docs(grill): v1.17 binding decisions applied — 12 fixes (NORTH_STAR reclassification + deck plan rewrites)
NORTH_STAR-CHANGE: reclassify 3 targets to Post-Pilot section (E-003);
move AI-Agent Intent Share to Future Horizons (E-004).
GRILL binding decisions applied:
- G-Q4: D-122 honesty sentence on slide 7 (Nova's AI = confidence-gated policy engine, not LLM)
- G-Q5/G-Q15: derived metrics annotated with N=0 caveat; ROI formula shown inline on slide 13
- G-Q6: NORTH_STAR targets reclassified (3 to Post-Pilot, honesty note added)
- G-Q8: stake line (18V+0 consumers) added to slide 1
- G-Q9: 4 filler benefit closes rewritten (slides 1, 4, 13, 16)
- G-Q10: slide 12 split into Zero-Touch Efficiency + Cost & ROI (deck now 18 slides)
- G-Q11: preempt added to slide 14 (deferrals are measurement infra, not autonomy)
- G-Q13: Act 3->4 transition rewritten ('how it works' is not 'proof it works')
- G-Q14: slide 9 benefit reframed from data plumbing to trust substrate
- G-Q16: slide 16 ask reframed as business decision (approve pilot + ledger build-out)
---ci---
project: acdl
phase: 0
milestone: v1.17
status: grill
---/ci---
This commit is contained in:
@@ -1,12 +1,12 @@
|
||||
{
|
||||
"phase": 0,
|
||||
"stage": "plan",
|
||||
"stage": "grill",
|
||||
"milestone": "v1.17",
|
||||
"phase_role": "pre_execution",
|
||||
"attempts": 0,
|
||||
"updated_at": "2026-08-04T20:45:00Z",
|
||||
"updated_at": "2026-08-04T21:15:00Z",
|
||||
"milestone_complete": false,
|
||||
"tag": null,
|
||||
"requirements": ["REQ-185"],
|
||||
"notes": "PLAN complete. 8 phases (P1..P7 + P8 final), 4 waves. Deck rebuild plan: 15 main + 2 appendix slides, 5-act arc, per-slide benefit callouts, fluid transitions. 29 requirements (REQ-185..213) covered. Wave dependency graph + critical path documented."
|
||||
"notes": "GRILL complete (interactive). 12 binding decisions applied: NORTH_STAR targets reclassified (E-003: 3 targets to Post-Pilot section; E-004: AI-Agent Intent Share to Future Horizons). Deck plan updated: slide 1 stake line (G-Q8), slide 4 benefit rewrite (G-Q9), slide 7 D-122 honesty sentence (G-Q4), Act 3->4 transition rewrite (G-Q13), slide 9 benefit reframe (G-Q14), slide 12 split into 12+13 (G-Q10), ROI formula inline + N=0 caveat (G-Q5/G-Q15), slide 14 preempt (G-Q11), slide 16 ask reframed as business decision (G-Q16). Deck now 16 main + 2 appendix = 18 slides."
|
||||
}
|
||||
+36
-8
@@ -112,25 +112,53 @@ Targets are committed, not aspirational. Each is a number a board member
|
||||
can repeat back to us. The grounding column records whether the metric is
|
||||
measurable this milestone, and if not, what blocks it.
|
||||
|
||||
> **Honesty note (GRILL G-Q6 binding):** Nova has 0 consumer adoption
|
||||
> today (`PROJECT.md:495`). Three targets (Touchless Resolution, Human
|
||||
> Escalation, AI Decision Accuracy) are scoped "across production
|
||||
> estates" — the measurement *pipeline* is grounded this milestone, but
|
||||
> the *denominator* is zero until a pilot estate activates. These
|
||||
> targets are reclassified as **Post-Pilot** (the pipeline works; the
|
||||
> numbers fill when consumers exist). This is the same honesty model as
|
||||
> Cloud Spend Reduction (partial: pipeline grounded, actuals deferred).
