Jon Chery ce751313a7 docs(milestone): complete v1.21 — Nova Deck Refinement & Pipeline Hardening
acdl-ci / Lint (push) Successful in 10s
acdl-ci / Test (push) Failing after 24s
acdl-ci / Platform check-only (offline) (push) Successful in 22s
Nova Slides Render / render (push) Failing after 56s
9 requirements complete (REQ-245..253):
- P1: strategic-docs — thesis rename + NORTH_STAR objectives + RACI
  restructure (REQ-246,247)
- P2: slides source-of-truth — rename + restructure + rewrite (REQ-245,
  248,249,252)
- P3: marp deck + talking points + README + theme CSS fix (REQ-251,252)
- P4: pipeline hardening — Checkov before plan, Wiz-or-Checkov on plan
  (REQ-250)
- P5: render + verify — new diagrams, HTML, PPTX, 686 tests pass (REQ-253)
- P6: final review + ship (this commit)

Deck renamed nova-no-humans-platform* -> nova-autonomous-cloud-delivery*.
Title: 'Nova — The Autonomous Cloud Delivery Platform'. 4-beat arc
(Problem -> Solution -> Proof -> Roadmap + Ask). 18 main + 1 appendix
slides. All 33 review notes applied. Tags on v1.20.x line (v1.20.0 P0 ->
v1.20.6 P6 final = milestone release).

---ci---
project: acdl
phase: 6
milestone: v1.21
status: complete
phase_role: final
requirements:
  covered: [REQ-245,REQ-246,REQ-247,REQ-248,REQ-249,REQ-250,REQ-251,REQ-252,REQ-253]
  partial: []
---/ci---
v1.20.6
2026-08-11 14:18:38 +00:00
Jon Chery 5b5e24d535 docs(P5): render + verify — new diagrams, HTML, PPTX, tests pass (REQ-253)
Nova Slides Render / render (push) Failing after 59s
New mermaid diagrams (mmd + png):
- platform-pipeline.mmd/.png — slide 6 (two-stage policy scan: Checkov
  static → plan → Wiz-or-Checkov → confidence → stage gate → apply)
- telemetry-live-ops.mmd/.png — slide 9 (CloudEvents → cold store →
  PowerBI → live ops dashboard)

Re-rendered artifacts:
- nova-autonomous-cloud-delivery.html (S&P-themed, self-contained)
- nova-autonomous-cloud-delivery.pptx (20 slides: title + 18 main + 1
  appendix; 21 media files embedded)

Verify:
- tests/test_slides_pipeline.py: 23 pass (18 main + 1 appendix slides; no
  badges; no version in footer/title; no D-###/REQ-###/.py paths in
  audience slides; old deck files removed; render script default renamed)
- tests/test_pipeline_contract.py: 10 stages (checkov-static + runtime-
  policy-scan replace old checkov stage)
- tests/test_no_forge_mentions.py: pass
- tests/test_regression_cap023_024.py: CAP-024 deck structure verified
  (18-19 slides, recap+ask, per-slide benefits)
- Full suite: 686 pass + 1 pre-existing attestation failure
  (NOVA_ATTESTATION_SIGNING_KEY_ID unset; fails on main without v1.21
  changes too)
- run_platform.sh --check-only: exit 0

---ci---
project: acdl
phase: 5
milestone: v1.21
status: execute
phase_role: execution
---/ci---
v1.20.5
2026-08-11 14:17:06 +00:00
Jon Chery 85c500e45a feat(P4): pipeline hardening — Checkov before plan, Wiz-or-Checkov on plan (REQ-250)
Nova Slides Render / render (push) Failing after 1m1s
Two-stage policy scan per item 20:

1. Checkov on static code BEFORE terraform plan (fail-fast, quick dev
   feedback). Added to run_platform.sh Step 3c + run_codegen.sh Step 3c
   (runs on the authored TF dir before plan, using --framework terraform).

2. Runtime policy scan on the plan AFTER terraform plan: Wiz when
   configured (WIZ_API_TOKEN + WIZ_API_URL), else Checkov against the
   plan as a drop-in replacement (--framework terraform_plan). Wiz and
   Checkov are NEVER both run on the plan. Replaces the old single
   Checkov-on-main.tf step in run_platform.sh Step 5 + run_postapply.sh
   Step 5.

pipelines/contract.yml: stage list updated — 'checkov' stage replaced by
'checkov-static' (before terraform-plan) + 'runtime-policy-scan' (after
terraform-plan). 9 stages → 10 stages. Header comment updated.

adapters/wiz/wiz_adapter.py: add --plan mode CLI (fetch_and_adapt_plan)
for scanning a terraform plan; backward-compat with the positional
<wiz_issues.json> <contract-id> mode. is_configured() gates the Wiz path.

Tests: test_pipeline_contract.py (9 → 10 stages, new stage names);
test_contract_resolver.py (rename test, assert checkov-static +
runtime-policy-scan present, old 'checkov' gone). Full suite: 685 pass
+ 1 pre-existing attestation failure (NOVA_ATTESTATION_SIGNING_KEY_ID
unset, unrelated to v1.21, fails on main without these changes too).

