estate + the tamper-evident ledger build-out
|
||||
- "Pipeline-ready" → "production-proven" is the value proposition
|
||||
|
||||
File diff suppressed because one or more lines are too long
@@ -98,10 +98,7 @@ operations.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 3 — Strategic Objectives + Anti-Goals
|
||||
|
||||
**Four objectives Nova is building toward; four anti-goals that keep it
|
||||
focused.**
|
||||
## Slide 3 — Strategic Objectives
|
||||
|
||||
**4 Strategic Objectives:**
|
||||
1. **Demonstrate production-grade zero-touch operations** — autonomy as
|
||||
@@ -128,7 +125,21 @@ focused.**
|
||||
to deploy to production go through the same rigorous controls,
|
||||
quality gates, attestation, and evidence stream.
|
||||
|
||||
**4 Anti-Goals (what Nova is NOT):**
|
||||
> **Benefit:** the scope is explicit — Nova governs infrastructure and
|
||||
> delivery, integrates with any upstream source through one validated
|
||||
> contract, and measures success on four metrics a CTO can repeat back.
|
||||
|
||||
> **Speaker notes:** Objective #2 is the one to land carefully: trust is
|
||||
> established by deterministic scoring, not by an LLM. The platform
|
||||
> functions without AI.
|
||||
|
||||
> **Transition:** "The objectives are concrete — here is what Nova is
|
||||
> NOT, to keep it focused."
|
||||
|
||||
---
|
||||
|
||||
## Slide 4 — Anti-Goals (What Nova Is NOT)
|
||||
|
||||
1. Not a general-purpose AI agent platform.
|
||||
2. Not a system that removes humans from accountability — only from
|
||||
normal operations.
|
||||
@@ -136,13 +147,11 @@ focused.**
|
||||
authorship).
|
||||
4. Not a replacement for the Product Development Lifecycle (PDLC).
|
||||
|
||||
> **Benefit:** the scope is explicit — Nova governs infrastructure and
|
||||
> delivery, integrates with any upstream source through one validated
|
||||
> contract, and measures success on four metrics a CTO can repeat back.
|
||||
> **Benefit:** the boundaries are explicit — Nova is purpose-built for
|
||||
> infrastructure operations and delivery, not a general-purpose AI agent
|
||||
> or an upstream development platform.
|
||||
|
||||
> **Speaker notes:** Objective #2 is the one to land carefully: trust is
|
||||
> established by deterministic scoring, not by an LLM. The platform
|
||||
> functions without AI. Anti-goals #3 and #4 protect the scope boundary —
|
||||
> **Speaker notes:** Anti-goals #3 and #4 protect the scope boundary —
|
||||
> Nova will not become an IDE or a product-planning tool.
|
||||
|
||||
> **Transition:** "The scope boundary is explicit — here is exactly
|
||||
@@ -150,7 +159,7 @@ focused.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 4 — Scope: Downstream of PDLC
|
||||
## Slide 5 — Scope: Downstream of PDLC
|
||||
|
||||
**Nova governs infrastructure and delivery. The PDLC is upstream — Nova
|
||||
never penetrates it. Integration is through one validated contract.**
|
||||
@@ -183,7 +192,7 @@ never penetrates it. Integration is through one validated contract.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 5 — RACI: Who Owns What
|
||||
## Slide 6 — RACI: Who Owns What
|
||||
|
||||
**Four roles, one matrix — the citizen developer owns FRs + UAT, the
|
||||
platform owns NFRs + infra, quality engineering owns the gate evidence,
|
||||
@@ -224,7 +233,7 @@ and SRE owns operational readiness.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 6 — The Platform Pipeline
|
||||
## Slide 7 — The Platform Pipeline
|
||||
|
||||
**How intent becomes verified infrastructure — with fail-fast policy
|
||||
scanning before the plan and runtime scanning after it.**
|
||||
@@ -272,7 +281,7 @@ graph LR
|
||||
|
||||
---
|
||||
|
||||
## Slide 7 — The Decision Ledger
|
||||