|
||||
|
||||
### Current-milestone targets (grounded or derived this milestone)
|
||||
|
||||
| Domain | Target | Grounding (v1.17) | Note |
|
||||
|---|---|---|---|
|
||||
| **Touchless Resolution Rate** | ≥ 99% across production estates | grounded (after P1) | runs completing without *operational* HITL block ÷ total runs (attestation gates excluded — they're designed controls, not escalations) |
|
||||
| **Human Escalation Frequency** | < 0.1% of platform actions | grounded (after P1) | *operational* HITL blocks only (confidence-driven); attestation sign-offs excluded |
|
||||
| **MTTR (p95)** | < 60 seconds | grounded (platform-run MTTR) | apply.failed → successful retry; infra-incident MTTR deferred (no incident detection) |
|
||||
| **Predictive vs. Reactive Ratio** | ≥ 3 : 1 (prevention dominates reaction) | deferred | requires ML forecasting service (future emitter) |
|
||||
| **AI Decision Accuracy** | ≥ 99.5% (no rollback, no follow-up incident within 5 min of action) | grounded (after decision ledger) | decisions not followed by apply.failed/incident within 5min |
|
||||
| **Drift Auto-Reversal Rate** | ≥ 95% within one detection cycle | deferred | requires drift detection (D-096 + scheduler) |
|
||||
| **Cloud Spend Reduction** | ≥ 25% on pilot estates vs. 12-month pre-Nova baseline | partial | pre-apply estimate grounded (Infracost); actual-spend deferred (D-096 CUR) |
|
||||
| **L1 / L2 Ops Hours Avoided** | ≥ 70% of pre-Nova FTE allocation | derived | formula over run count × manual baseline |
|
||||
| **Platform ROI** | ≥ 250% measured annually | derived | formula (labor savings + cloud savings + avoided downtime) ÷ platform op cost |
|
||||
| **L1 / L2 Ops Hours Avoided** | ≥ 70% of pre-Nova FTE allocation | derived | formula over run count × manual baseline (computed on N internal runs; production-denominator activates post-pilot) |
|
||||
| **Platform ROI** | ≥ 250% measured annually | derived | formula (labor savings + cloud savings + avoided downtime) ÷ platform op cost (computed on N internal runs; production-denominator activates post-pilot) |
|
||||
| **Decision Ledger Coverage** | 100% of AI actions with backfilled outcome | grounded (this milestone builds it) | outbox_writer.py → SQLite hash-chain |
|
||||
| **Attestation Coverage** | 100% of prod/dr promotions attested by a human | grounded | hitl_gates.py + outbox approver_* attributes; separation-of-duties on prod |
|
||||
| **AI-Agent Intent Share** | ≥ 40% of total intent volume originated by non-human consumers | future | no AI-agent consumers today; no emitter; placeholder view |
|
||||
|
||||
### Post-Pilot targets (pipeline grounded this milestone; denominator activates when a pilot estate runs)
|
||||
|
||||
| Domain | Target | Grounding (v1.17) | Note |
|
||||
|---|---|---|---|
|
||||
| **Touchless Resolution Rate** | ≥ 99% across production estates | partial (pipeline grounded; denominator = 0 today) | runs completing without *operational* HITL block ÷ total runs (attestation gates excluded); activates post-pilot |
|
||||
| **Human Escalation Frequency** | < 0.1% of platform actions | partial (pipeline grounded; denominator = 0 today) | *operational* HITL blocks only (confidence-driven); attestation sign-offs excluded; activates post-pilot |
|
||||
| **AI Decision Accuracy** | ≥ 99.5% (no rollback, no follow-up incident within 5 min of action) | partial (pipeline grounded; denominator = 0 today) | decisions not followed by apply.failed/incident within 5min; activates post-pilot |
|
||||
|
||||
### Deferred targets (measurement requires future systems)
|
||||
|
||||
| Domain | Target | Grounding (v1.17) | Note |
|
||||
|---|---|---|---|
|
||||
| **Predictive vs. Reactive Ratio** | ≥ 3 : 1 (prevention dominates reaction) | deferred | requires ML forecasting service (future emitter) |
|
||||
| **Drift Auto-Reversal Rate** | ≥ 95% within one detection cycle | deferred | requires drift detection (D-096 + scheduler) |
|
||||
|
||||
> Committed targets whose measurement is deferred remain committed — the
|
||||
> target is the destination; the metric is the odometer, and some
|
||||
> odometers aren't built yet. Each deferred metric ships as a placeholder
|
||||
> PowerBI view + a definition-of-success doc recording the dependency.
