Files
acdl/docs
Jon Chery 707a7dbe9b
Nova Slides Render / render (push) Failing after 1m3s
docs(P2): slides source-of-truth — rename + restructure + rewrite (REQ-245,248,249,252)
Rename all 5 deck files nova-no-humans-platform* →
nova-autonomous-cloud-delivery* (source, marp, html, pptx, talking-points).

Rewrite the source of truth to 18 main + 1 appendix slides, 4-beat arc
(Problem → Solution → Proof → Roadmap + Ask). All 33 review notes applied:

- Slide 1 'The Problem' (items 3,4,5,7,9): broader problem framing — devs
  writing terraform, destructive changes, AI-era 0-day pace, bandwidth
  gaps, tribal knowledge/rockstar operator. No arc. No '18 capabilities
  verified'. Not 'humans are the problem'.
- Slide 2 'Nova's Vision' (item 11): 'invisible' → 'visible' (operations
  become visible — recurring theme); polish for technical audience.
- Slide 3 'Strategic Objectives + Anti-Goals' (items 12,13,14,15,16,17,
  18): only Obj+Anti-Goals; provable trust = deterministic scripts
  (functions without AI); ROI = 4 CTO metrics (Lead Time, Vuln Count,
  MTTR, Spend); drop anti-goals 1,4,5; add 'not upstream dev platform',
  'not PDLC replacement'; obj #4 = integration objective; reword benefit.
- Slide 4 'Scope' (item 29): moved up, refined.
- Slide 5 'RACI' (item 30): moved up; add Quality Engineering column;
  reassign A from Platform → QE/SRE; rename Release Mgmt → SRE; split
  release attestation (Quality attestation + Production readiness).
- Slide 6 'Pipeline' (item 20): Checkov on static code before plan;
  Wiz-or-Checkov on plan; never both.
- Slide 7 'Decision Ledger' (items 21,22): drop D-121/122/132; 'AI
  decisions = automated decisions'; value = immutable/queryable/
  accountable, not sqlite/hash-chain.
- Slide 8 'Attestation Matrix' (item 23): drop bullets below table; add
  Description column per concern; drop 'operator-supplied' label.
- Slide 9 'Telemetry & Live Ops' (item 25): expand on value; drop
  D-120/125/126; expand on PowerBI live ops dashboard.
- Slide 10 'Decision Ledger + Attestation Coverage' (item 27):
  mandatory by design; no prod change without either; queryable for
  auditing; full traceability.
- Slide 11 'Cost & ROI': minor polish; 4 CTO metrics referenced.
- Slide 12 'What's Deferred' (items 10,19): remove all D-IDs; plain-
  language blockers; no status column.
- Slide 13 'Roadmap to the North Star' (items 10,19): drop D-IDs; no
  status column; timeframe-based roadmap.
- Slide 14 '12-Month Product Roadmap' (item 24): drop planned badges.
- Slide 15 'Quarter-by-Quarter' (item 24): drop badges.
- Slide 16 'Atelier (1/2)' (item 31): split — Skills + MCP server overview.
- Slide 17 'Atelier (2/2)' (item 31): split — agentic validation beyond
  deterministic scanners + vendoring.
- Slide 18 'Recap + Ask': refresh recap to 4-beat structure.
- Appendix A1 'Metrics Glossary' (item 32): kept; theme CSS fix in P3.
- Global (items 6,10,24,2): tech-leadership benefits; no D-###/REQ-###/
  .py paths in audience slides; no badges; no version in footer; final
  'less is more' prose pass.

Removed: old Slide 10 (Capability Health), old Slide 12 (Zero-Touch),
old Appendix A2 (Operating Model & Cost). Slide 5 first table removed.

---ci---
project: acdl
phase: 2
milestone: v1.21
status: execute
phase_role: execution
---/ci---
2026-08-11 13:59:30 +00:00
..