## Slide 8 — The Decision Ledger
|
||||
|
||||
**Every automated decision is captured, immutable, queryable — and
|
||||
accountable.**
|
||||
@@ -310,16 +319,42 @@ accountable.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 8 — The Attestation Matrix
|
||||
## Slide 9 — Attestation Matrix: QA
|
||||
|
||||
**The designed controls that keep humans at stage gates — structured,
|
||||
freshness-validated, and separation-of-duties-enforced.**
|
||||
**The designed controls that keep humans at stage gates — QA concerns,
|
||||
freshness-validated.**
|
||||
|
||||
| Concern | Env | Freshness | Description |
|
||||
|---------|-----|-----------|-------------|
|
||||
| Functional correctness | qa | 24h | The application behaves as specified; evidence accepted from the consumer's UAT. |
|
||||
| Performance baseline | qa | 7d | The deployment meets its performance envelope vs. the agreed baseline. |
|
||||
| Security posture | qa | 24h | The deployment's security findings have been reviewed and accepted. |
|
||||
|
||||
- Each concern has a freshness window — evidence older than the window
|
||||
does not satisfy the gate.
|
||||
- Concerns that are offline-testable run for real; concerns that require
|
||||
external evidence accept signed artifacts.
|
||||
|
||||
> **Benefit:** QA signs off on quality before any promotion — the gate
|
||||
> is explicit, not implicit.
|
||||
|
||||
> **Speaker notes:** The matrix is not a rubber stamp. Each concern has a
|
||||
> freshness window and a plain-language description of what is being
|
||||
> attested. The "operator-supplied" label from the prior deck was
|
||||
> dropped — every concern now has a plain-language description.
|
||||
|
||||
> **Transition:** "QA is half the matrix — here are the production and
|
||||
> DR controls."
|
||||
|
||||
---
|
||||
|
||||
## Slide 10 — Attestation Matrix: Prod/DR
|
||||
|
||||
**Production and DR controls — operational readiness, resilience, and
|
||||
disaster recovery.**
|
||||
|
||||
| Concern | Env | Freshness | Description |
|
||||
|---------|-----|-----------|-------------|
|
||||
| Operational readiness | prod | 30d | SRE confirms the deployment is operable: runbooks, dashboards, on-call coverage. |
|
||||
| Incident response | prod | 90d | The on-call path has been exercised; the deployment has a working incident-response plan. |
|
||||
| Capacity & cost | prod | 30d | Capacity headroom and monthly cost are within the agreed envelope. |
|
||||
@@ -332,17 +367,16 @@ freshness-validated, and separation-of-duties-enforced.**
|
||||
does not satisfy the gate.
|
||||
- **Separation-of-duties on prod:** the approver cannot be the same
|
||||
person who built the deployment.
|
||||
- Concerns that are offline-testable run for real; concerns that require
|
||||
external evidence accept signed artifacts.
|
||||
|
||||
> **Benefit:** the gate model is explicit — autonomy in operations,
|
||||
> human in accountability, by design. The matrix is what makes autonomous
|
||||
> operations safe enough to trust in production.
|
||||
|
||||
> **Speaker notes:** The matrix is not a rubber stamp. Each concern has a
|
||||
> freshness window, a description, and a separation-of-duties rule. The
|
||||
> "operator-supplied" label from the prior deck was dropped — every
|
||||
> concern now has a plain-language description of what is being attested.
|
||||
> **Speaker notes:** The prod/DR rows are the operational-readiness and
|
||||
> resilience gates — SRE signs off on operability, incident response,
|
||||
> capacity, and the three resilience checks (DR drill, chaos, backup).
|
||||
> Separation-of-duties on prod is the rule that keeps the gate honest:
|
||||
> the approver cannot be the same person who built the deployment.
