707a7dbe9b
Nova Slides Render / render (push) Failing after 1m3s
Rename all 5 deck files nova-no-humans-platform* → nova-autonomous-cloud-delivery* (source, marp, html, pptx, talking-points). Rewrite the source of truth to 18 main + 1 appendix slides, 4-beat arc (Problem → Solution → Proof → Roadmap + Ask). All 33 review notes applied: - Slide 1 'The Problem' (items 3,4,5,7,9): broader problem framing — devs writing terraform, destructive changes, AI-era 0-day pace, bandwidth gaps, tribal knowledge/rockstar operator. No arc. No '18 capabilities verified'. Not 'humans are the problem'. - Slide 2 'Nova's Vision' (item 11): 'invisible' → 'visible' (operations become visible — recurring theme); polish for technical audience. - Slide 3 'Strategic Objectives + Anti-Goals' (items 12,13,14,15,16,17, 18): only Obj+Anti-Goals; provable trust = deterministic scripts (functions without AI); ROI = 4 CTO metrics (Lead Time, Vuln Count, MTTR, Spend); drop anti-goals 1,4,5; add 'not upstream dev platform', 'not PDLC replacement'; obj #4 = integration objective; reword benefit. - Slide 4 'Scope' (item 29): moved up, refined. - Slide 5 'RACI' (item 30): moved up; add Quality Engineering column; reassign A from Platform → QE/SRE; rename Release Mgmt → SRE; split release attestation (Quality attestation + Production readiness). - Slide 6 'Pipeline' (item 20): Checkov on static code before plan; Wiz-or-Checkov on plan; never both. - Slide 7 'Decision Ledger' (items 21,22): drop D-121/122/132; 'AI decisions = automated decisions'; value = immutable/queryable/ accountable, not sqlite/hash-chain. - Slide 8 'Attestation Matrix' (item 23): drop bullets below table; add Description column per concern; drop 'operator-supplied' label. - Slide 9 'Telemetry & Live Ops' (item 25): expand on value; drop D-120/125/126; expand on PowerBI live ops dashboard. - Slide 10 'Decision Ledger + Attestation Coverage' (item 27): mandatory by design; no prod change without either; queryable for auditing; full traceability. - Slide 11 'Cost & ROI': minor polish; 4 CTO metrics referenced. - Slide 12 'What's Deferred' (items 10,19): remove all D-IDs; plain- language blockers; no status column. - Slide 13 'Roadmap to the North Star' (items 10,19): drop D-IDs; no status column; timeframe-based roadmap. - Slide 14 '12-Month Product Roadmap' (item 24): drop planned badges. - Slide 15 'Quarter-by-Quarter' (item 24): drop badges. - Slide 16 'Atelier (1/2)' (item 31): split — Skills + MCP server overview. - Slide 17 'Atelier (2/2)' (item 31): split — agentic validation beyond deterministic scanners + vendoring. - Slide 18 'Recap + Ask': refresh recap to 4-beat structure. - Appendix A1 'Metrics Glossary' (item 32): kept; theme CSS fix in P3. - Global (items 6,10,24,2): tech-leadership benefits; no D-###/REQ-###/ .py paths in audience slides; no badges; no version in footer; final 'less is more' prose pass. Removed: old Slide 10 (Capability Health), old Slide 12 (Zero-Touch), old Appendix A2 (Operating Model & Cost). Slide 5 first table removed. ---ci--- project: acdl phase: 2 milestone: v1.21 status: execute phase_role: execution ---/ci---