7585c828f0
9 requirements implemented across presentation decks and project docs: 1. DX closing slide: added 'Infrastructure as a utility, not a craft' bullet to convey the full vision (infrastructure consumed, not maintained; platform compounds value over time). 2. PW Problem slide: 'moving a merged change' → 'promoting a change'. 3. PW Problem slide: added 'Red tape' and 'Scalability without increasing headcount' bullets (4 frictions, not 2). 4. PW Roadmap slide: redesigned with side-by-side HTML table layout (Testing | Planned), 16px font, no overflow. 5. PW deck: added new slide 'What This Platform Is — and Isn't' after North Star (sovereign boundary, infrastructure as utility, 4 anti-goals). PW deck now 16 slides (was 15). 6. Maturity nomenclature: 'Available today'/'shipped' → 'Testing' across both decks + source markdown. New .testing badge (blue/teal #DBEAFE). Roadmap title: 'Testing vs. Planned'. The platform has 0 consumer adoption — 'shipped' was inaccurate. 7. Global: 'substrate' → 'engine' across entire project (88 matches, 30+ files including .ciagent/, docs/, modules/, adapters/, schemas/, code). 8. Presentation files only: 'forge' → 'VCS' / 'version control system' (6 occurrences in 4 files). 'forge' retained in all technical docs and code as the industry-standard term. 9. New .agentic badge (purple/violet #EDE9FE) appended to agentic features in both decks: confidence signal, autonomous dev, pattern recognition, dynamic module creation, citizen developer surface, auto-promotion. Also: Change Request ID format changed from 'CR-2026-001' to 'CHG0678912' across presentation files, consumer guide, and test fixtures. HTML re-rendered. PPTX rendered for release upload. ---ci--- phase: 48 milestone: v1.9 status: complete requirements: covered: [] partial: [] ---/ci---