Files
orca/.ciagent/ROADMAP.md
T
Jon Chery 38220192bb docs(P00): complete pre-execution phase (specify→clarify→research→plan→grill)
---ci---
project: orca
phase: 0
milestone: v0.3
status: complete
---/ci---

Phase 0 complete. v0.3 milestone established with 2 execution phases:
P01 (iter.Seq streaming) and P02 (doctor network+db completion).
3 binding grill verdicts applied to plan. Ready for execution.
2026-08-01 14:25:28 +00:00

3.2 KiB

Roadmap: Orca

Milestone v0.1: Foundation — COMPLETE

  • Phase 0: Project Initialization & Specification
  • Phase 1: Core CLI Skeleton & Command Parsing
  • Phase 2: Basic Node Management (Join/Leave)
  • Phase 3: Simple Task Execution Engine
  • Phase 4: Local State Persistence
  • Phase 5: Basic Health Checking
  • Phase 6: CoreCI Full Release Flow

Tagged v0.2.0 (next-minor per feature-milestone promotion rule).

Deferred to v0.2 (out of scope for v0.1)

  • Multi-node scheduling (D-004 decision: single-node only in v0.1)
  • mTLS for inter-node communication (REQ-011, REQ-023)
  • gosec + govulncheck in CI pipeline (REQ-014)
  • iter.Seq streaming job lists (REQ-022)
  • Frontend / devops personas (no web UI; CoreCI handles release)

Milestone v0.2: Networking, Observability, Security Hardening — FUNCTIONALLY COMPLETE (pending merge to main)

Scope: extend v0.1 with secure cross-node transport, multi-node scheduling, richer CI security scanning, and streaming I/O.

  • Phase 8: mTLS handshake + internal CA with CSR join (Wave 1) — shipped v0.2.1
  • Phase 9: Multi-node scheduling & job dispatch (Wave 1) — shipped v0.2.2
  • Phase 10: gosec + govulncheck + gitleaks in CI (Wave 2) — shipped v0.2.3
  • Phase 11: iter.Seq streaming job/node lists (Wave 2) — deferred to v0.3 P01

Milestone tag: v0.3.0 (next-minor per feature-milestone promotion rule) — pending merge to main.

Per-phase tags: v0.2.1 (P01), v0.2.2 (P02), v0.2.3 (P03) — all shipped.

Milestone v0.3: Scheduling & Streaming Completion — IN PROGRESS

Scope: complete the two work items deferred from v0.2 that were not already shipped in P08-P10. A re-init SPECIFY codebase audit confirmed that REQ-014/027/028/029/031/037/039/040 all shipped in P08-P10 despite stale REQUIREMENTS.md marking them Pending. The remaining work is lean:

  • Phase 0: Pre-execution (specify → clarify → research → plan)
  • Phase 1: iter.Seq streaming for --watch flags (REQ-022, REQ-030)
  • Phase 2: orca doctor network + db full implementation (REQ-032 completion)
  • Phase 3: Final review + ship + audit (milestone release)

Target milestone tag: v0.4.0 (next-minor per feature-milestone promotion rule).

Per-phase tags: v0.3.0 (P0), v0.3.1 (P01), v0.3.2 (P02), v0.3.3 (P03 final = milestone release). Per .ciagent/RELEASE_POLICY.md, every phase tag produces a Gitea release.

Per-phase REQ coverage

  • P01 — iter.Seq streaming for --watch flags

    • REQ-022 (iter.Seq for streaming job lists, Go 1.25+)
    • REQ-030 (--watch output format mode: table default vs streaming JSON per event)
    • Applies to both orca job list --watch and orca node list --watch (D-024, per ARCHITECTURE.md CLI layer + D-017)
  • P02 — orca doctor network + db full implementation

    • REQ-032 (completion: network reachability via mTLS /healthz probe, db integrity via PRAGMA integrity_check + migration version)
    • Replaces NetworkStub and DBStub from v0.2 P01

v0.3 is a completion milestone, not a direction change

The vision ("minimalist, offline-first, CLI-first orchestration engine") is unchanged. v0.3 closes out the v0.2 deferrals and merges the accumulated v0.2 work to main.