ec74060664
--- ci--- project: acdl phase: 68 milestone: v1.12 status: execute --- /ci--- Source-of-truth markdown for both decks synced to verified reality: - Re-verification headers -> 22/22 Verified (v1.11 lifecycle + v1.12 P67 fix), v1.10 '6 deploy-unverified (IAM drift)' disclosed as closed. - A4 (PW) verification status: '11 capabilities testing' -> '22/22 Verified via lifecycle pipeline + regression gate'. - De-duplicated repeated story-beat intro lines (PW slides 3-10, A1). - Version refs @v1.10 -> @v1.11 in deck examples. - road-to-north-star.mmd re-rendered: v1.10 no longer 'NEXT'; v1.11-v1.12 lifecycle testing + presentation refine (22/22 Verified + torn down to zero-cost) is the current phase; v2.0 is NEXT. - New A6 'Operating Model & Cost' in both decks: real COST.md figures (/usr/bin/bash.001883/8d, ~/usr/bin/bash.007/mo, S3-dominated), zero-cost steady state, D-096 teardown, + pre-mortem reference (PRE_MORTEM.md: 4 failure modes + structural mitigations). - New A7 'Verified by Construction' in both decks: the two v1.11 architectural pillars (stateless adapter 918->~80 lines; pipeline-driven lifecycle testing — the green cell IS verification) + the v1.12 plan-only default (ACDL_LIFECYCLE_MODE flag, REQ-134). - Appendix TOCs updated (5 -> 7 sections). Marp + HTML + talking points re-synthesized in P69 (next).