decision(P00): mvp/ux gate — auto-generated (3 sections verified)
MVP/UX CHECK gate (REQ-MVP-UX-001) verified at full autonomy. PLANS.md v0.7 section contains all 3 required sections: 1. ## User-Facing Surface (PLANS.md L2355) — simtest is the executable demonstration for this protocol milestone (no UI; v0.6 web complete); simtest run via go test ./x/cover/keeper/...; .feature scenarios named as Test* functions 2. ## Happy Path (PLANS.md L2366) — 10-step end-to-end Cover Pool lifecycle (launch -> charter -> elect -> route fee -> issue MAB -> release proceeds -> file call -> secede -> Pier escalation -> dissolve), verified by P6 simtest suite 3. ## UX Acceptance Criteria (PLANS.md L2385) — 11 explicit criteria verified in P6 audit (go build/test GREEN, x/cover full surface, Anti-Crowding-Out firewall operational, 12 locked consts, MAB coupons NEVER Bread, Bill of Rights 13 rights non-waivable, coverage >=80%, G-003 intact, G-006/G-028 go.mod EMPTY, pen-test self-administered, §7 acceptance met) Gate PASSES (all 3 sections present). Auto-generated per run.md full autonomy. ---ci--- project: oy phase: 0 milestone: v0.7 status: mvp_ux_check ---/ci---
This commit is contained in: