---ci---
phase: 3
milestone: v0.3.0
status: complete
decisions:
- id: D-006
decision: Multi-project via .ci/<slug>/ subdirectories and config.json registry
rationale: Backward compatible migration from flat files; slug-based namespacing for branches and commits
confidence: 0.92
alternatives: [Git worktrees, Separate repos with subtrees]
- id: D-007
decision: NFR milestones use progressive patch versioning (no minor tag)
rationale: NFR phases (fix/chore/docs/perf/refactor/test) don't represent feature delivery; patch increments reflect incremental improvement only
confidence: 0.90
alternatives: [Treat all milestones uniformly, Skip versioning for NFR]
- id: D-008
decision: Phase context reset via git checkpoint + fresh agent spawn
rationale: Git-native architecture makes full state serialization safe; fresh context prevents accumulated conversation drift
confidence: 0.88
alternatives: [Context compaction, Sliding window summarization]
- id: D-009
decision: Install via both npm postinstall and standalone bash script
rationale: Postinstall only fires on npm install -g; standalone script covers manual/cloned installs
confidence: 0.95
alternatives: [Postinstall only, Makefile target]
---/ci---
Source code:
- Added ProjectEntry, projects[], active_project to CIConfig
- Added project?: string to CiMetadata, CommitScope, all commit input types
- CiFiles: multi-project support (projectSlug, listProjects, addProject, migrateFlatToProject, isNfrMilestone)
- GitContext: projectSlug support, detectProjectFromCommit(), isNfrMilestone()
- GitBranch: project-prefixed branch naming via prefix()
- commit-builder/parser: project field in ---ci--- blocks
- config.ts: initCI() accepts projectSlug/projectName
- Implemented parseRoadmapMd phase parsing
- 284 tests passing (66 new tests)
Install scripts:
- scripts/install.sh: Standalone bash installer
- scripts/postinstall.js: npm postinstall (global installs only)
OpenCode integration:
- All 18 agents updated with multi-project project_context
- All 11 workflows updated with Step 0: Confirm Active Project
- All 5 references updated (branch-strategy, ci-files-discipline, commit-schema, decision-engine, git-context-loading)
- All 3 contexts updated (dev, research, review)
- VERSION bumped to 0.3.0
Package:
- Added files field, postinstall script, install script alias
- Version bumped to 0.3.0
2.3 KiB
description
| description |
|---|
| Rollback CI phase — revert the last phase or specified phase by resetting to its pre-phase state |
CI Rollback
Rollback a CI phase by reverting to the state before the phase started. Uses git to find the exact commit to reset to.
Usage: ci-rollback [phase_number]
If no phase specified, rolls back the current (most recent) phase.
Step 0: Confirm Active Project
Check ci listProjects() or read .ci/config.json to determine if multi-project mode is active.
If .ci/config.json has projects[] with length > 0:
- Confirm
active_projectis correct for this rollback - If not, set it with
ci setActiveProject(<slug>) - Identify project-scoped branches (prefixed with
<slug>/) - All commit messages must include
project: <slug>in---ci---block
If single-project mode: proceed with existing conventions (branches without slug prefix).
Step 1: Load Git Context
git log --max-count=30
git branch -a
Find the phase branch and its merge commit.
Step 2: Identify Rollback Point
For the specified phase:
- Find the merge commit that completed the phase
- Find the commit just before the phase branch was created
- This is the rollback point
git log --grep="P##" --format="%H %s" | head -20
Step 3: Confirm (Safety Gate)
Even in full autonomy mode, destructive operations need confirmation:
⚠ ROLLBACK: This will revert Phase [N] — [name]
Rollback point: [commit hash] [subject]
Changes to be lost: [N] commits
Proceed? (y/n)
Wait for confirmation. This is a safety gate — always confirm destructive operations.
Step 4: Execute Rollback
git revert [merge_commit_hash]
Or for a hard rollback (not recommended, only if explicitly requested):
git reset --hard [rollback_point]
Step 5: Update State
- Delete the phase branch (if not already removed)
- Update
.ci/REQUIREMENTS.md— mark phase requirements as blocked - Update
.ci/ROADMAP.md— mark phase as not_started
Commit the rollback:
chore(P##): rollback [phase-name] — [reason]
---ci---
phase: [N]
milestone: [vX.X]
status: specify
escalations:
- id: E-XXX
type: rollback
description: Phase rolled back
resolution: auto
---/ci---
Step 6: Report
Report rollback complete, rollback point, and next steps.