Commit Graph

5 Commits

Author SHA1 Message Date
Jon Chery 9bc37301ba docs(P4): trim word count + purge 'penetrate' repo-wide (REQ-271,272)
Targeted ~20-30% word-count trim on 8 verbose slides (1, 5, 7, 8, 13,
14, 20, appendix). Tables + short slides untouched. Spirit preserved.
Removed 'penetrate' (and derivatives) from docs/scope.md, docs/vision.md,
.ciagent/PROJECT.md, .ciagent/CLARIFY.md, .ciagent/NORTH_STAR.md, and
presentation files (G-001 binding revision). RESEARCH.md/PLAN.md/GRILL.md
exempt as decision-history. Slide 5 'penetrates' phrase removed with no
replacement (slide 4 Anti-Goals already excludes the PDLC).

---ci---
project: acdl
phase: 4
milestone: v1.23
status: execute
phase_role: execution
---/ci---
2026-08-12 00:26:37 +00:00
Jon Chery e7866fda84 docs(P1): strategic docs — thesis rename + NORTH_STAR objectives + RACI restructure
Nova Slides Render / render (push) Failing after 1m4s
AUTONOMY_THESIS.md (git mv from NO_HUMANS_THESIS.md): reframe from
'removing humans' to 'autonomy in operations, human at stage gates'.
Drop D-### citations + internal file paths; keep anti-claims, reworded.
Anti-claim #1 now: 'decisions are NOT made by an LLM — deterministic
scripts calculate a score; the platform functions without AI'.

NORTH_STAR.md:
- Vision: 'invisible' → 'visible' (operations become visible — recurring
  theme); polish for technical audience (security, remediation velocity,
  reliability, lead time).
- Objective #2: 'provable trust in AI decisions' → 'provable trust in
  automated decisions' (deterministic scripts calculate a score;
  platform functions without AI).
- Objective #3: four CTO-grade metrics (Lead Time PR→Prod, Infra Vuln
  Count trend, MTTR, Cloud Spend Reduction) → all flow into PowerBI.
- Objective #4: 'default substrate for agentic consumption' → integrate
  with externally owned PDLC/SDLC/Agentic/Citizen Developer platforms
  regardless of source; Nova provides skills + MCP endpoints; all prod
  intents go through the same controls + quality gates.
- Anti-goals: drop #1 (hyperscaler competitor), #4 (legacy untagged),
  #5 (sold to operators). Add: 'not an upstream development platform',
  'not a replacement for the PDLC'. Reword #3 (no 'removes humans').

docs/raci.md: 3 roles → 4 roles. Add Quality Engineering column. Rename
Release Management → SRE. Split release attestation into Quality
attestation (QA) + Production readiness (SRE). Platform no longer holds
A for attestation — reassigned to QE/SRE.

docs/scope.md: add integration framing (skills + MCP endpoints, all
sources go through same controls).

Render scripts: default deck name → nova-autonomous-cloud-delivery.
ONBOARDING + terraform/onboarding: 'no-humans' → 'autonomous'.

---ci---
project: acdl
phase: 1
milestone: v1.21
status: execute
phase_role: execution
---/ci---
2026-08-11 13:55:53 +00:00
Jon Chery 97560e3c88 docs(grill): v1.17 binding decisions applied — 12 fixes (NORTH_STAR reclassification + deck plan rewrites)
NORTH_STAR-CHANGE: reclassify 3 targets to Post-Pilot section (E-003);
move AI-Agent Intent Share to Future Horizons (E-004).

GRILL binding decisions applied:
- G-Q4: D-122 honesty sentence on slide 7 (Nova's AI = confidence-gated policy engine, not LLM)
- G-Q5/G-Q15: derived metrics annotated with N=0 caveat; ROI formula shown inline on slide 13
- G-Q6: NORTH_STAR targets reclassified (3 to Post-Pilot, honesty note added)
- G-Q8: stake line (18V+0 consumers) added to slide 1
- G-Q9: 4 filler benefit closes rewritten (slides 1, 4, 13, 16)
- G-Q10: slide 12 split into Zero-Touch Efficiency + Cost & ROI (deck now 18 slides)
- G-Q11: preempt added to slide 14 (deferrals are measurement infra, not autonomy)
- G-Q13: Act 3->4 transition rewritten ('how it works' is not 'proof it works')
- G-Q14: slide 9 benefit reframed from data plumbing to trust substrate
- G-Q16: slide 16 ask reframed as business decision (approve pilot + ledger build-out)

---ci---
project: acdl
phase: 0
milestone: v1.17
status: grill
---/ci---
2026-08-04 19:44:28 +00:00
Jon Chery f55579bea8 docs(P00): clarify — validation pass, tighten attestation wording (REQ-191/194)
CLARIFY validation complete. 14 decisions (D-120..D-132) locked.
4 low-severity items deferred to PLAN. No blocking ambiguities.
- Attestation Coverage canonical owner = REQ-194 (compliance)
- REQ-191 excludes Attestation Coverage (cross-ref to REQ-194)
- NORTH_STAR success criteria #1: distinguish event completeness (qa/prod/dr) from coverage metric (prod/dr)

---ci---
project: acdl
phase: 0
milestone: v1.17
status: clarify
---/ci---
2026-08-04 19:10:52 +00:00
Jon Chery 7fc646d773 docs(init): validate specification — v1.17 Strategic Direction, Leadership Metrics & Unified Story
---ci---
project: acdl
phase: 0
milestone: v1.17
status: specify
---/ci---
2026-08-04 19:08:31 +00:00