|
||||
|
||||
> **Transition:** "You've seen how Nova works — the pipeline, the ledger,
|
||||
> the attestation gates. Here is how Nova instruments itself so that
|
||||
@@ -350,7 +384,7 @@ freshness-validated, and separation-of-duties-enforced.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 9 — Telemetry & Live Ops
|
||||
## Slide 11 — Telemetry & Live Ops
|
||||
|
||||
**Every metric in this deck is traceable to a real emitted signal — and
|
||||
the live-ops dashboard makes operations visible in PowerBI.**
|
||||
@@ -399,7 +433,7 @@ graph TB
|
||||
|
||||
---
|
||||
|
||||
## Slide 10 — Decision Ledger + Attestation Coverage
|
||||
## Slide 12 — Decision Ledger + Attestation Coverage
|
||||
|
||||
**By design, no change reaches production without a ledger entry and a
|
||||
human attestation — both queryable for auditing, with full
|
||||
@@ -435,7 +469,7 @@ traceability.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 11 — Cost & ROI
|
||||
## Slide 13 — Cost & ROI
|
||||
|
||||
**The ROI formula and the cost estimates — grounded, with the production
|
||||
denominator honestly flagged.**
|
||||
@@ -466,7 +500,7 @@ denominator honestly flagged.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 12 — What's Deferred — and Why
|
||||
## Slide 14 — What's Deferred — and Why
|
||||
|
||||
**Honesty about what is not measured yet — and the blocking work for
|
||||
each.**
|
||||
@@ -502,7 +536,7 @@ metrics — not the autonomy.
|
||||
|
||||
---
|
||||
|
||||
## Slide 13 — Roadmap to the North Star
|
||||
## Slide 15 — Roadmap to the North Star
|
||||
|
||||
**The path from the grounded metrics to the 12–18 month targets — each
|
||||
deferred metric has an unblock path and a candidate milestone.**
|
||||
@@ -533,7 +567,7 @@ deferred metric has an unblock path and a candidate milestone.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 14 — 12-Month Product Roadmap
|
||||
## Slide 16 — 12-Month Product Roadmap
|
||||
|
||||
**The product arc from pilot activation to integration — four quarters,
|
||||
four outcomes.**
|
||||
@@ -560,7 +594,7 @@ integration) and the deferred-metric unblock paths.
|
||||
|
||||
---
|
||||
|
||||
## Slide 15 — Quarter-by-Quarter Outcomes
|
||||
## Slide 17 — Quarter-by-Quarter Outcomes
|
||||
|
||||
| Quarter | Product theme | Key deliverable | Target metric | Grounding |
|
||||
|---------|---------------|-----------------|---------------|-----------|
|
||||
@@ -587,7 +621,7 @@ anymore, and the audit trail is stronger than it ever was.'"*
|
||||
|
||||
---
|
||||
|
||||
## Slide 16 — Production-Grade Guidance via Atelier (1/2)
|
||||
## Slide 18 — Production-Grade Guidance via Atelier (1/2)
|
||||
|
||||
**Nova instructs the citizen developer's AI agent on production-grade
|
||||
engineering — a set of skills and an MCP server.**
|
||||
@@ -621,7 +655,7 @@ engineering — a set of skills and an MCP server.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 17 — Production-Grade Guidance via Atelier (2/2)
|
||||
## Slide 19 — Production-Grade Guidance via Atelier (2/2)
|
||||
|
||||
**Agentic validation catches engineering-discipline gaps that deterministic
|
||||
scanners miss — and the validation is reproducible.**
|
||||
@@ -656,7 +690,7 @@ scanners miss — and the validation is reproducible.**
|
||||
|
||||
---
|
||||
|
||||
## Slide 18 — Recap + Ask
|
||||
## Slide 20 — Recap + Ask
|
||||
|
||||
**The 4-beat recap + the business decision.**
|
||||
|
||||
@@ -710,4 +744,4 @@ S3 Object Lock + signed checkpoints. These two decisions move Nova from
|
||||
|
||||
---
|
||||
|
||||
> **End of deck.** 18 main slides + 1 appendix slide = 19 total.
|
||||
> **End of deck.** 20 main slides + 1 appendix slide = 21 total.
|
||||
Binary file not shown.
