Jon Chery 40b5e781ce docs(P00): resolve C-04 — relabel v1.0→v0.10 milestone, keep all 40 phases, v1.0 UAT-gated
Operator decision (resolves grill C-04 + escalation E-03): keep 2 milestones
(v0.9 + v0.10), keep all phases (40 total, exceeds 35 soft limit), v1.0 is
UAT-gated and cut as a separate tag (v1.0.0) after v0.10 completion per
operator sign-off — not a separate milestone.

Relabels all v1.0 milestone references to v0.10 across ROADMAP, REQUIREMENTS,
GRILL_v0.9, IDEATION_v0.9, PRD_v0.9, PROJECT. Phase content unchanged; only
the milestone label moves. Historical grill narrative (the original PRD §23
counts and the E-03 auto-split reasoning) preserved verbatim for audit
integrity. C-04 and E-03 marked RESOLVED in GRILL_v0.9.md.

Milestone structure:
- v0.9: Re-architecture Foundation & Workloads (13 phases P00..P0X)
- v0.10: Production Hardening (19 phases P00..P16, milestone tag v0.10.0)
- v1.0: UAT-gated production-ready cut (separate v1.0.0 tag, not a milestone)

verify-reqs: 90 requirements consistent.

---ci---
project: orca
phase: 0
milestone: v0.9
status: complete
gate: C-04 resolved
---/ci---
2026-08-05 16:08:33 +00:00
Jon Chery 8631a698ce docs(P00): ideate v0.9 — 30 ideas (REQ-061..090), 3 tiers, 7 phase-reorder flags
Generates 30 ideation ideas across mechanical (12), backend-enriched (12),
and cross-cutting (6) tiers, all accepted at >=0.60 confidence. Mapped to
REQ-061..REQ-090. Highest-impact: I-C-001 (migration ordering, 0.88) and
I-C-006 (dual-write window, 0.86) reshape v0.9 execution strategy. Highest
blast radius: I-M-010 (path resolver, 0.84) touches every adaptable package.
Most under-specified by PRD: I-B-003 (lead applier execution model, 0.78).
Seven phase-reordering flags against PRD section 23: add v0.9-P00 deprecation
pre-phase, split P0a into P0a1/P0a2, design SSH-push before P01, fold emitter
into P0c, add txn-design spike in P0.9-P00, bootstrap test infra in P00,
fold persona reactivation + doc banners into P00.

---ci---
project: orca
phase: 0
milestone: v0.9
status: ideate
---/ci---