Commit Graph

2 Commits

Author SHA1 Message Date
Praxis CI 93d33ecb0c feat(P01): SLICE-08+09+10 — secret wiring, bats tests (121), e2e verification
SLICE-08 (devops-engineer): .env.example updated with Proxmox deployment
  vars (documented, sourced from ~/coreci/.env.secrets per D-026),
  PRAXIS_CLIENT_DIST for StaticFiles, PRAXIS_SCENARIO. config.json
  secrets.scopes already extended in SPECIFY (proxmox + voice scopes).
SLICE-09 (devops-engineer): 10 bats test files (G-106 fix: 10 not 9)
  covering all proxmox scripts — 121 tests, 114 pass + 7 skipped (e2e).
  Mocked curl/pct/ssh; no live cluster needed for unit tests.
SLICE-10 (devops-engineer): e2e-deploy.sh — sources secrets from both
  coreci + praxis .env.secrets, runs full deploy, verifies /health +
  client HTML serving. REQ-DEPLOY-15 covered.

All 6 grill binding decisions addressed:
  G-101 MUST: GITEA_TOKEN baked into snippet (stage-snippet.sh)
  G-102 MUST: PRAXIS_DB_PATH env read (db/store.py + db/migrate.py)
  G-103 FIX:  all 16 env vars in injection list (install-service.sh)
  G-104 FIX:  health-check timeout 600s (health-check.sh)
  G-105 FIX:  Dockerfile copy ordering (pyproject before source)
  G-106 FIX:  bats test count = 10

REQ-DEPLOY-12, 14, 15 covered. All 20 REQ-IDs now implemented.

---ci---
project: praxis
phase: 1
milestone: v0.2
status: execute
slice: 08-10
wave: 4
---/ci---
2026-08-03 18:17:40 +00:00
Praxis CI 0df1ec391a docs(P00): create phase 1 plan — 10 slices, 4 waves, 34 tasks, 20/20 REQ coverage
PLAN.md: 998 lines (vertical-slice plan with wave ordering)
.gitignore: fix .env.example being ignored by .env.* pattern (D-038)

Wave 1: Dockerfile + docker-compose.yml + .dockerignore | FastAPI StaticFiles mount
Wave 2: PVE API layer (8 scripts) | health-check.sh
Wave 3: firstboot-hook.sh | install-service.sh + praxis.service | lxc-deploy.sh
Wave 4: secret wiring + .env.example | bats tests (11 files) | E2E verification

Persona load: devops-engineer 15 tasks, lead-developer 4, backend 4, data 2, frontend 0 (deactivated)

---ci---
project: praxis
phase: 0
milestone: v0.2
status: plan
---/ci---
2026-08-01 14:01:46 +00:00