Jon Chery
6b410d9ab4
docs(P02): fix stale phase-status + wire STATE.md into ship discipline
...
P2 W1: PROJECT.md v1.26 phase-status block (lines 428-438):
- P3/P4/P5 'pending' → 'complete' with shipped tags (v1.25.3/4/5)
- v1.26 Overview marked shipped (merged to main 2026-08-19)
- Added STATE.md pointer to Capability Status section header
- Updated CAPABILITY_INVENTORY.md refs → archive/CAPABILITY_INVENTORY-v1.10.md
P2 W2: ROADMAP.md v1.26 section:
- P3/P4/P5 'planned' → 'complete' with shipped tags
- v1.26 Overview '(active, ...)' → '(complete, tag v1.25.5, merged to main)'
- Added STATE.md to v1.25 + v1.26 P5 'Updated at ship' lists
P2 W3: Wired STATE.md into ship discipline:
- PLAN.md: added 'Durable convention (v1.27 establishes)' section —
every future P-final Wave 3 file-update list includes STATE.md
(append new capability rows, mark deprecations, bump 'Last
milestone ship' header).
- NORTH_STAR.md: added 'Relationship to engineering files (v1.27
update)' section — STATE.md is the *what exists* catalog (PO-owned,
additive); NORTH_STAR is the *why*; ARCHITECTURE the *how*;
CHECKPOINT the *now*.
P2 W4: archive README + consumer PROJECT pointer:
- archive/README.md: added 'v1.27 compression — archived files (8
files, lossless git mv)' section with 3 tables (3 superseded refs +
4 v1.26 verifications/review/evidence + 1 consumer) + a note on the
v1.26 pre-execution artifacts (in git history, not on disk).
Updated 'Why archive' to record both compressions (v1.26 P2 +
v1.27 P1).
- nova-blockchain-exchange/PROJECT.md: added phase-by-phase history
pointer to platform ROADMAP §v1.26 (consumer ROADMAP archived).
P2 W5: Fixed remaining dangling references to archived files:
- ARCHITECTURE.md §12.8 line 566: P4-PILOT-RUN-EVIDENCE.md → archive/
- nova-blockchain-exchange/README.md (3 refs): P4-PILOT-RUN-EVIDENCE.md
→ archive/P4-PILOT-RUN-EVIDENCE-v1.26.md
- IAM_POLICY.md (2 refs): CAPABILITY_INVENTORY.md → archive/
Verified: 0 active dangling references remaining (grep confirms all
matches are in archive/ or v1.27 P0 records describing the archive).
---ci---
project: acdl
phase: 2
milestone: v1.27
status: execute
wave: W6
---ci---
2026-08-19 19:16:43 +00:00
Jon Chery
be967783b4
docs(milestone): complete v1.25 — kyverno-json Unified Policy Engine
...
acdl-ci / Lint (push) Successful in 11s
acdl-ci / Platform check-only (offline) (push) Successful in 26s
acdl-ci / Test (push) Failing after 43s
19 requirements (REQ-291..309) complete. 6 phases (P0 + P1..P4 + P5).
Tag v1.24.5 (gitea release id 645, the v1.25 milestone release).
Merged milestone/v1.25-kyverno-json to main. All milestone branches deleted.
NORTH_STAR.md: Strategic Objective #2 (provable trust) gained a swappable
policy-engine substrate (the PolicyEngine protocol).
---ci---
project: acdl
milestone: v1.25
status: complete
requirements:
covered: [REQ-291, REQ-292, REQ-293, REQ-294, REQ-295, REQ-296, REQ-297, REQ-298, REQ-299, REQ-300, REQ-301, REQ-302, REQ-303, REQ-304, REQ-305, REQ-306, REQ-307, REQ-308, REQ-309]
partial: []
---/ci---
2026-08-12 18:50:45 +00:00
Jon Chery
9bc37301ba
docs(P4): trim word count + purge 'penetrate' repo-wide (REQ-271,272)
...
Targeted ~20-30% word-count trim on 8 verbose slides (1, 5, 7, 8, 13,
14, 20, appendix). Tables + short slides untouched. Spirit preserved.
Removed 'penetrate' (and derivatives) from docs/scope.md, docs/vision.md,
.ciagent/PROJECT.md, .ciagent/CLARIFY.md, .ciagent/NORTH_STAR.md, and
presentation files (G-001 binding revision). RESEARCH.md/PLAN.md/GRILL.md
exempt as decision-history. Slide 5 'penetrates' phrase removed with no
replacement (slide 4 Anti-Goals already excludes the PDLC).
