Operator decision (resolves grill C-04 + escalation E-03): keep 2 milestones
(v0.9 + v0.10), keep all phases (40 total, exceeds 35 soft limit), v1.0 is
UAT-gated and cut as a separate tag (v1.0.0) after v0.10 completion per
operator sign-off — not a separate milestone.
Relabels all v1.0 milestone references to v0.10 across ROADMAP, REQUIREMENTS,
GRILL_v0.9, IDEATION_v0.9, PRD_v0.9, PROJECT. Phase content unchanged; only
the milestone label moves. Historical grill narrative (the original PRD §23
counts and the E-03 auto-split reasoning) preserved verbatim for audit
integrity. C-04 and E-03 marked RESOLVED in GRILL_v0.9.md.
Milestone structure:
- v0.9: Re-architecture Foundation & Workloads (13 phases P00..P0X)
- v0.10: Production Hardening (19 phases P00..P16, milestone tag v0.10.0)
- v1.0: UAT-gated production-ready cut (separate v1.0.0 tag, not a milestone)
verify-reqs: 90 requirements consistent.
---ci---
project: orca
phase: 0
milestone: v0.9
status: complete
gate: C-04 resolved
---/ci---
Runs the 9-axis adversarial grill on the v0.9/v1.0 re-architecture. Overall
verdict REPLAN (0.74) on 3 axes (Scope, Migration, Re-architecture
Justification). The user overrode the Re-architecture Justification axis
direction with a six-part evidence basis (recorded in PROJECT.md). The
remaining mechanics are adopted: 19 binding conditions (C-01..C-19) as
phase gates, 10 phase challenges (PC-01..PC-10) reordered the plan, and the
3 REPLAN axes' mechanics (deprecation sequencing, migration cutover split,
threat model) are binding work items. C-03 (check-in PRD) resolved. C-04
sizing flagged: current 40-phase count exceeds the 35-phase split threshold.
---ci---
project: orca
phase: 0
milestone: v0.9
status: grill
---/ci---