|
||||
> Post-Pilot targets are committed targets whose measurement pipeline is
|
||||
> grounded this milestone; the numbers activate when a pilot estate runs.
|
||||
|
||||
### Future Horizons (strategic direction, not committed targets)
|
||||
|
||||
| Domain | Aspiration | Note |
|
||||
|---|---|---|
|
||||
| **AI-Agent Intent Share** | ≥ 40% of total intent volume originated by non-human consumers | Strategic Objective #4 direction. No backing requirement, no placeholder view, no emitter today. Moves to a committed target when agentic consumption is real. |
|
||||
|
||||
---
|
||||
|
||||
|
||||
+114
-46
@@ -724,7 +724,7 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
|
||||
| Level | "What I'm going to tell you" | "Tell them" | "What I told you" |
|
||||
|-------|------------------------------|-------------|-------------------|
|
||||
| **Deck** | Slide 1 (arc preview: Problem→Vision→How→Proof→Roadmap) | Slides 2–14 (the 5 acts) | Slide 15 (recap of 5 acts + the ask) |
|
||||
| **Deck** | Slide 1 (arc preview: Problem→Vision→How→Proof→Roadmap; with 18V+0-consumer stake line) | Slides 2–15 (the 5 acts, 14 slides) | Slide 16 (recap of 5 acts + the business-decision ask) |
|
||||
| **Per slide** | Opening line: "This slide shows X" | Body: bullets/diagram/table | Closing line: "Benefit: you now know Y" |
|
||||
|
||||
### Act 1 — Problem (2 slides)
|
||||
@@ -735,11 +735,16 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
**Slide 1 — Arc Preview (the "what I'm going to tell you" deck-level opening)**
|
||||
- *Opens:* "This deck proves Nova is the no-humans infrastructure platform —
|
||||
and shows you the metrics that make the claim defensible."
|
||||
- *Stake line (G-Q8 binding):* "Today: 18 capabilities verified, 0 consumer
|
||||
estates in production. This deck shows what's proven, what's pipeline-ready,
|
||||
and what's honestly deferred."
|
||||
- *Delivers:* The 5-act arc as a visual roadmap: Problem → Vision → How →
|
||||
Proof → Roadmap. One-line summary per act.
|
||||
- *Closes:* "Benefit: you now know the arc — the next 14 slides deliver
|
||||
each act in turn."
|
||||
- *Grounded metrics cited:* none (this is the preview).
|
||||
- *Closes:* "Benefit: you leave this deck knowing which claims are proven
|
||||
today, which are pipeline-ready, and which are deferred with a documented
|
||||
unblock path — no marketing, just grounded evidence."
|
||||
- *Grounded metrics cited:* 18 Verified + 4 Skipped (source:
|
||||
`REGRESSION_REPORT.json`); 0 consumers (source: `PROJECT.md:495`).
|
||||
- *Deferred metrics:* none.
|
||||
|
||||
**Slide 2 — The No-Humans Imperative**
|
||||
@@ -783,12 +788,14 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
anti-goals (not a hyperscaler competitor, not a general AI platform, not
|
||||
removing humans from accountability, not for legacy infra, not sold to
|
||||
operators). From `NORTH_STAR.md`.
|
||||
- *Closes:* "Benefit: you now know the scope boundaries — what Nova is,
|
||||
and what it refuses to be."
|
||||
- *Closes:* "Benefit: you now know the scope boundaries — Nova is
|
||||
purpose-built for infrastructure operations, sold to leadership on
|
||||
outcomes, and explicitly not a general-purpose AI platform or a
|
||||
hyperscaler competitor."
|
||||
- *Grounded metrics cited:* none (direction).
|
||||
- *Deferred metrics:* none.