---ci---
project: acdl
phase: 4
milestone: v1.23
status: execute
phase_role: execution
---/ci---
2026-08-12 00:26:37 +00:00
Jon Chery
e7866fda84
docs(P1): strategic docs — thesis rename + NORTH_STAR objectives + RACI restructure
...
Nova Slides Render / render (push) Failing after 1m4s
AUTONOMY_THESIS.md (git mv from NO_HUMANS_THESIS.md): reframe from
'removing humans' to 'autonomy in operations, human at stage gates'.
Drop D-### citations + internal file paths; keep anti-claims, reworded.
Anti-claim #1 now: 'decisions are NOT made by an LLM — deterministic
scripts calculate a score; the platform functions without AI'.
NORTH_STAR.md:
- Vision: 'invisible' → 'visible' (operations become visible — recurring
theme); polish for technical audience (security, remediation velocity,
reliability, lead time).
- Objective #2 : 'provable trust in AI decisions' → 'provable trust in
automated decisions' (deterministic scripts calculate a score;
platform functions without AI).
- Objective #3 : four CTO-grade metrics (Lead Time PR→Prod, Infra Vuln
Count trend, MTTR, Cloud Spend Reduction) → all flow into PowerBI.
- Objective #4 : 'default substrate for agentic consumption' → integrate
with externally owned PDLC/SDLC/Agentic/Citizen Developer platforms
regardless of source; Nova provides skills + MCP endpoints; all prod
intents go through the same controls + quality gates.
- Anti-goals: drop #1 (hyperscaler competitor), #4 (legacy untagged),
#5 (sold to operators). Add: 'not an upstream development platform',
'not a replacement for the PDLC'. Reword #3 (no 'removes humans').
docs/raci.md: 3 roles → 4 roles. Add Quality Engineering column. Rename
Release Management → SRE. Split release attestation into Quality
attestation (QA) + Production readiness (SRE). Platform no longer holds
A for attestation — reassigned to QE/SRE.
docs/scope.md: add integration framing (skills + MCP endpoints, all
sources go through same controls).
Render scripts: default deck name → nova-autonomous-cloud-delivery.
ONBOARDING + terraform/onboarding: 'no-humans' → 'autonomous'.
---ci---
project: acdl
phase: 1
milestone: v1.21
status: execute
phase_role: execution
---/ci---
2026-08-11 13:55:53 +00:00
Jon Chery
97560e3c88
docs(grill): v1.17 binding decisions applied — 12 fixes (NORTH_STAR reclassification + deck plan rewrites)
...
NORTH_STAR-CHANGE: reclassify 3 targets to Post-Pilot section (E-003);
move AI-Agent Intent Share to Future Horizons (E-004).
GRILL binding decisions applied:
- G-Q4: D-122 honesty sentence on slide 7 (Nova's AI = confidence-gated policy engine, not LLM)
- G-Q5/G-Q15: derived metrics annotated with N=0 caveat; ROI formula shown inline on slide 13
- G-Q6: NORTH_STAR targets reclassified (3 to Post-Pilot, honesty note added)
- G-Q8: stake line (18V+0 consumers) added to slide 1
- G-Q9: 4 filler benefit closes rewritten (slides 1, 4, 13, 16)
- G-Q10: slide 12 split into Zero-Touch Efficiency + Cost & ROI (deck now 18 slides)
- G-Q11: preempt added to slide 14 (deferrals are measurement infra, not autonomy)
- G-Q13: Act 3->4 transition rewritten ('how it works' is not 'proof it works')
- G-Q14: slide 9 benefit reframed from data plumbing to trust substrate
- G-Q16: slide 16 ask reframed as business decision (approve pilot + ledger build-out)
---ci---
project: acdl
phase: 0
milestone: v1.17
status: grill
---/ci---
2026-08-04 19:44:28 +00:00
Jon Chery
f55579bea8
docs(P00): clarify — validation pass, tighten attestation wording (REQ-191/194)
...
CLARIFY validation complete. 14 decisions (D-120..D-132) locked.
4 low-severity items deferred to PLAN. No blocking ambiguities.
- Attestation Coverage canonical owner = REQ-194 (compliance)
- REQ-191 excludes Attestation Coverage (cross-ref to REQ-194)
- NORTH_STAR success criteria #1 : distinguish event completeness (qa/prod/dr) from coverage metric (prod/dr)
---ci---
project: acdl
phase: 0
milestone: v1.17
status: clarify
---/ci---
2026-08-04 19:10:52 +00:00
Jon Chery
7fc646d773
docs(init): validate specification — v1.17 Strategic Direction, Leadership Metrics & Unified Story
...
---ci---
project: acdl
phase: 0
milestone: v1.17
status: specify
---/ci---
2026-08-04 19:08:31 +00:00