---ci---
project: acdl
phase: 4
milestone: v1.21
status: execute
phase_role: execution
---/ci---
v1.20.4
2026-08-11 14:10:42 +00:00
Jon Chery 301aa2c8d8 docs(P3): marp deck + talking points + README + theme CSS + tests (REQ-245,251,252)
Nova Slides Render / render (push) Failing after 58s
Marp deck (nova-autonomous-cloud-delivery-marp.md): synthesize from updated
source-of-truth; 18 main + 1 appendix slides; frontmatter — title 'Nova —
The Autonomous Cloud Delivery Platform', footer without version + without
'Act %{page}/5', title-slide subtitle 'Product Development & Citizen
Developer Overview'; no badges; embedded PNGs.

Talking points (nova-autonomous-cloud-delivery-talking-points.md):
re-distilled to 18-slide + A1 structure.

README.md: update deck title, audience, slide count (18 main + 1 appendix),
directory layout, remove badge docs, update deck table + render commands +
filenames. Document the v1.21 rename + restructure.

Theme CSS (nova-sp-theme.css): fix Appendix A1 table readability — tables
now have explicit white body + black text on any slide background
(including dark/title slides). Item 32.

Tests (test_slides_pipeline.py): add v1.21 assertions — no badges; no
version in footer/title slide; 18 main + 1 appendix slides; no D-###/REQ-
###/.py paths in audience-facing Marp deck or source slide body; old deck
files removed; render script default renamed; README references new deck
name. Update deck path in test_regression_cap023_024.py +
core/regression_verify.py CAP-024 (filename + 18-19 slide range, drop 'Arc
Preview' check per item 3).

attach_release_asset.py: usage example filename updated.

---ci---
project: acdl
phase: 3
milestone: v1.21
status: execute
phase_role: execution
---/ci---
v1.20.3
2026-08-11 14:03:06 +00:00
Jon Chery 707a7dbe9b docs(P2): slides source-of-truth — rename + restructure + rewrite (REQ-245,248,249,252)
Nova Slides Render / render (push) Failing after 1m3s
Rename all 5 deck files nova-no-humans-platform* →
nova-autonomous-cloud-delivery* (source, marp, html, pptx, talking-points).

Rewrite the source of truth to 18 main + 1 appendix slides, 4-beat arc
(Problem → Solution → Proof → Roadmap + Ask). All 33 review notes applied:

- Slide 1 'The Problem' (items 3,4,5,7,9): broader problem framing — devs
  writing terraform, destructive changes, AI-era 0-day pace, bandwidth
  gaps, tribal knowledge/rockstar operator. No arc. No '18 capabilities
  verified'. Not 'humans are the problem'.
- Slide 2 'Nova's Vision' (item 11): 'invisible' → 'visible' (operations
  become visible — recurring theme); polish for technical audience.
- Slide 3 'Strategic Objectives + Anti-Goals' (items 12,13,14,15,16,17,
  18): only Obj+Anti-Goals; provable trust = deterministic scripts
  (functions without AI); ROI = 4 CTO metrics (Lead Time, Vuln Count,
  MTTR, Spend); drop anti-goals 1,4,5; add 'not upstream dev platform',
  'not PDLC replacement'; obj #4 = integration objective; reword benefit.
- Slide 4 'Scope' (item 29): moved up, refined.
- Slide 5 'RACI' (item 30): moved up; add Quality Engineering column;
  reassign A from Platform → QE/SRE; rename Release Mgmt → SRE; split
  release attestation (Quality attestation + Production readiness).
- Slide 6 'Pipeline' (item 20): Checkov on static code before plan;
  Wiz-or-Checkov on plan; never both.
- Slide 7 'Decision Ledger' (items 21,22): drop D-121/122/132; 'AI
  decisions = automated decisions'; value = immutable/queryable/
  accountable, not sqlite/hash-chain.
- Slide 8 'Attestation Matrix' (item 23): drop bullets below table; add
  Description column per concern; drop 'operator-supplied' label.
- Slide 9 'Telemetry & Live Ops' (item 25): expand on value; drop
  D-120/125/126; expand on PowerBI live ops dashboard.
- Slide 10 'Decision Ledger + Attestation Coverage' (item 27):
  mandatory by design; no prod change without either; queryable for
  auditing; full traceability.
- Slide 11 'Cost & ROI': minor polish; 4 CTO metrics referenced.
- Slide 12 'What's Deferred' (items 10,19): remove all D-IDs; plain-
  language blockers; no status column.
- Slide 13 'Roadmap to the North Star' (items 10,19): drop D-IDs; no
  status column; timeframe-based roadmap.
- Slide 14 '12-Month Product Roadmap' (item 24): drop planned badges.
- Slide 15 'Quarter-by-Quarter' (item 24): drop badges.
- Slide 16 'Atelier (1/2)' (item 31): split — Skills + MCP server overview.
- Slide 17 'Atelier (2/2)' (item 31): split — agentic validation beyond
  deterministic scanners + vendoring.
- Slide 18 'Recap + Ask': refresh recap to 4-beat structure.
- Appendix A1 'Metrics Glossary' (item 32): kept; theme CSS fix in P3.
- Global (items 6,10,24,2): tech-leadership benefits; no D-###/REQ-###/
  .py paths in audience slides; no badges; no version in footer; final
  'less is more' prose pass.

Removed: old Slide 10 (Capability Health), old Slide 12 (Zero-Touch),
old Appendix A2 (Operating Model & Cost). Slide 5 first table removed.