|
||||
- *Transition:* "The objectives are committed to measurable targets —
|
||||
here is the 12–18 month scorecard."
|
||||
here is the 12–18 month scorecard, with honest grounding status."
|
||||
|
||||
**Slide 5 — 12–18 Month Targets (the scorecard)**
|
||||
- *Opens:* "This slide shows the committed targets — numbers a board
|
||||
@@ -841,8 +848,14 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
from `apply.completed`. `attestation.recorded` events for qa/prod/dr.
|
||||
D-121, D-122, D-132. Honors D-083 (no S3 Object Lock/JWS — local
|
||||
hash-chain this milestone).
|
||||
- **D-122 honesty sentence (G-Q4 binding):** "Nova's 'AI' is the
|
||||
confidence-gated policy engine (confidence_signal + HITL gate), not
|
||||
an LLM planner. The Decision Ledger captures this real decision path —
|
||||
not a fabricated 'AI agent' that doesn't exist yet."
|
||||
- *Closes:* "Benefit: you now know why 'autonomous' is defensible — every
|
||||
decision is immutable, queryable, and accountable."
|
||||
decision is immutable, queryable, and accountable. And you know exactly
|
||||
what 'AI' means here: a confidence-gated policy engine, not a black-box
|
||||
LLM."
|
||||
- *Grounded metrics cited:* Decision Ledger Coverage 100% (source:
|
||||
`core/metrics/decision_ledger.py` + `metrics/decision_ledger.db`).
|
||||
- *Deferred metrics marked Planned:* Tamper-Evident Ledger Checkpoints
|
||||
@@ -863,9 +876,13 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
- *Grounded metrics cited:* Attestation Coverage 100% (source:
|
||||
`core/hitl_gates.py` + outbox `approver_*` attributes).
|
||||
- *Deferred metrics:* none.
|
||||
- *Transition:* "The platform is built — here is the proof that it works."
|
||||
- *Transition into Act 4 (G-Q13 binding — rewritten):* "You've now seen
|
||||
how Nova works — the pipeline, the Decision Ledger, the attestation
|
||||
gates. But 'how it works' is not 'proof it works.' The next four slides
|
||||
show the measured evidence: capability health, trust metrics, efficiency,
|
||||
and cost — every number grounded in a real file, not a marketing claim."
|
||||
|
||||
**Slide 9 — Telemetry Architecture**
|
||||
**Slide 9 — Telemetry Architecture (G-Q14 binding — benefit reframed from data plumbing to trust)**
|
||||
- *Opens:* "This slide shows how Nova instruments itself — the
|
||||
CloudEvents envelope, the cold store, and the PowerBI export."
|
||||
- *Delivers:* The telemetry architecture diagram (from ARCHITECTURE.md
|
||||
@@ -874,8 +891,10 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
→ collector → `metrics/nova_metrics.db` (SQLite cold store) →
|
||||
`metrics/powerbi/` (CSV/JSON views) → PowerBI. D-120 (Nova-native),
|
||||
D-125 (hybrid events/files), D-126 (cold-only).
|
||||
- *Closes:* "Benefit: you now know the metrics pipeline — every signal is
|
||||
grounded in a real file, not fabricated."
|
||||
- *Closes:* "Benefit: you now know that every metric in this deck is
|
||||
traceable to a real emitted event — the architecture IS the trust
|
||||
substrate. When a CFO asks 'where does this number come from?', the
|
||||
answer is a file path, not a Slack thread."
|
||||
- *Grounded metrics cited:* none (architecture).
|
||||
- *Deferred metrics marked Planned:* Hot-path (live ops dashboard) — D-126.
|
||||
- *Transition into Act 4:* "The architecture is sound — here is the
|
||||
@@ -922,29 +941,58 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
- *Transition:* "Trust is provable — here is the operational efficiency
|
||||
that makes the ROI real."
|
||||
|
||||
**Slide 12 — Zero-Touch Efficiency + Cost**
|
||||
- *Opens:* "This slide shows the efficiency metrics — touchless resolution,
|
||||
human escalation, and cost estimates."