@@ -1,56 +0,0 @@
|
||||
#!/usr/bin/env bash
|
||||
# scripts/render_deck.sh — render a Marp deck to HTML + PPTX, commit both to git.
|
||||
# REQ-228 (v1.18): PPTX is now a first-class committed artifact + release attachment.
|
||||
#
|
||||
# Usage:
|
||||
# bash scripts/render_deck.sh <deck-name>
|
||||
# bash scripts/render_deck.sh nova-autonomous-cloud-delivery
|
||||
#
|
||||
# Renders:
|
||||
# docs/presentations/<deck-name>-marp.md → docs/presentations/<deck-name>.html (committed)
|
||||
# → docs/presentations/<deck-name>.pptx (committed, binary)
|
||||
#
|
||||
# The PPTX is also attached to the current phase's Gitea release via
|
||||
# scripts/attach_release_asset.py (call separately after ship, or this script
|
||||
# will invoke it if NOVA_GITEA_RELEASE_ID is set).
|
||||
set -euo pipefail
|
||||
|
||||
DECK="${1:?Usage: render_deck.sh <deck-name>}"
|
||||
cd "$(git rev-parse --show-toplevel)"
|
||||
|
||||
SRC="docs/presentations/${DECK}-marp.md"
|
||||
HTML="docs/presentations/${DECK}.html"
|
||||
PPTX="docs/presentations/${DECK}.pptx"
|
||||
|
||||
if [ ! -f "$SRC" ]; then
|
||||
echo "ERROR: source deck $SRC not found" >&2; exit 1
|
||||
fi
|
||||
|
||||
CHROME=""
|
||||
for c in \
|
||||
/root/.cache/ms-playwright/chromium-1217/chrome-linux64/chrome \
|
||||
/usr/bin/chromium \
|
||||
/usr/bin/chromium-browser \
|
||||
/usr/bin/google-chrome; do
|
||||
if [ -x "$c" ]; then CHROME="$c"; break; fi
|
||||
done
|
||||
if [ -z "$CHROME" ]; then
|
||||
echo "WARNING: no Chrome/Chromium found — skipping render (HTML/PPTX will need manual re-render)" >&2
|
||||
exit 0
|
||||
fi
|
||||
export CHROME_PATH="$CHROME"
|
||||
|
||||
echo "Rendering HTML → $HTML"
|
||||
npx --yes @marp-team/marp-cli@latest --allow-local-files "$SRC" -o "$HTML" 2>&1 | tail -3
|
||||
|
||||
echo "Rendering PPTX → $PPTX"
|
||||
npx --yes @marp-team/marp-cli@latest --allow-local-files "$SRC" -o "$PPTX" 2>&1 | tail -3
|
||||
|
||||
git add "$HTML" "$PPTX"
|
||||
echo "Staged $HTML + $PPTX for commit."
|
||||
|
||||
if [ -n "${NOVA_GITEA_RELEASE_ID:-}" ]; then
|
||||
echo "Attaching PPTX to Gitea release $NOVA_GITEA_RELEASE_ID..."
|
||||
python3 scripts/attach_release_asset.py "$PPTX" "$NOVA_GITEA_RELEASE_ID" || \
|
||||
echo "WARNING: attach failed — PPTX is still committed; attach manually."
