docs(milestone): complete hardening-completion
v0.7 milestone complete. All 4 execution phases + final review shipped. REQ-053..056 all complete. Tags v0.6.0..v0.6.5 on v0.6.x patch line. Merged milestone/v0.7-hardening-completion → main. ---ci--- project: orca phase: 5 milestone: v0.7 status: complete requirements: covered: [REQ-053, REQ-054, REQ-055, REQ-056] partial: [] ---/ci---
This commit is contained in:
@@ -1,11 +1,11 @@
|
||||
{
|
||||
"phase": 4,
|
||||
"phase": 5,
|
||||
"stage": "complete",
|
||||
"milestone": "v0.7",
|
||||
"milestone_slug": "hardening-completion",
|
||||
"phase_role": "execution",
|
||||
"phase_role": "final",
|
||||
"attempts": 0,
|
||||
"updated_at": "2026-08-04T00:25:00Z",
|
||||
"milestone_complete": false,
|
||||
"updated_at": "2026-08-04T00:30:00Z",
|
||||
"milestone_complete": true,
|
||||
"next_milestone": null
|
||||
}
|
||||
@@ -131,3 +131,19 @@ REQ-047..052 all complete.
|
||||
| REQ-054 | HCL config file parsing: `internal/config` package loads `~/.orca/config.hcl` / `/etc/orca/orca.hcl` (keys: db_path, listen_addr, ca_path, server_cert_path, server_key_path, node_capacity); merge precedence flag > env > file > default; `--config` flag on root command | High | **v0.7 P2** | **Complete** (P2 shipped v0.6.2) |
|
||||
| REQ-055 | Test coverage uplift: every package ≥ 50% — adds tests for `internal/engine` (executor, dispatcher, peer), `internal/transport` (mtls, dispatch, handshake_log), `internal/proxmox` (bootstrap SSH path), `internal/audit` | Medium | **v0.7 P3** | **Complete** (P3 shipped v0.6.3; engine 65.1%, transport 84.6%, proxmox 82.7%, audit 100%) |
|
||||
| REQ-056 | `--pprof <addr>` opt-in flag on `orca daemon` (default disabled); `net/http/pprof` mounted on a separate mux, never on the mTLS daemon listener | Low | **v0.7 P4** | **Complete** (P4 shipped v0.6.4; I-308 implemented) |
|
||||
|
||||
## v0.7 Milestone Summary
|
||||
|
||||
**Status: Complete** — all 4 execution phases + final review shipped.
|
||||
P0 (v0.6.0), P1 (v0.6.1), P2 (v0.6.2), P3 (v0.6.3), P4 (v0.6.4),
|
||||
P5 final (v0.6.5). REQ-053..056 all complete.
|
||||
|
||||
- **P0** (v0.6.0): pre-execution (specify → clarify → research → ideate → plan). 5 decisions (D-038..D-042), 5 ADs (AD-022..AD-026), 13 ideation recommendations.
|
||||
- **P1** (v0.6.1): `orca cert` command tree registered + cert_repo tests + migration 0007 (REQ-053).
|
||||
- **P2** (v0.6.2): HCL config file parsing — `internal/config` package + `--config` flag (REQ-054).
|
||||
- **P3** (v0.6.3): test coverage uplift — engine 65.1%, transport 84.6%, proxmox 82.7%, audit 100% + dispatch.go EOF bug fix (REQ-055).
|
||||
- **P4** (v0.6.4): `--pprof` opt-in on `orca daemon` (REQ-056, I-308 implemented).
|
||||
- **P5** (v0.6.5): final review + audit + milestone release. Review fixes: PERSONAS.md body, config --addr precedence, migration 0007 dedup.
|
||||
|
||||
**Milestone type**: NFR (all phases fix/test/chore; no `feat` phases).
|
||||
**Milestone tag**: `v0.6.5` (final phase patch = milestone release per NFR progressive-patch rule). Tags v0.6.0..v0.6.5 on v0.6.x patch line.
|
||||
|
||||
+2
-2
@@ -113,7 +113,7 @@ branch-strategy.md. The milestone branch label uses the milestone
|
||||
number (`milestone/v0.6-node-bootstrap-proxmox`); no separate minor
|
||||
tag is created.
|
||||
|
||||
## Milestone v0.7: Hardening & Completion
|
||||
## Milestone v0.7: Hardening & Completion — **COMPLETE**
|
||||
|
||||
Scope: NFR milestone closing gaps surfaced by the v0.7 IDEATE stage —
|
||||
an unreachable command tree, a missing config file layer, low test
|
||||
@@ -124,7 +124,7 @@ coverage in core packages, and the long-deferred pprof endpoint.
|
||||
- [x] Phase 2: HCL config file parsing — `internal/config` package (REQ-054) — tag `v0.6.2` (shipped)
|
||||
- [x] Phase 3: Test coverage uplift — engine/transport/proxmox/audit ≥ 50% (REQ-055) — tag `v0.6.3` (shipped)
|
||||
- [x] Phase 4: `--pprof` opt-in on `orca daemon` (REQ-056) — tag `v0.6.4` (shipped)
|
||||
- [ ] Phase 5: Final review + ship + audit (milestone release) — tag `v0.6.5`
|
||||
- [x] Phase 5: Final review + ship + audit (milestone release) — tag `v0.6.5` (shipped)
|
||||
|
||||
**Milestone type**: NFR (all phases are fix/test/chore; no `feat` phases).
|
||||
**Milestone tag**: `v0.6.5` (final phase patch = milestone release per
|
||||
|
||||