|
||||
**Slide 12 — Zero-Touch Efficiency (G-Q10 binding — split from old slide 12)**
|
||||
- *Opens:* "This slide shows the zero-touch efficiency metrics —
|
||||
touchless resolution, human escalation, and MTTR."
|
||||
- *Delivers:* Touchless Resolution Rate (runs without operational HITL
|
||||
block ÷ total; attestation gates excluded). Human Escalation Frequency
|
||||
(operational HITL blocks only). MTTR (platform-run: apply.failed →
|
||||
successful retry, D-131). Cost Estimates via Infracost (pre-apply,
|
||||
grounded). FTE Hours Saved (derived). Platform ROI (derived formula).
|
||||
The grounded/derived/deferred honesty model.
|
||||
- *Closes:* "Benefit: you now know the ROI is quantifiable — each quarter
|
||||
on Nova must reduce spend, free hours, and avoid downtime measurably."
|
||||
successful retry, D-131). **Post-Pilot caveat (G-Q5 binding):** these
|
||||
three metrics are computed on N internal runs today; the
|
||||
production-denominator activates when a pilot estate runs (see
|
||||
NORTH_STAR Post-Pilot Targets section).
|
||||
- *Closes:* "Benefit: you now know the zero-touch efficiency is
|
||||
measurable — the pipeline works today on internal runs, and the
|
||||
denominator expands to production estates when a pilot activates."
|
||||
- *Grounded metrics cited:* Touchless Resolution Rate, Human Escalation
|
||||
Frequency, MTTR, Cost Estimates (source: `metrics/nova_metrics.db`
|
||||
`fact_run` + `fact_cost_estimate`).
|
||||
- *Derived metrics:* FTE Hours Saved, Platform ROI.
|
||||
Frequency, MTTR (source: `metrics/nova_metrics.db` `fact_run`).
|
||||
- *Derived metrics:* none on this slide.
|
||||
- *Deferred metrics marked Planned:* Self-Healing Velocity (no
|
||||
auto-remediator).
|
||||
- *Transition:* "Efficiency is half the ROI story — here is the cost
|
||||
side."
|
||||
|
||||
**Slide 13 — Cost & ROI (G-Q10 binding — split from old slide 12; G-Q15 binding — formula inline + N=0 caveat)**
|
||||
- *Opens:* "This slide shows the cost estimates and the ROI formula —
|
||||
with honest caveats about the current denominator."
|
||||
- *Delivers:* Cost Estimates via Infracost (pre-apply, grounded).
|
||||
**ROI formula shown inline (G-Q15 binding):** `Platform ROI = (FTE
|
||||
hours saved × blended rate + cloud savings + avoided downtime) ÷
|
||||
platform op cost`. **N=0 caveat (G-Q5/G-Q15 binding):** "These
|
||||
derived metrics are computed on N internal runs today; the
|
||||
production-denominator activates post-pilot. The formula is grounded;
|
||||
the production numbers are not yet." FTE Hours Saved (derived). Platform
|
||||
ROI (derived formula). The grounded/derived/deferred honesty model.
|
||||
- *Closes:* "Benefit: you now know the ROI formula — and you know it's
|
||||
computed on internal runs today, not fabricated production numbers.
|
||||
The formula is ready; the production denominator activates with a
|
||||
pilot."
|
||||
- *Grounded metrics cited:* Cost Estimates (source:
|
||||
`metrics/nova_metrics.db` `fact_cost_estimate`).
|
||||
- *Derived metrics:* FTE Hours Saved, Platform ROI (formula shown inline).
|
||||
- *Deferred metrics marked Planned:* Live CUR Reconciliation (D-096),
|
||||
Drift Auto-Reversal (D-096).
|
||||
- *Transition:* "The proof is grounded — here is what is honestly
|
||||
deferred."
|
||||
|
||||
**Slide 13 — What's Deferred — and Why**
|
||||
**Slide 14 — What's Deferred — and Why (G-Q11 binding — preempt: deferrals are measurement infra, not whether the platform runs without humans)**
|
||||
- *Opens:* "This slide pairs each deferred metric with its blocking
|
||||
decision — honesty about what isn't measured yet."