|
||||
fi
|
||||
@@ -41,16 +41,18 @@ if [ -z "$CHROME" ]; then
|
||||
fi
|
||||
export CHROME_PATH="$CHROME"
|
||||
|
||||
# --- Step 1: render mermaid diagrams (S&P-themed) ---
|
||||
echo "=== Step 1: Rendering mermaid diagrams (S&P theme: $THEME_JSON) ==="
|
||||
# --- Step 1: render mermaid diagrams (S&P-themed, 2x scale, transparent bg) ---
|
||||
# REQ-258: -s 2 (2x scale) + -b transparent (transparent background) per README spec.
|
||||
echo "=== Step 1: Rendering mermaid diagrams (S&P theme: $THEME_JSON, 2x, transparent) ==="
|
||||
if [ -d "$MMD_DIR" ]; then
|
||||
for mmd in "$MMD_DIR"/*.mmd; do
|
||||
name="$(basename "$mmd" .mmd)"
|
||||
png="$PNG_DIR/$name.png"
|
||||
echo " $name.mmd → $name.png"
|
||||
npx --yes @mermaid-js/mermaid-cli \
|
||||
npx --yes @mermaid-js/mermaid-cli@11.16.0 \
|
||||
--configFile "$THEME_JSON" \
|
||||
--puppeteerConfigFile "$PUPPETEER_CFG" \
|
||||
-s 2 -b transparent \
|
||||
--input "$mmd" \
|
||||
--output "$png" 2>&1 | grep -v "^$" || true
|
||||
done
|
||||
@@ -61,13 +63,14 @@ fi
|
||||
echo ""
|
||||
|
||||
# --- Step 2: render Marp deck (S&P-themed) ---
|
||||
# REQ-257: pinned marp-cli version (v4.5.0) to prevent boilerplate-CSS drift.
|
||||
echo "=== Step 2: Rendering Marp deck → HTML + PPTX ==="
|
||||
echo " Theme: $THEME_CSS"
|
||||
echo " HTML → $HTML"
|
||||
npx --yes @marp-team/marp-cli@latest --allow-local-files --theme "$THEME_CSS" "$SRC" -o "$HTML" 2>&1 | tail -3
|
||||
npx --yes @marp-team/marp-cli@4.5.0 --allow-local-files --theme "$THEME_CSS" "$SRC" -o "$HTML" 2>&1 | tail -3
|
||||
|
||||
echo " PPTX → $PPTX"
|
||||
npx --yes @marp-team/marp-cli@latest --allow-local-files --theme "$THEME_CSS" "$SRC" -o "$PPTX" 2>&1 | tail -3
|
||||
npx --yes @marp-team/marp-cli@4.5.0 --allow-local-files --theme "$THEME_CSS" "$SRC" -o "$PPTX" 2>&1 | tail -3
|
||||
echo ""
|
||||
|
||||
# --- Step 3: stage ---
|
||||
|
||||
@@ -117,7 +117,6 @@ EXCLUDE_SCRIPTS=(
|
||||
sync_workflows.py
|
||||
attach_release_asset.py
|
||||
check_north_star_diff.sh
|
||||
render_deck.sh
|
||||
render_slides.sh
|
||||
)
|
||||
|
||||
|
||||
@@ -40,7 +40,7 @@ _EXCLUDE_SCRIPTS = {
|
||||
"untag_acdl_keys.py", "seed_uptime_monitors.py",
|
||||
"push_consumer_image.py", "sync_workflows.py",
|
||||
"attach_release_asset.py", "check_north_star_diff.sh",
|
||||
"render_deck.sh", "render_slides.sh",
|
||||
"render_slides.sh",
|
||||
}
|
||||
|
||||
# Synced top-level files (not in any excluded dir).
|
||||
|
||||
@@ -13,7 +13,7 @@ v1.21 adds (REQ-245,251,252):
|
||||
- Deck renamed to nova-autonomous-cloud-delivery*
|
||||
- No maturity badges in the Marp deck
|
||||
- No version in the Marp footer/title slide
|
||||
- 18 main + 1 appendix slides
|
||||
- 20 main + 1 appendix slides (v1.22 split slides 3+8 to relieve overflow)
|
||||
- No D-###/REQ-###/internal .py paths in audience-facing slides
|
||||
- Title is "Nova — The Autonomous Cloud Delivery Platform"
|
||||
"""
|
||||
@@ -202,7 +202,9 @@ def test_marp_deck_title_is_autonomous_cloud_delivery():
|
||||
|
||||
|
||||
def test_marp_deck_slide_count():
|
||||
"""REQ-245: 18 main slides + 1 appendix = 19 slides total."""
