d6b192307a
---ci--- project: acdl phase: 0 milestone: v1.1 status: complete requirements: covered: [REQ-16, REQ-17, REQ-18, REQ-19, REQ-20, REQ-21, REQ-22, REQ-23, REQ-24, REQ-25, REQ-26, REQ-27, REQ-28] partial: [] ---/ci--- v1.1 milestone COMPLETE. All 5 phases (06-10) shipped + verified: - v1.1.1 archive-demo-and-reorient (Phase 06) - v1.1.2 architecture-v1-finalization (Phase 07, REQ-16..22) - v1.1.3 aws-bootstrap (Phase 08, REQ-23) - v1.1.4 v1-spike-ir-and-l1-and-adapter (Phase 09, REQ-24/26) - v1.1.5 v1-spike-l2-and-contract-e2e (Phase 10, REQ-25/27/28) Review: READY TO SHIP (0 P0, 1 P1 carried-forward non-blocking). Milestone tag: v1.2.0 (feature milestone, next minor per ship.md). The end-to-end spike pipeline proves the IR commitments hold (REQ-28): the adapter is the only substrate-specific code; the L1 content, contract YML, resolver, confidence signal, and outbox writer are substrate-agnostic.