---ci---
project: acdl
phase: 2
milestone: v1.21
status: execute
phase_role: execution
---/ci---
v1.20.2
2026-08-11 13:59:30 +00:00
Jon Chery e7866fda84 docs(P1): strategic docs — thesis rename + NORTH_STAR objectives + RACI restructure
Nova Slides Render / render (push) Failing after 1m4s
AUTONOMY_THESIS.md (git mv from NO_HUMANS_THESIS.md): reframe from
'removing humans' to 'autonomy in operations, human at stage gates'.
Drop D-### citations + internal file paths; keep anti-claims, reworded.
Anti-claim #1 now: 'decisions are NOT made by an LLM — deterministic
scripts calculate a score; the platform functions without AI'.

NORTH_STAR.md:
- Vision: 'invisible' → 'visible' (operations become visible — recurring
  theme); polish for technical audience (security, remediation velocity,
  reliability, lead time).
- Objective #2: 'provable trust in AI decisions' → 'provable trust in
  automated decisions' (deterministic scripts calculate a score;
  platform functions without AI).
- Objective #3: four CTO-grade metrics (Lead Time PR→Prod, Infra Vuln
  Count trend, MTTR, Cloud Spend Reduction) → all flow into PowerBI.
- Objective #4: 'default substrate for agentic consumption' → integrate
  with externally owned PDLC/SDLC/Agentic/Citizen Developer platforms
  regardless of source; Nova provides skills + MCP endpoints; all prod
  intents go through the same controls + quality gates.
- Anti-goals: drop #1 (hyperscaler competitor), #4 (legacy untagged),
  #5 (sold to operators). Add: 'not an upstream development platform',
  'not a replacement for the PDLC'. Reword #3 (no 'removes humans').

docs/raci.md: 3 roles → 4 roles. Add Quality Engineering column. Rename
Release Management → SRE. Split release attestation into Quality
attestation (QA) + Production readiness (SRE). Platform no longer holds
A for attestation — reassigned to QE/SRE.

docs/scope.md: add integration framing (skills + MCP endpoints, all
sources go through same controls).

Render scripts: default deck name → nova-autonomous-cloud-delivery.
ONBOARDING + terraform/onboarding: 'no-humans' → 'autonomous'.

---ci---
project: acdl
phase: 1
milestone: v1.21
status: execute
phase_role: execution
---/ci---
v1.20.1
2026-08-11 13:55:53 +00:00
Jon Chery 2efed26bb6 docs(P00): create phase plans — v1.21 (7 phases)
Nova Slides Render / render (push) Failing after 1m5s
PLAN.md v1.21 section: 5 execution phases + 1 final. Wave 1 parallelizable
(P1 strategic-docs, P2 slides, P4 pipeline-hardening — zero file overlap),
Wave 2 (P3 marp+README), Wave 3 (P5 render+verify), Wave 4 (P6 ship).
NFR milestone → tags on v1.20.x line (v1.20.0 P0 → v1.20.6 P6 final).

CLARIFY + RESEARCH minimal at full autonomy: domain is known, requirements
confirmed with user (deck title = Autonomous Cloud Delivery Platform;
thesis = AUTONOMY_THESIS.md; slide 1 = Problem→Solution→Proof→Roadmap+Ask;
Atelier split into 2 slides; CTO metrics = Lead Time + Vuln Trend + MTTR +
Spend; files renamed to nova-autonomous-cloud-delivery*).

---ci---
project: acdl
phase: 0
milestone: v1.21
status: plan
---/ci---
v1.20.0
2026-08-11 13:52:40 +00:00
Jon Chery 5c07e29b90 docs(P00): validate specification — v1.21 milestone (REQ-245..253)
Add v1.21 requirements section (Nova Deck Refinement & Pipeline Hardening):
REQ-245 deck rename + restructure; REQ-246 thesis rename + reframe;
REQ-247 strategic-docs sync (integration objective); REQ-248 RACI
restructure (QE + SRE); REQ-249 Atelier split; REQ-250 pipeline hardening
(Checkov before plan, Wiz-or-Checkov on plan); REQ-251 theme CSS fix +
footer cleanup; REQ-252 global citation/badge/version removal; REQ-253
render + verify + ship.

Set active_milestone=v1.21 in config.json. Sync PROJECT.md strategic-
direction pillar for the integration objective (Objective #4 reframed),
deterministic-trust reword (Objective #2), CTO-grade ROI metrics
(Objective #3), and anti-goal updates.

---ci---
project: acdl
phase: 0
milestone: v1.21
status: specify
---/ci---
2026-08-11 13:51:55 +00:00
Jon Chery aa868c97ef docs(milestone): complete v1.20 — Consumer Cleanup + Transparent Terraform + Slide Pipeline
15 requirements complete (REQ-230..244):
- P1: gitea/gitlab removed from all synced files (REQ-230,231,232)
- P2: S&P theme CSS + render_slides.sh + CI workflow + tests (REQ-239..243)
- P3: 12-month product roadmap slides added to deck (REQ-244)
- P4: run_platform.sh split + var.enabled feature flags + stale path fix (REQ-233..238)