|
||||
"""REQ-245/261: 20 main slides + 1 appendix = 21 slides total.
|
||||
v1.22 split slides 3 (Objectives+Anti-Goals) and 8 (Attestation
|
||||
Matrix) to relieve overflow, increasing the count from 18 to 20."""
|
||||
text = MARP_DECK.read_text()
|
||||
# Count slide separators: each slide ends with --- (except the last)
|
||||
# The frontmatter is one --- ... --- block, then each slide is separated by ---
|
||||
@@ -210,8 +212,8 @@ def test_marp_deck_slide_count():
|
||||
slide_headings = re.findall(r"^## (?:Slide|Appendix) ", text, re.MULTILINE)
|
||||
main_slides = re.findall(r"^## Slide ", text, re.MULTILINE)
|
||||
appendix_slides = re.findall(r"^## Appendix ", text, re.MULTILINE)
|
||||
assert len(main_slides) == 18, \
|
||||
f"expected 18 main slides, found {len(main_slides)}: {slide_headings}"
|
||||
assert len(main_slides) == 20, \
|
||||
f"expected 20 main slides, found {len(main_slides)}: {slide_headings}"
|
||||
assert len(appendix_slides) == 1, \
|
||||
f"expected 1 appendix slide, found {len(appendix_slides)}"
|
||||
|
||||
@@ -265,4 +267,107 @@ def test_source_md_no_badges():
|
||||
"""REQ-252: no maturity badges in the source-of-truth markdown."""
|
||||
text = SOURCE_MD.read_text()
|
||||
assert "badge" not in text.lower(), \
|
||||
"Source markdown still contains badge spans"
|
||||
"Source markdown still contains badge spans"
|
||||
|
||||
|
||||
# --- v1.22 layout/aspect-ratio/theme-structural tests (REQ-262) ---
|
||||
|
||||
def test_theme_css_has_section_padding():
|
||||
"""REQ-254: theme CSS has a section padding rule (root cause fix)."""
|
||||
css = THEME_CSS.read_text()
|
||||
assert "padding:" in css, "theme CSS has no padding rule"
|
||||
# The section rule must have padding (not just table/td padding)
|
||||
assert re.search(r"section\s*\{[^}]*padding:", css, re.DOTALL), \
|
||||
"theme CSS has no padding on the section rule"
|
||||
|
||||
|
||||
def test_theme_css_suppresses_title_chrome():
|
||||
"""REQ-256: title slides suppress header/footer chrome."""
|
||||
css = THEME_CSS.read_text()
|
||||
assert "section.title header" in css, \
|
||||
"theme CSS does not suppress title-slide header"
|
||||
assert "section.title footer" in css, \
|
||||
"theme CSS does not suppress title-slide footer"
|
||||
assert "display: none" in css, \
|
||||
"theme CSS does not set display:none on title chrome"
|
||||
|
||||
|
||||
def test_theme_css_has_aspect_ratio_aware_images():
|
||||
"""REQ-255: image rules use object-fit + max-width (not blunt max-height only)."""
|
||||
css = THEME_CSS.read_text()
|
||||
assert "object-fit" in css, \
|
||||
"theme CSS does not use object-fit for images"
|
||||
assert "max-width" in css, \
|
||||
"theme CSS does not set max-width for images"
|
||||
|
||||
|
||||
def test_png_aspect_ratios_sane():
|
||||
"""REQ-259/260: PNGs referenced in the marp deck have aspect ratios
|
||||
in [0.4, 4.0] (suitable for 16:9 slides with img.tall/img.wide classes).
|
||||
Only checks PNGs actually referenced in the current marp deck —
|
||||
legacy/unused PNGs are not checked (GRILL revision 1)."""
