Operator decision (resolves grill C-04 + escalation E-03): keep 2 milestones
(v0.9 + v0.10), keep all phases (40 total, exceeds 35 soft limit), v1.0 is
UAT-gated and cut as a separate tag (v1.0.0) after v0.10 completion per
operator sign-off — not a separate milestone.
Relabels all v1.0 milestone references to v0.10 across ROADMAP, REQUIREMENTS,
GRILL_v0.9, IDEATION_v0.9, PRD_v0.9, PROJECT. Phase content unchanged; only
the milestone label moves. Historical grill narrative (the original PRD §23
counts and the E-03 auto-split reasoning) preserved verbatim for audit
integrity. C-04 and E-03 marked RESOLVED in GRILL_v0.9.md.
Milestone structure:
- v0.9: Re-architecture Foundation & Workloads (13 phases P00..P0X)
- v0.10: Production Hardening (19 phases P00..P16, milestone tag v0.10.0)
- v1.0: UAT-gated production-ready cut (separate v1.0.0 tag, not a milestone)
verify-reqs: 90 requirements consistent.
---ci---
project: orca
phase: 0
milestone: v0.9
status: complete
gate: C-04 resolved
---/ci---
Adopts the v0.9/v1.0 PRD (.ciagent/PRD_v0.9.md) that supersedes the shipped
v0.1-v0.8 architecture. The re-architecture is justified by a six-part
evidence basis recorded in the PROJECT.md Supersession Table:
operational daemon failure, external step-ca mandate, multi-tenancy
requirement, WASM workload requirement, SSH-push deployment target,
and vision correction.
Appends 30 net-new requirements (REQ-061..REQ-090) to REQUIREMENTS.md,
the v0.9 (13 phases) + v1.0 (19 phases) reordered plan to ROADMAP.md,
the AD-series supersession table to PROJECT.md + ARCHITECTURE.md, and
reactivates security-engineer + network-engineer + devops-engineer
personas (implements grill C-05).
---ci---
project: orca
phase: 0
milestone: v0.9
status: specify
---/ci---