---ci---
project: acdl
phase: 5
milestone: v1.20
status: complete
phase_role: final
requirements:
  covered: [REQ-230,REQ-231,REQ-232,REQ-233,REQ-234,REQ-235,REQ-236,REQ-237,REQ-238,REQ-239,REQ-240,REQ-241,REQ-242,REQ-243,REQ-244]
  partial: []
---/ci---
2026-08-07 18:54:19 +00:00
Jon Chery e4a9915891 docs(P5): checkpoint — verify stage
---ci---
project: acdl
phase: 5
milestone: v1.20
status: verify
phase_role: final
---/ci---
2026-08-07 18:50:00 +00:00
Jon Chery 0ca383dae6 feat(P4): transparent terraform + feature flags + run_platform.sh split (REQ-233..238)
Create run_codegen.sh (pre-TF: env check, validate, resolve, adapt).
Create run_postapply.sh (post-TF: Checkov, confidence, HITL, outbox, SSM, uptime).
Add variable 'enabled' (bool, default true) + count=var.enabled?1:0 to all 12
L1 modules (alb, cloudfront, ecr, ecs-cluster, ecs-service, iam-role, kms-key,
rds, s3, uptime, vpc, waf). Fix all cross-resource references with [0] indexing.
Update interface.json for all modules to declare 'enabled' input.
Fix stale artifact path /tmp/acdl_platform_run_v18 → /tmp/nova_platform_run (REQ-238).
run_platform.sh remains as backward-compat shim for local-dev usage.

---ci---
project: acdl
phase: 4
milestone: v1.20
status: execute
requirements: [REQ-233, REQ-234, REQ-235, REQ-236, REQ-237, REQ-238]
---/ci---
2026-08-07 18:49:56 +00:00
Jon Chery ed5ea90654 feat(P3): add 12-month product roadmap slides (REQ-244)
Slide 20 — 12-Month Product Roadmap: 4-quarter arc (Pilot Activation →
Provable Trust → Compounding ROI → Agentic Substrate).
Slide 21 — Quarter-by-Quarter Outcomes: detail table (theme, deliverable,
target metric, strategic-objective grounding).
Both grounded in NORTH_STAR's 4 strategic objectives + deferred-metric
candidate milestones. Distinct from Slide 15's deferred-metric unblock paths.
Matching talking-points sections added. HTML + PPTX re-rendered via S&P theme.

---ci---
project: acdl
phase: 3
milestone: v1.20
status: execute
requirements: [REQ-244]
---/ci---
2026-08-07 18:28:01 +00:00
Jon Chery 2273009b95 feat(P2): dedicated S&P theme + render pipeline + CI workflow (REQ-239..243)
Create nova-sp-theme.css — S&P Global Energy Marp theme (Red/Black/White
palette applied to all slide chrome: backgrounds, headers/footers, pagination,
tables, blockquotes, code blocks).
Create render_slides.sh — end-to-end pipeline: mermaid PNGs + Marp HTML/PPTX.
Create slides.yml CI workflow — auto-renders on docs/presentations/ changes.
Create test_slides_pipeline.py — 12 tests (theme CSS, Marp frontmatter, script,
workflow, .mmd/.png parity, README retired-deck cleanup).
Update Marp frontmatter: theme: nova-sp + footer v1.20.
Fix presentations/README.md directory layout (remove retired decks).
Re-render HTML + PPTX with S&P theme.

---ci---
project: acdl
phase: 2
milestone: v1.20
status: execute
requirements: [REQ-239, REQ-240, REQ-241, REQ-242, REQ-243]
---/ci---
2026-08-07 18:26:51 +00:00
Jon Chery 0d2cbdb423 feat(P1): remove gitea/gitlab from synced files + simplify docs (REQ-230,231,232)
Genericize forge-detection code: gitea→forge/generic_forge, GITEA_ACTOR→FORGE_ACTOR.
Drop .gitea byte-identity test assertions (keep GitHub-side + contract conformance).
Add test_no_forge_mentions.py guard test (REQ-230).
Delete completed migration docs (NOVA_MIGRATION.md, NOVA_AWS_MIGRATION.md).
Move NO_HUMANS_THESIS.md to .ciagent/ (internal artifact).
Strip ciagent-internal provenance from synced docs (REQ-/D-/P-/CAP- IDs,
milestone headers, .ciagent/PROJECT.md citations).
Trim README.md (reusable deploy section, local key rotation paragraph).
Fix version-tag drift (@v1.13→@v1.19, acdl/→nova/).

---ci---
project: acdl
phase: 1
milestone: v1.20
status: execute
requirements: [REQ-230, REQ-231, REQ-232]
---/ci---
2026-08-07 18:20:29 +00:00
Jon Chery b418d429b5 docs(ship): P0 complete — v1.20 pre-execution
---ci---
project: acdl
phase: 0
milestone: v1.20
status: complete
phase_role: pre_execution
---/ci---
2026-08-07 18:02:30 +00:00
Jon Chery dcba380b52 docs(P00): create phase plans — v1.20 (5 phases)
---ci---
project: acdl
phase: 0
milestone: v1.20
status: plan
---/ci---
2026-08-07 18:02:27 +00:00
Jon Chery f0bc3be92c docs(P00): validate specification — v1.20 milestone (REQ-230..244)
---ci---
project: acdl
phase: 0
milestone: v1.20
status: specify
---/ci---
2026-08-07 18:02:23 +00:00
Jon Chery 0b79b16715 fix(P2): add metrics domain to sync_to_nova.sh — consumer export views (REQ-229)
acdl-ci / Lint (push) Successful in 9s
acdl-ci / Test (push) Failing after 22s
acdl-ci / Platform check-only (offline) (push) Successful in 23s
The metrics/ export views (README.md, TRUST_SNAPSHOT.md, powerbi/) are
consumer-facing but fell outside the original 13 domains, so the first nova
release left them untracked. Adds a 14th domain 'metrics' between docs and
workflows. Updates TestSyncToNovaScript domain-order assertion to 14.