|
||||
import struct
|
||||
deck_text = MARP_DECK.read_text()
|
||||
# Extract all referenced PNG paths: 
|
||||
referenced = re.findall(r'!\[[^\]]*\]\(assets/png/([^)]+\.png)\)', deck_text)
|
||||
assert referenced, "no PNGs referenced in the marp deck"
|
||||
for png_name in referenced:
|
||||
png_path = ASSETS / "png" / png_name
|
||||
assert png_path.is_file(), f"referenced PNG not found: {png_name}"
|
||||
with open(png_path, "rb") as fh:
|
||||
data = fh.read(24)
|
||||
assert data[:8] == b"\x89PNG\r\n\x1a\n", f"{png_name} is not a PNG"
|
||||
w = struct.unpack(">I", data[16:20])[0]
|
||||
h = struct.unpack(">I", data[20:24])[0]
|
||||
ar = w / h
|
||||
assert 0.4 <= ar <= 4.0, \
|
||||
f"{png_name} aspect ratio {ar:.2f} outside [0.4, 4.0] ({w}x{h})"
|
||||
|
||||
|
||||
def test_render_slides_has_2x_scale():
|
||||
"""REQ-258: render_slides.sh uses -s 2 (2x scale) and -b transparent."""
|
||||
text = RENDER_SCRIPT.read_text()
|
||||
assert "-s 2" in text, "render_slides.sh does not use -s 2 (2x scale)"
|
||||
assert "-b transparent" in text, \
|
||||
"render_slides.sh does not use -b transparent"
|
||||
|
||||
|
||||
def test_render_slides_pins_cli_versions():
|
||||
"""REQ-257: render_slides.sh pins marp-cli and mermaid-cli versions
|
||||
(no @latest)."""
|
||||
text = RENDER_SCRIPT.read_text()
|
||||
assert "marp-cli@" in text, "render_slides.sh does not pin marp-cli"
|
||||
assert "mermaid-cli@" in text, \
|
||||
"render_slides.sh does not pin mermaid-cli"
|
||||
assert "@latest" not in text, \
|
||||
"render_slides.sh still uses @latest (not pinned)"
|
||||
|
||||
|
||||
def test_render_deck_removed():
|
||||
"""REQ-257: render_deck.sh has been deleted (produced unthemed output)."""
|
||||
old_script = ROOT / "scripts" / "render_deck.sh"
|
||||
assert not old_script.exists(), \
|
||||
"render_deck.sh still exists (should be deleted — produced unthemed output)"
|
||||
|
||||
|
||||
def test_html_embeds_theme():
|
||||
"""REQ-262: the committed HTML embeds the S&P theme (--sp-red + padding
|
||||
in the inline <style> block)."""
|
||||
html = (PRESENTATIONS / "nova-autonomous-cloud-delivery.html").read_text()
|
||||
assert "--sp-red" in html, "committed HTML does not embed --sp-red"
|
||||
assert "padding:" in html, "committed HTML does not embed padding rule"
|
||||
|
||||
|
||||
def test_html_slide_count_matches_marp():
|
||||
"""REQ-262: the committed HTML <section> count matches the marp deck
|
||||
slide count (title + 20 main + 1 appendix = 22)."""
|
||||
html = (PRESENTATIONS / "nova-autonomous-cloud-delivery.html").read_text()
|
||||
section_count = html.count("<section ")
|
||||
deck_text = MARP_DECK.read_text()
|
||||
main_slides = len(re.findall(r"^## Slide ", deck_text, re.MULTILINE))
|
||||
appendix_slides = len(re.findall(r"^## Appendix ", deck_text, re.MULTILINE))
|
||||
# +1 for the title slide (which is an H1, not "## Slide")
|
||||
expected = main_slides + appendix_slides + 1
|
||||
assert section_count == expected, \
|
||||
f"HTML has {section_count} sections, expected {expected} " \
|
||||
f"({main_slides} main + {appendix_slides} appendix + 1 title)"
|
||||
Reference in New Issue
Block a user