|
||||
- **Preempt (G-Q11 binding):** "To be clear: these deferrals are
|
||||
*measurement infrastructure*, not whether the platform runs without
|
||||
humans. The platform IS autonomous in operations. What's deferred is
|
||||
the *evidence pipeline* for certain metrics (live infra health, drift
|
||||
detection, predictive remediation) — not the autonomy itself."
|
||||
- *Delivers:* The 8 deferred metrics + onboarding-grant half, each paired
|
||||
with its blocking decision ID: (1) Live Infrastructure Health — D-096,
|
||||
(2) Live Outbox Write Rate — D-096, (3) Tamper-Evident Ledger
|
||||
@@ -954,7 +1002,8 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
(8) Predictive vs Reactive — future emitter. From
|
||||
`docs/METRICS_DEFERRED_ROADMAP.md`.
|
||||
- *Closes:* "Benefit: you now know the boundaries — what Nova measures
|
||||
today, and exactly what blocks the rest."
|
||||
today, and exactly what blocks the rest. The autonomy is real; the
|
||||
measurement gaps are documented."
|
||||
- *Grounded metrics cited:* none (deferral honesty).
|
||||
- *Deferred metrics:* all 8 + onboarding-grant half, each with decision ID.
|
||||
- *Transition into Act 5:* "The proof is honest — here is the roadmap
|
||||
@@ -965,7 +1014,7 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
> **Transition into Act 5:** "The proof is honest — here is the roadmap
|
||||
> from here to the 12–18 month targets."
|
||||
|
||||
**Slide 14 — Roadmap to the North Star**
|
||||
**Slide 15 — Roadmap to the North Star**
|
||||
- *Opens:* "This slide shows the path from v1.17's grounded metrics to
|
||||
the 12–18 month targets — the unblock path for each deferred metric."
|
||||
- *Delivers:* The deferred-metrics activation roadmap (from
|
||||
@@ -979,16 +1028,22 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
- *Deferred metrics:* all 8 referenced with unblock paths.
|
||||
- *Transition:* "The roadmap is clear — here is the recap and the ask."
|
||||
|
||||
**Slide 15 — Recap + Ask (the "what I told you" deck-level closing)**
|
||||
**Slide 16 — Recap + Ask (the "what I told you" deck-level closing; G-Q16 binding — ask reframed as a business decision)**
|
||||
- *Opens:* "This slide recaps the 5 acts and states the ask."
|
||||
- *Delivers:* Recap: Problem (operator bottleneck) → Vision (invisible
|
||||
ops, provable trust) → How (pipeline + Decision Ledger + attestation) →
|
||||
Proof (18V+4S, 100% ledger coverage, 100% attestation, grounded ROI) →
|
||||
Roadmap (deferred metrics have unblock paths). The ask: fund the
|
||||
hot-path activation (post-D-096) + the tamper-evident ledger build-out
|
||||
(D-083 lift).
|
||||
- *Closes:* "Benefit: you now know the full arc — and what is needed to
|
||||
close the gap from grounded to complete."
|
||||
Proof (18V+4S, 100% ledger coverage, 100% attestation, grounded ROI
|
||||
formula) → Roadmap (deferred metrics have unblock paths). **The ask
|
||||
(G-Q16 binding — reframed as a business decision, not insider
|
||||
language):** "The ask is a business decision: approve a pilot estate
|
||||
to activate the production-denominator metrics (Touchless Resolution,
|
||||
Human Escalation, AI Decision Accuracy), and approve the tamper-
|
||||
evident ledger build-out (D-083 lift) to move from local hash-chain
|
||||
to S3 Object Lock + JWS. These two decisions move Nova from
|
||||
'pipeline-ready' to 'production-proven.'"
|
||||
- *Closes:* "Benefit: you leave with a clear business decision to make
|
||||
— approve a pilot + the ledger build-out — and the confidence that
|
||||
every claim in this deck is grounded, derived, or honestly deferred."
|
||||
- *Grounded metrics cited:* Capability Health, Decision Ledger Coverage,
|
||||
Attestation Coverage (recap).
