docs(P00): complete v0.7 pre-execution phase — shipped v0.6.0
Tag + merge + Gitea release #399 all succeeded. Phase 0 complete. ---ci--- project: orca phase: 0 milestone: v0.7 status: complete ---/ci---
This commit is contained in:
+1
-1
@@ -119,7 +119,7 @@ Scope: NFR milestone closing gaps surfaced by the v0.7 IDEATE stage —
|
||||
an unreachable command tree, a missing config file layer, low test
|
||||
coverage in core packages, and the long-deferred pprof endpoint.
|
||||
|
||||
- [ ] Phase 0: Pre-execution (specify → clarify → research → ideate → plan) — tag `v0.6.0`
|
||||
- [x] Phase 0: Pre-execution (specify → clarify → research → ideate → plan) — tag `v0.6.0` (shipped)
|
||||
- [ ] Phase 1: Register `orca cert` command tree + cert_repo tests (REQ-053) — tag `v0.6.1`
|
||||
- [ ] Phase 2: HCL config file parsing — `internal/config` package (REQ-054) — tag `v0.6.2`
|
||||
- [ ] Phase 3: Test coverage uplift — engine/transport/proxmox/audit ≥ 50% (REQ-055) — tag `v0.6.3`
|
||||
|
||||
Reference in New Issue
Block a user