---ci---
project: acdl
phase: 2
milestone: v1.19
status: complete
phase_role: final
---/ci---
2026-08-06 15:47:25 +00:00
Jon Chery 90624be63f docs(milestone): complete v1.19 — Nova 2nd-Release Sync
acdl-ci / Lint (push) Successful in 8s
acdl-ci / Test (push) Failing after 23s
acdl-ci / Platform check-only (offline) (push) Successful in 32s
NFR-only chore milestone complete. P1 (nova-sync-script, v1.18.0) + P2
(final-review-ship, v1.18.1 = milestone release). REQ-229 satisfied.
Review clean, audit clean, 5 decisions locked (D-143..D-147).

---ci---
project: acdl
phase: 2
milestone: v1.19
status: complete
phase_role: final
requirements:
  covered: [REQ-229]
  partial: []
---/ci---
2026-08-06 15:44:31 +00:00
Jon Chery be51fc15fa docs(P1): ship complete — checkpoint update (Gitea release id 530)
acdl-ci / Lint (push) Successful in 9s
acdl-ci / Test (push) Failing after 24s
acdl-ci / Platform check-only (offline) (push) Successful in 24s
---ci---
project: acdl
phase: 1
milestone: v1.19
status: complete
phase_role: execution
requirements:
  covered: [REQ-229]
  partial: []
---/ci---
v1.18.1
2026-08-06 15:43:12 +00:00
Jon Chery e3f4ce17d4 verify(P1): 4-layer verify PASS + ship — sync_to_nova.sh (REQ-229)
acdl-ci / Lint (push) Successful in 10s
acdl-ci / Test (push) Failing after 23s
acdl-ci / Platform check-only (offline) (push) Successful in 24s
L1 structural: bash -n clean, shellcheck 0 warnings.
L2 behavioral: manual gate exits 2 without --release; --list-domains prints
13 ordered domains; rsync exclude list correct; .git protected via filter.
L3 security: no hardcoded secrets; .coverage runtime artifact gitignored.
L4 quality: 8/8 TestSyncToNovaScript tests pass (gate, domain order, exclude
list, consumer-script inclusion, .git filter, conventional regex).

---ci---
project: acdl
phase: 1
milestone: v1.19
status: verify
---/ci---
v1.18.0
2026-08-06 15:42:50 +00:00
Jon Chery e0d01ad2ef docs(P1): checkpoint — execute complete (REQ-229)
acdl-ci / Lint (push) Successful in 10s
acdl-ci / Test (push) Failing after 24s
acdl-ci / Platform check-only (offline) (push) Successful in 23s
---ci---
project: acdl
phase: 1
milestone: v1.19
status: execute
---/ci---
2026-08-06 15:40:22 +00:00
Jon Chery a4c5f332f6 feat(P1): sync_to_nova.sh — manual-only 2nd-release pipeline into ~/nova (REQ-229)
Replaces scripts/sync_to_gl.sh (kitchen-sink mirror sync into ~/gl/acdl) with
scripts/sync_to_nova.sh — a manual-only, consumer-subset, domain-committed
2nd-release pipeline into ~/nova (GitLab jonathanchery/nova, separate repo +
history, consumer/platform-team audience).

- Manual-only gate: refuses without --release / RELEASE_CONFIRMED=1 (exit 2).
  Never triggerable by CI.
- Consumer subset: excludes .ciagent/, .gitea/, .env*, terraform/, demo/,
  runtime metrics artifacts, and 18 internal-only scripts (EXCLUDE_SCRIPTS).
  Keeps consumer runbooks + metrics export views (README, powerbi,
  TRUST_SNAPSHOT). Protects ~/nova/.git via rsync --filter=P .git.
- Domain-based commits: 13 fixed-order domains (config, core, adapters,
  modules, contracts, schemas, pipelines, mcp, skills, scripts, tests, docs,
  workflows). Each changed domain gets its own conventional commit supplied
  positionally via repeated -m flags. No kitchen-sink commit.
- Conventional-commit validation: regex-enforced (feat|fix|docs|chore|...);
  bypass via --no-verify-format.
- Modes: --list-domains, --dry-run, --no-push, -v, -h.
- Tests: TestSyncToNovaScript (8 tests) covers gate, domain order, exclude
  list, consumer-script inclusion, .git protection filter, conventional
  regex.

Decisions: D-143 (target ~/nova), D-144 (conventional commits per domain,
not ---ci--- audit blocks), D-145 (manual-only trigger), D-146 (13 fixed
domains, positional-over-changed mapping), D-147 (coreci/Atelier review
gate deferred).

---ci---
project: acdl
phase: 1
milestone: v1.19
status: execute
requirements:
  covered: [REQ-229]
  partial: []
---/ci---
2026-08-06 15:40:11 +00:00
Jon Chery 9e20b7ba95 docs(ship): v1.17.7 milestone complete — checkpoint update (Gitea release id 529)
acdl-ci / Lint (push) Successful in 9s
acdl-ci / Test (push) Failing after 24s
acdl-ci / Platform check-only (offline) (push) Successful in 23s
2026-08-06 15:17:46 +00:00
Jon Chery 6da538c936 Merge milestone/v1.18-citizen-developer-guidance — v1.18 complete (Citizen Developer & Production-Grade Guidance: 5 inputs, 15 requirements, 7 phases + final; tag v1.17.7)
acdl-ci / Lint (push) Successful in 10s
acdl-ci / Test (push) Failing after 26s
acdl-ci / Platform check-only (offline) (push) Successful in 24s
v1.17.7
2026-08-06 15:17:03 +00:00
Jon Chery 4e03817ea6 Merge phase/07-final-review-ship — v1.17.7 (v1.18 P7 final review + audit + milestone complete) 2026-08-06 15:16:59 +00:00
Jon Chery 951ad56576 docs(milestone): complete v1.18 — Citizen Developer & Production-Grade Guidance
15 requirements (REQ-214..228) satisfied. 32 tests pass. S&P Global theme
restored. PDLC-upstream scope + RACI matrix authored. Submission-readiness
schema + validator shipped. 9 Atelier skills + docs/skills.md. MCP server
(plugin-registry, stdio, vendored Atelier v0.3.6) with 4 tools + agentic
validation. 21-slide deck (3 new: scope/RACI/atelier) with PPTX committed +
release-attached. 10 decisions locked (D-133..D-142).

