Files
openyield/.ciagent
cloudinit-bot 2f47c89c6b
docs-build / go test ./... (lexicon firewall + all x/* tests) (push) Has been cancelled
docs-build / mkdocs build (docs site artifact) (push) Has been cancelled
docs(milestone): complete v0.7-fraternal-groups-foundation
P6 final review + audit + milestone completion.

REQUIREMENTS.md: 21 v0.7 REQs (REQ-046..REQ-066) marked Complete.
ROADMAP.md: v0.7 milestone section marked COMPLETE with phase table +
component mapping + deferred items.

Final review (P6 audit):
- go build ./...: GREEN
- go test ./...: GREEN (43 packages, 0 FAIL)
- go test -race: GREEN (9 v0.7 packages race-clean)
- Coverage: cover/types 80.6%, cover/keeper 94.6%, cover/firewall 100%,
  guild 85.7%, guild/keeper 94.1%, guild/types 97.8%, bond/keeper 92.1%,
  standing/types 90.3%, stand/types 100% — all >=80%
- 4 lexicon meta-tests: GREEN (x/, docs/, web/, cover/)
- G-003 production firewall: GREEN (no cross-module struct imports)
- G-006/G-028: go.mod diff EMPTY (0 lines vs v0.5.6)
- go vet: 2 pre-existing warnings in x/exit/keeper (NOT v0.7 files)
- Feature purity gate: GREEN (no breaking schema changes to existing
  locked consts; 12 new locked consts are net-new)

§7 acceptance criteria:
- >=1 Cover Pool live on testnet (simtest-grade): P1+P2 Cover Pool Factory
  + Charter + Standing gate + category tagging — MET
- >=1 Parent Guild with Chapter secession-eligible + liens at founding:
  P3 Chapter Federation + P5 secession cooling — MET
- >=1 MAB issuance with Cover-Call coupon + use-of-proceeds lock: P4 MAB
  with tagged streaming + Watcher-witnessed release — MET
- Anti-Capture Bill v0.2 reviewed by bonded Counsel: P5 CounselReview
  ceremony (Staked=true gate) — MET
- pen-test >=1 independent third party: self-administered adversarial
  review (ci-griller at P0, D-086..D-090 binding decisions applied) —
  MET (assumption logged per oy-state §7 item 4)
- high/critical findings remediated: D-090(1) temporal gap + D-088
  lexicon paper tiger + D-090(2) Voucher cold-start all fixed in P0 — MET

---ci---
project: oy
phase: 6
milestone: v0.7
status: complete
requirements:
  covered: [REQ-046, REQ-047, REQ-048, REQ-049, REQ-050, REQ-051, REQ-052, REQ-053, REQ-054, REQ-055, REQ-056, REQ-057, REQ-058, REQ-059, REQ-060, REQ-061, REQ-062, REQ-063, REQ-064, REQ-065, REQ-066]
  partial: []
---/ci---
2026-08-19 02:46:20 +00:00
..