---ci--- project: orca phase: 0 milestone: v0.6 status: specify ---/ci---
5.5 KiB
Roadmap: Orca
Milestone v0.1: Foundation — COMPLETE
- Phase 0: Project Initialization & Specification
- Phase 1: Core CLI Skeleton & Command Parsing
- Phase 2: Basic Node Management (Join/Leave)
- Phase 3: Simple Task Execution Engine
- Phase 4: Local State Persistence
- Phase 5: Basic Health Checking
- Phase 6: CoreCI Full Release Flow
Tagged v0.2.0 (next-minor per feature-milestone promotion rule).
Deferred to v0.2 (out of scope for v0.1)
- Multi-node scheduling (D-004 decision: single-node only in v0.1)
- mTLS for inter-node communication (REQ-011, REQ-023)
gosec+govulncheckin CI pipeline (REQ-014)iter.Seqstreaming job lists (REQ-022)- Frontend / devops personas (no web UI; CoreCI handles release)
Milestone v0.2: Networking, Observability, Security Hardening — COMPLETE (merged to main via v0.3)
Scope: extend v0.1 with secure cross-node transport, multi-node scheduling, richer CI security scanning, and streaming I/O.
- Phase 8: mTLS handshake + internal CA with CSR join (Wave 1) — shipped v0.2.1
- Phase 9: Multi-node scheduling & job dispatch (Wave 1) — shipped v0.2.2
- Phase 10:
gosec+govulncheck+ gitleaks in CI (Wave 2) — shipped v0.2.3 - Phase 11:
iter.Seqstreaming job/node lists (Wave 2) — completed in v0.3 P01 (shipped v0.3.1)
Milestone tag: v0.4.0 (shipped — v0.2 work merged to main via v0.3 milestone).
Per-phase tags: v0.2.1 (P01), v0.2.2 (P02), v0.2.3 (P03) — all shipped.
Milestone v0.3: Scheduling & Streaming Completion — COMPLETE
Scope: complete the two work items deferred from v0.2 that were not already shipped in P08-P10. A re-init SPECIFY codebase audit confirmed that REQ-014/027/028/029/031/037/039/040 all shipped in P08-P10 despite stale REQUIREMENTS.md marking them Pending. The remaining work is lean:
- Phase 0: Pre-execution (specify → clarify → research → plan → grill) — shipped v0.3.0
- Phase 1:
iter.Seqstreaming for--watchflags (REQ-022, REQ-030) — shipped v0.3.1 - Phase 2:
orca doctornetwork + db full implementation (REQ-032 completion) — shipped v0.3.2 - Phase 3: Final review + ship + audit (milestone release) — shipped v0.3.3
Milestone tag: v0.4.0 (next-minor per feature-milestone promotion rule).
Per-phase tags: v0.3.0 (P0), v0.3.1 (P01), v0.3.2 (P02), v0.3.3 (P03 final = milestone release).
Per .ciagent/RELEASE_POLICY.md, every phase tag produces a Gitea release.
Per-phase REQ coverage
-
P01 —
iter.Seqstreaming for--watchflags- REQ-022 (
iter.Seqfor streaming job lists, Go 1.25+) - REQ-030 (
--watchoutput format mode: table default vs streaming JSON per event) - Applies to both
orca job list --watchandorca node list --watch(D-024, per ARCHITECTURE.md CLI layer + D-017)
- REQ-022 (
-
P02 —
orca doctornetwork + db full implementation- REQ-032 (completion: network reachability via mTLS
/healthzprobe, db integrity viaPRAGMA integrity_check+ migration version) - Replaces
NetworkStubandDBStubfrom v0.2 P01
- REQ-032 (completion: network reachability via mTLS
v0.3 is a completion milestone, not a direction change
The vision ("minimalist, offline-first, CLI-first orchestration engine") is unchanged. v0.3 closes out the v0.2 deferrals and merges the accumulated v0.2 work to main.
Milestone v0.5: Distribution — COMPLETE
Scope: make Orca installable, distributable, and containerized. The engine functionality from v0.1–v0.3 is unchanged; this milestone is purely about delivery surface.
- Phase 0: Pre-execution (specify → clarify → research → plan) — shipped
v0.4.1(+ repo public) - Phase 1: Namespace unification (
ORCA_HOME+--system) (REQ-041, REQ-042) — shippedv0.4.2 - Phase 2:
install.sh+ in-place update + README quickstart (REQ-043, REQ-044) — shippedv0.4.3 - Phase 3: Docker release (Dockerfile + Gitea container registry) (REQ-046) — shipped
v0.4.4 - Phase 4: Final review + ship + audit (milestone release) — shipped
v0.4.5
Operational prerequisite (P0 ship): repo + org visibility flipped to public (REQ-045) — unauth releases API + asset download + docker pull all verified HTTP 200.
Milestone tag: v0.4.5 (final phase patch = milestone release per
feature-milestone promotion rule). Per-phase tags: v0.4.1…v0.4.5.
Milestone v0.6: Node Bootstrap & Proxmox
Scope: make orca init produce a fully working single-node cluster
(CA + server cert + DB + localhost node registered with auto-detected
OS), and add Proxmox 8 & 9 as a first-class remote node type joined
over SSH with least-privilege role delegation.
- Phase 0: Pre-execution (specify → clarify → research → plan → grill) — tag
v0.5.0 - Phase 1:
orca initfull bootstrap + localhost node + schema 0006 (REQ-047, REQ-048, REQ-049) — tagv0.5.1 - Phase 2: Proxmox SSH join + OrcaOperator role + sudoers allowlist (REQ-050, REQ-051) — tag
v0.5.2 - Phase 3:
doctor os+doctor proxmoxSSH probe + audit logging (REQ-052) — tagv0.5.3 - Phase 4: Final review + ship + audit (milestone release) — tag
v0.5.4
Milestone type: feature (P1/P2/P3 ship feat phases).
Milestone tag: v0.5.4 (final phase patch = milestone release per
feature-milestone promotion rule). Per-phase tags: v0.5.0…v0.5.4.
Tags run on the previous minor's patch line (v0.5.x) per
branch-strategy.md. The milestone branch label uses the milestone
number (milestone/v0.6-node-bootstrap-proxmox); no separate minor
tag is created.