Commit Graph

2 Commits

Author SHA1 Message Date
Jon Chery 1ee82fc2e2 docs(P00): ideation - 34 ideas accepted
v0.2 IDEATE stage. 29 new ideas generated (10 Tier 1 mechanical + 11
Tier 2 backend-enriched + 8 Tier 3 cross-project) plus 6 research-stage
candidates (REQ-cand-A..F from commit 08d321f) = 35 considered. Under
full autonomy, all 35 with confidence >= 0.60 are auto-accepted; 1
explicitly deferred to v0.3 (I-308 pprof). 34 accepted into v0.2.

Resulting net-new REQs (REQ-025..REQ-040) span P01-P04:
- P01 (mTLS): REQ-025 (cert rotation history), REQ-026 (CA fingerprint
  pinning), REQ-032 (orca doctor), REQ-033 (file mode enforcement),
  REQ-034 (rotation alarm), REQ-035 (cert show redaction), REQ-036
  (SAN validation), REQ-038 (mTLS failure log fields)
- P02 (multi-node): REQ-028 (NodeCapacity HCL schema, P02 enabler),
  REQ-037 (X-Orca-Idempotency-Key)
- P03 (security CI): REQ-027 (govulncheck offline mode -- changes P03
  scope: CI must not call vuln.go.dev), REQ-029 (gitleaks baseline for
  pre-existing .env leak), REQ-039 (.gitleaks.toml stopwords),
  REQ-040 (.golangci.yml)
- P04 (iter.Seq): REQ-030 (--watch --json mode)
- Cross-cutting: REQ-031 (go test -race)

Total v0.2 REQs: 20 (4 carried from v0.1 + 16 net-new).

ARCHITECTURE.md: added `internal/doctor/` component (§5) with
orca doctor {cert,network,db} subcommands; ASCII diagram updated.
ROADMAP.md: per-phase REQ coverage matrix added; P03 scope change
documented (govulncheck offline mode).
PROJECT.md: unchanged (vision is stable).

---ci---
project: orca
phase: 0
milestone: v0.2
status: ideate
---/ci---
2026-06-03 21:03:59 +00:00
cloudinit-bot be9afa2d2c ship: v0.1 Foundation milestone complete (#1) 2026-06-03 20:08:57 +00:00