|
||||
- *Deferred metrics:* referenced as the ask.
|
||||
@@ -1021,28 +1076,41 @@ release), publish the Gitea release, and delete the milestone branches.
|
||||
|
||||
1. **Every slide's opening line references the previous slide's close.**
|
||||
Each slide above has an explicit transition sentence. No disjointed
|
||||
jumps.
|
||||
jumps. The Act 3→4 boundary (slide 9→10) was rewritten per G-Q13
|
||||
binding: "But 'how it works' is not 'proof it works.'"
|
||||
2. **Act indicator in the Marp footer.** `Act N/5: <act name>` keeps the
|
||||
audience oriented. Configured in the Marp theme.
|
||||
3. **The arc is visible.** Slide 1 (arc preview) + slide 15 (recap) bookend
|
||||
the deck. The audience always knows where they are in the 5-act
|
||||
structure.
|
||||
3. **The arc is visible.** Slide 1 (arc preview + stake line) + slide 16
|
||||
(recap + business-decision ask) bookend the deck. The audience always
|
||||
knows where they are in the 5-act structure.
|
||||
4. **Per-slide benefit callout is the last line.** Every slide closes with
|
||||
"Benefit: ..." — the audience leaves each slide with a takeaway, not a
|
||||
cliffhanger.
|
||||
5. **The Proof act is the centerpiece.** It is 4 slides (the longest act)
|
||||
because the PO's direction is "prove it, don't promise it." The
|
||||
grounded/derived/deferred honesty model is the narrative spine of the
|
||||
Proof act.
|
||||
6. **Deferred metrics are shown, not hidden.** Slide 13 ("What's Deferred
|
||||
— and Why") pairs each deferred metric with its blocking decision.
|
||||
This is the honesty that makes the grounded claims credible.
|
||||
cliffhanger. Benefit callouts rewritten per G-Q9 binding (slides 1, 4,
|
||||
13, 16 now give specific value, not generic restatements).
|
||||
5. **The Proof act is the centerpiece.** It is 5 slides (the longest act,
|
||||
expanded from 4 per G-Q10 binding: slide 12 split into Zero-Touch
|
||||
Efficiency + Cost & ROI) because the PO's direction is "prove it, don't
|
||||
promise it." The grounded/derived/deferred honesty model is the
|
||||
narrative spine of the Proof act.
|
||||
6. **Deferred metrics are shown, not hidden.** Slide 14 ("What's Deferred
|
||||
— and Why") pairs each deferred metric with its blocking decision,
|
||||
with a preempt (G-Q11 binding) clarifying that deferrals are
|
||||
measurement infrastructure, not whether the platform runs without
|
||||
humans.
|
||||
7. **The D-122 honesty sentence on slide 7.** The deck explicitly states
|
||||
that Nova's "AI" is the confidence-gated policy engine, not an LLM
|
||||
planner — per G-Q4 binding. This prevents the "no fabrication"
|
||||
constraint from being violated by implication.
|
||||
8. **Derived metrics carry the N=0 caveat.** Slides 12 and 13 annotate
|
||||
derived metrics (FTE, ROI) with "computed on N internal runs;
|
||||
production-denominator activates post-pilot" — per G-Q5/G-Q15 binding.
|
||||
The ROI formula is shown inline (G-Q15).
|
||||
|
||||
### Deck file inventory (after P5)
|
||||
|
||||
| File | Status |
|
||||
|------|--------|
|
||||
| `docs/presentations/nova-no-humans-platform.md` | NEW (source of truth) |
|
||||
| `docs/presentations/nova-no-humans-platform.md` | NEW (source of truth, 16 main + 2 appendix slides per G-Q10 split) |
|
||||
| `docs/presentations/nova-no-humans-platform-marp.md` | NEW (Marp) |
|
||||
| `docs/presentations/nova-no-humans-platform.html` | NEW (rendered) |
|
||||
| `docs/presentations/nova-no-humans-platform-talking-points.md` | NEW (talking points) |
|
||||
|
||||
Reference in New Issue
Block a user