Files
acdl/docs
Jon Chery e33d6c890f docs(P69): re-synthesize Marp decks + talking points + re-render HTML (22/22 Verified)
---
ci---
project: acdl
phase: 69
milestone: v1.12
status: execute
---
/ci---

Re-synthesized both Marp decks from the v1.12-synced source markdown:
- Both decks now 10 main + 7 appendix = 17 slides (was 10 + 6 = 16).
- New A6 'Operating Model & Cost': real COST.md figures table (/usr/bin/bash.001883/
  8d, ~/usr/bin/bash.007/mo, S3-dominated), zero-cost steady state, D-096 teardown,
  + pre-mortem reference (PRE_MORTEM.md 4 failure modes), + plan-only
  default bullet (ACDL_LIFECYCLE_MODE=full override, REQ-134).
- New A7 'Verified by Construction': stateless adapter (918->~80 lines,
  per-module terraform/ dirs, P67 dedup fix) + pipeline-driven lifecycle
  testing (green cell = verification, plan-only default, 22/22 Verified).
- 'Testing vs. Planned' (PW slide 11 + A4): '11 capabilities' -> '22/22
  Verified via lifecycle pipeline + regression gate'; the
  'deploy-unverified (IAM drift)' Verification Coverage line removed
  and replaced with the honest 'v1.10 status is closed' disclosure.
- Version refs @v1.10 -> @v1.11 across both decks.
- YAML frontmatter (S&P Global Energy theme), badge system, image refs,
  story-beat intros preserved verbatim.

Re-distilled both talking-points files to match (added the previously-
missing A6 + A7 sections; updated all content to 22/22 Verified).

Re-rendered both HTML (committed). Exported both PPTX (held in
/tmp/v1.12-release/ for the v1.12.0 Gitea release upload).

Verification: stale claims in HTML = 2 disclosure lines in PW (the 'v1.10
status is closed' framing), 0 in DX. @v1.10 = 0 across all artifacts.
A6/A7 + cost figures present in both HTML decks. README slide counts
updated (10+7=17).
2026-07-29 13:27:34 +00:00
..