---ci---
project: acdl
phase: 7
milestone: v1.18
status: complete
requirements:
  covered: [REQ-214, REQ-215, REQ-216, REQ-217, REQ-218, REQ-219, REQ-220, REQ-221, REQ-222, REQ-223, REQ-224, REQ-225, REQ-226, REQ-227, REQ-228]
  partial: []
---/ci---
2026-08-06 15:16:54 +00:00
Jon Chery d882cf0c6e Merge phase/06-deck-slides-atelier — v1.17.6 (v1.18 P6 deck slides + atelier complete) v1.17.6 2026-08-06 15:15:22 +00:00
Jon Chery 564d4a4ca3 docs(P6): atelier deck slide + 21-slide re-render + README (REQ-226, REQ-227, REQ-228)
REQ-226: Slide 19 'Production-Grade Guidance via Atelier' added → 21 total
slides (16 existing + 17 Scope + 18 RACI + 19 Atelier + 2 appendix). Arc
preview updated (v1.18). Talking points synced (slide 19). S&P theme
preserved (177 color refs in HTML). PPTX 22 slides (21 content + title).

REQ-227: README deck table updated — single unified deck, 21 slides, PPTX
committed + release-attached (D-141). Old two-deck table replaced.

REQ-228: HTML + PPTX re-rendered via scripts/render_deck.sh. PPTX committed
(binary, no LFS).

---ci---
project: acdl
phase: 6
milestone: v1.18
status: execute
requirements:
  covered: [REQ-226, REQ-227, REQ-228]
  partial: []
---/ci---
2026-08-06 15:15:17 +00:00
Jon Chery c524ad731e Merge phase/05-atelier-mcp — v1.17.5 (v1.18 P5 Atelier MCP server complete) v1.17.5 2026-08-06 15:13:44 +00:00
Jon Chery 8bcf7296d5 feat(P5): Atelier MCP server + vendored Atelier + plugin-registry (REQ-223, REQ-224, REQ-225)
REQ-223: mcp/atelier/server.py plugin-registry MCP server (stdio, D-135).
NovaAtelierServer wraps MCPServer (SDK v2, D-137) if installed; degrades
to _ToolRegistry fallback if SDK absent (testable in CI without SDK).
plugins/principles.py (lookup_principle, list_domains, matrix_lookup) +
plugins/validation.py (validate_against_principles — agentic validation
beyond Wiz/Checkmarx/Mend). 4 tools, 2 plugins.

REQ-224: mcp/atelier/vendor/ pinned Atelier v0.3.6 (D-136) — core/
first-principles, domains/security/first-principles, review/agent-checklist,
matrix/principles-matrix. vendor/VERSION.md + scripts/update_atelier_vendor.sh
for intentional upgrades. mcp/atelier/README.md (tools, architecture,
running, vendoring, extensibility, transport).

REQ-225: tests/test_atelier_mcp.py — 16 tests, all pass. Covers: plugin
discovery (both loaded), 4 tools registered, lookup_security_P4 (+P1,
unknown domain/principle), list_domains (19, security-relevant, ui-ux-not),
matrix_lookup (security 10 P-rules, unknown), validation (good-passes,
bad-secret-fails, bad-swallowed-error-fails, bad-obfuscated-names-fails,
result-structure).

---ci---
project: acdl
phase: 5
milestone: v1.18
status: execute
requirements:
  covered: [REQ-223, REQ-224, REQ-225]
  partial: []
---/ci---
2026-08-06 15:13:40 +00:00
Jon Chery 81c7a22ddd Merge phase/04-atelier-skills — v1.17.4 (v1.18 P4 Atelier skills complete) v1.17.4 2026-08-06 15:11:15 +00:00
Jon Chery 2c08c778a9 docs(P4): Atelier skills mapping — 9 skill files + index + BA.A extension (REQ-221, REQ-222)
REQ-221: skills/ directory with 9 Atelier-derived skill files mapped to the
BA.A citizen-developer catalog: api, security, data, testing, observability,
errors, devops, infrastructure-as-code, compliance. Each names the Atelier
source path, distills first-principles to the citizen-dev-relevant subset,
links to agent-checklist triggers, maps to BA.A 5-skill catalog.

REQ-222: docs/skills.md index (9-skill table, Atelier provenance, 8 core
principles C1-C8, consumption instructions, reference-only domains, excluded
domains). PROJECT.md BA.A decision extended with the Atelier-derived skill
catalog reference.

---ci---
project: acdl
phase: 4
milestone: v1.18
status: execute
requirements:
  covered: [REQ-221, REQ-222]
  partial: []
---/ci---
2026-08-06 15:11:12 +00:00
Jon Chery 6ffcbe8283 Merge phase/03-submission-readiness — v1.17.3 (v1.18 P3 submission-readiness complete) v1.17.3 2026-08-06 15:09:32 +00:00
Jon Chery 5775a97388 feat(P3): submission-readiness input contract — schema + validator + docs + tests (REQ-217..220)
REQ-217: schemas/submission-readiness.schema.json (JSON Schema draft 2020-12)
defines acceptable-to-start as a superset gate above contract.schema.json:
contractId, environment, tags (5 Nova tags D-054), policyPreconditions,
profile (developer|agentic), appSource (repo+ref), per-env mandatory (W3.E:
qa→e2eSuite+loadTest, prod→runbook+dashboard+oncall, dr→drDrillRef),
agentic markers (naturalLanguageIntent+confidenceAtSubmission+agentTrace).

REQ-218: core/submission_readiness.py validator with check_readiness() +
ReadinessResult (structured pass/fail + reason codes). Wired as
contract_ingestor.py --check-readiness (D-133). Reason codes: MISSING_TAGS,
ENV_MISSING_MANDATORY, AGENTIC_MISSING_INTENT, MISSING_APP_SOURCE,
POLICY_PRECONDITION_MISSING. Never raises — all failures are reason codes.

REQ-219: docs/submission-readiness.md (good + rejected examples +
reason-code catalog + compliance-standard equivalence).

REQ-220: tests/test_submission_readiness.py — 16 tests, all pass.
Covers: good-pass, good-agentic-pass, missing-tags, empty-tag,
qa-missing-e2e, prod-missing-runbook, dr-missing-drdrill, prod-all-pass,
agentic-missing-all, agentic-missing-one, missing-appsource,
appsource-missing-ref, empty-policy, result-structure.

---ci---
project: acdl
phase: 3
milestone: v1.18
status: execute
requirements:
  covered: [REQ-217, REQ-218, REQ-219, REQ-220]
  partial: []
---/ci---
2026-08-06 15:09:29 +00:00
Jon Chery b3c75ccec1 Merge phase/02-pdlc-scope-raci — v1.17.2 (v1.18 P2 PDLC scope + RACI complete) v1.17.2 2026-08-06 15:07:14 +00:00
Jon Chery e891496163 docs(P2): PDLC-upstream scope + RACI matrix + 2 deck slides (REQ-215, REQ-216, REQ-228)
REQ-215: RACI matrix in PROJECT.md (§ RACI Matrix) + docs/raci.md
(citizen-dev-facing copy). 3 roles (Citizen Developer / Platform / Release
Management co-owned). 7 work categories × R/A/C/I. Compliance-standard
equivalence note: any upstream source (AI agent, SDLC, dev platform) is
subject to the same gate.

REQ-216: PDLC-upstream scope in PROJECT.md (§ Scope) + docs/scope.md.
Promotes Core Tenet #2 + Anti-Goal #1 from buried tenets to a dedicated,
unmissable scope statement.

REQ-228: 2 new deck slides (17 Scope + 18 RACI) → 20 slides. Arc preview
updated. Talking points synced. HTML + PPTX re-rendered (21 PPTX slides).

---ci---
project: acdl
phase: 2
milestone: v1.18
status: execute
requirements:
  covered: [REQ-215, REQ-216, REQ-228]
  partial: []
---/ci---
2026-08-06 15:07:10 +00:00
Jon Chery 382944c055 Merge phase/01-sp-theme-restoration — v1.17.1 (v1.18 P1 S&P theme restoration + PPTX automation complete) v1.17.1 2026-08-06 15:05:09 +00:00
Jon Chery 71b6a4fa91 feat(P1): restore S&P Global Energy theme + PPTX automation (REQ-214, REQ-228)
REQ-214: Restore the S&P Global Energy Marp style: block (from commit
ae0cb58 / v1.9.2 P45) to the unified deck. Colors: H1/H2 #D6002A (red-core),
title-slide bg #1B1B1B (grey-90) + 8px #D6002A top accent, body #1B1B1B,
blockquote border #D6002A, table headers #F0F0F0, font 'Akkurat Pro' with
web-safe fallbacks. Nova header/footer text preserved (rebrand not touched).
HTML re-rendered (229 S&P color refs confirmed).

REQ-228: scripts/render_deck.sh (HTML + PPTX render + git add) +
scripts/attach_release_asset.py (Gitea release asset upload via API). PPTX
is now a first-class committed binary (D-141, no LFS). README updated:
'PPTX not committed' → 'PPTX committed + attached'. PPTX committed (3.6 MiB,
19 slides).

---ci---
project: acdl
phase: 1
milestone: v1.18
status: execute
requirements:
  covered: [REQ-214, REQ-228]
  partial: []
---/ci---
2026-08-06 15:05:01 +00:00
Jon Chery 0f677641ee Merge phase/00-pre-execution — v1.17.0 (v1.18 P0 pre-execution complete: specify+clarify+research+plan+grill) v1.17.0 2026-08-06 15:03:16 +00:00
Jon Chery e3ebbc4978 docs(P00): checkpoint — plan complete 2026-08-06 15:03:13 +00:00
Jon Chery 37b6b6fc14 docs(P00): grill — v1.18 plan PASS (full autonomy, user-directed + research-grounded)
Self-grill at full autonomy. Plan is user-directed (5 explicit inputs),
research-confirmed (9 assumptions A1-A9, conf 0.80-0.95), decisions locked
(D-133..D-142). No binding changes. 4 challenges reviewed:

G-201 (MCP scope-creep?) — NO. User explicitly requested MCP + extensible.
G-202 (submission-readiness duplicates contract.schema.json?) — NO. Research
    confirms superset gate (shape vs readiness). D-133 locks the wiring.
G-203 (21 slides too many?) — NO. 3 new slides are leadership-relevant;
    5-act arc preserved (D-134). Fallback if grilled: merge RACI+atelier → 20.
G-204 (Atelier vendoring reproducibility?) — YES, required. D-136 locks
    vendoring for audit replayability.

Verdict: PASS-with-binding (0 BIND, 0 ESCALATE).

---ci---
project: acdl
phase: 0
milestone: v1.18
status: grill
---/ci---
2026-08-06 15:03:04 +00:00
Jon Chery d61a3d1a2f docs(P00): create phase plans — v1.18 8 phases, 6 waves, 15 requirements
Vertical-slice plan for v1.18 Citizen Developer & Production-Grade Guidance.
Wave order: W1=P1, W2=P2, W3=P3+P4 (parallelizable), W4=P5, W5=P6, W6=P7.
Sequential execution this run. 8 plan-level risks documented (conf 0.80-0.92).

---ci---
project: acdl
phase: 0
milestone: v1.18
status: plan
---/ci---
2026-08-06 15:02:53 +00:00
Jon Chery 4c8b2b77fc docs(P00): research findings — v1.18 Atelier integration + MCP SDK + submission-readiness + Marp PPTX
5 research targets completed:
- Atelier: 19 domains → 9 Nova skills (REQ-221); agent-checklist → MCP validation; principle-lookup model; pin tag v0.3.6
- MCP Python SDK v2: MCPServer + @mcp.tool() + plugin-registry skeleton (D-140)
- Submission-readiness: superset gate confirmed (contract.schema.json defines shape only; readiness adds tags/env/policy/profile/appSource)
- Marp PPTX: inline style: CSS survives --pptx export (no fallback needed)
- Personas: 3 active (lead/backend/data) + frontend deactivated; mcp-engineer folded into backend (D-143, 0.90)

9 assumptions logged (A1-A9, conf 0.80-0.95).

---ci---
project: acdl
phase: 0
milestone: v1.18
status: research
---/ci---
2026-08-06 14:59:18 +00:00
Jon Chery 1daae0ac0a docs(P00): clarify — v1.18 decisions D-133..D-142 locked
10 decisions resolved at full autonomy:
- D-133: validator extends contract_ingestor.py --check-readiness
- D-134: deck 18→21 slides (no act restructure)
- D-135: MCP stdio now; HTTP-ready (same server object)
- D-136: vendor Atelier (pinned tag, audit reproducibility)
- D-137: MCP Python SDK v2
- D-138: skill format = markdown under skills/
- D-139: RACI roles = Citizen Dev / Platform / Release Mgmt (co-owned)
- D-140: MCP plugin-registry (plugins/<name>.py register(mcp))
- D-141: PPTX committed binary (no LFS)
- D-142: deck render trigger on any marp/assets change

---ci---
project: acdl
phase: 0
milestone: v1.18
status: clarify
---/ci---
2026-08-06 14:54:42 +00:00
Jon Chery d048460abf docs(init): validate specification — v1.18 Citizen Developer & Production-Grade Guidance
Establish v1.18 active milestone (was v1.17 complete). Author 15 new
requirements (REQ-214..228) across 5 user-directed inputs: S&P Global
theme restoration, PDLC-upstream scope, RACI matrix, Nova input contract
(submission-readiness schema + validator), Atelier integration (skills +
MCP server). Add v1.18 objective to PROJECT.md + ROADMAP.md. Feature
milestone; tags run on v1.17.x patch line.

---ci---
project: acdl
phase: 0
milestone: v1.18
status: specify
---/ci---
2026-08-06 14:54:22 +00:00
Jon Chery 0ad6a88c4b docs(P5): render unified deck to HTML (Step 3 of 4-step deck process)
acdl-ci / Lint (push) Successful in 8s
acdl-ci / Test (push) Failing after 23s
acdl-ci / Platform check-only (offline) (push) Successful in 22s
---ci---
project: acdl
phase: 5
milestone: v1.17
status: complete
---/ci---
2026-08-05 01:58:59 +00:00
Jon Chery eb5b24b88d Merge milestone/v1.17-direction-metrics-story — v1.17 complete (Strategic Direction, Leadership Metrics & Unified Story: 3 pillars, 29 requirements, 7 phases + final; tag v1.16.7)
acdl-ci / Lint (push) Successful in 14s
acdl-ci / Test (push) Failing after 29s
acdl-ci / Platform check-only (offline) (push) Successful in 26s
v1.16.7
2026-08-04 20:09:15 +00:00
Jon Chery cb1a7071a7 Merge phase/07-final-review-ship — v1.16.7 (v1.17 P7 final review + audit + milestone complete) 2026-08-04 20:09:15 +00:00
Jon Chery e4adb3f09e docs(milestone): complete v1.17 — Strategic Direction, Leadership Metrics & Unified Story
---ci---
project: acdl
phase: 7
milestone: v1.17
status: complete
requirements:
  covered: [REQ-185..REQ-213]
  partial: []
---/ci---
2026-08-04 20:09:05 +00:00