Audit of v1.15-Nova milestone: reconstruction PASS (27 commits, 20 with ci blocks, 7 merges per convention, state matches checkpoint). File discipline: 10 auto-fixed rebrand-completeness gaps — 9 .ciagent/*.md headers still said ACDL (PROJECT/REQUIREMENTS/ROADMAP/RESEARCH/AUDIT/ REVIEW/COST/IAM_POLICY/CAPABILITY_INVENTORY → Nova) + config.json projects[].name → Nova. Active v1.15 sections already Nova; historical v1.1-v1.14 narratives left as-is. Branch hygiene PASS (6 phases + 1 milestone all merged, 0 orphans). Commit discipline PASS (0 non-merge commits without ci blocks, 0 unresolved escalations). 6 audit checks all PASS. Verdict: PASS. ---ci--- project: acdl phase: 5 milestone: v1.15 status: complete phase_role: final audit: pass ---/ci---
21 KiB
Nova v1.9 — Audit Report
Audit date: 2026-07-23. Auditor: ci-debugger. Milestone: v1.9. Result: PASS.
Step 1: Reconstruction Test
- 16 v1.9 commits with
---ci---blocks (specify → clarify → research → plan → execute ×4 phases → verify/complete → review-fix). - Reconstructed state: milestone v1.9, phase 43, status complete.
- Pipeline stages traversed: specify → clarify → research → plan → execute → verify → complete.
- Decisions D-080..D-089 all present in git log +
.ciagent/files. - config.json (v1.9 complete), PROJECT.md (v1.9 complete), REQUIREMENTS.md (v1.9 complete, 12 reqs), ROADMAP.md (v1.9 complete, phases 39–43), REVIEW.md (READY TO SHIP), PERSONAS.md (v1.9), VERIFY.md, AUDIT.md. PASS.
Step 2: File Discipline
.ciagent/config.json: valid JSON; mode, projects[] present. PASS..ciagent/PROJECT.md: Vision/Core Value (≡ "What This Is"), Key Decisions (v1.9 D-080..D-086), Requirements, Constraints, per-milestone Objective sections (≡ "Milestones") present. Section names follow the v1.0 established conventions (not the generic audit template). PASS..ciagent/ROADMAP.md: phases 39–43 present; all marked complete. PASS..ciagent/REQUIREMENTS.md: v1.9 traceability table complete (12/12 REQ-100..111 markedcomplete (v1.9.0)). PASS..ciagent/ARCHITECTURE.md: fixed during audit — v1.9 addendum added covering all new components (contract_resolver interpolation, environment_check.load, hitl_gates, attestation_matrix, separation_of_duties.route_halt_artifact, WizClient, kyverno_adapter, per-environment promotion, adapter parameterization, deferred D-083). All 9 v1.9 code components now referenced. PASS (after fix).
Step 3: Branch Hygiene
- Local:
mainonly. Remote:origin/mainonly. - No phase or milestone branches remain (all 5 v1.9 phase branches merged
- pruned during the run/ship workflow).
- No orphan branches. PASS.
Step 4: Commit Discipline
- 16/16 v1.9 commits have
---ci---blocks with project/phase/milestone/ status fields. - No stale implementation decisions (D-081..D-085, D-087..D-089 all have
code refs; D-080 + D-086 are process/meta decisions correctly living in
.ciagent/files). - No unresolved v1.9 escalations (the 3
audit(...)commits in history are from prior milestones v1.0/v1.6/v1.7). PASS.
Issues fixed during audit
- ARCHITECTURE.md missing v1.9 addendum — the architecture doc had no coverage of the v1.9 new components (hitl_gates, attestation_matrix, interpolation, per-env promotion, adapter parameterization, Wiz/Kyverno flesh-outs). Fixed: added a v1.9 addendum section covering all 9 new code components + the per-env promotion model + the deferred D-083 items. Verified all 9 components now referenced.
Audit result: PASS
ACDL v1.10 Phase 52 — Audit Addendum
Audit date: 2026-07-27. Auditor: ci-debugger. Phase: 52 (pipeline regression-VERIFY fix). Result: PASS.
Process defect recorded (D-091)
The prior VERIFY stage was diff-scoped: it checked the phase diff only
and never re-ran underlying platform capability. This structural defect
let 8 NFR-patch phases (v1.9.1→v1.9.8, deck rework) pass VERIFY while the
platform they described decayed underneath. The defect is recorded as
D-091 and remediated in Phase 52 by core/regression_verify.py +
scripts/run_regression.sh.
Phase 52 audit
- Reconstruction: Phase 52 commits present with
---ci---blocks (plan + execute + verify). Decisions D-090..D-094 recorded in PROJECT.md. Requirements REQ-112..REQ-115 recorded in REQUIREMENTS.md. PASS. - File discipline:
core/regression_verify.py,scripts/run_regression.sh,tests/test_verify_regression_mode.pypresent..ciagent/PLAN.md,ROADMAP.md,PROJECT.md,REQUIREMENTS.md,VERIFY.mdupdated for v1.10. PASS. - Behavioral: 502 fast tests pass (was 493; +9 new). 3 slow
integration tests pass.
run_regression.shruns and reports honestly. PASS. - Commit discipline: Phase 52 commits carry
---ci---blocks with project/phase/milestone/status. PASS.
Note on prior "audit CLEAN" claims
The v1.1–v1.9 "audit CLEAN" claims were point-in-time true (the capabilities ran at the time of tagging). They do not assert current reproducibility. The capability decay surfaced in the 2026-07-27 CLARIFY/RESEARCH stages is being re-verified in Phase 54 (D-093). The v1.10 audit will re-assert current reproducibility after the sweep.
Phase 52 audit result: PASS
ACDL v1.10 — Milestone Audit
Audit date: 2026-07-27. Auditor: ci-debugger. Milestone: v1.10. Result: PASS.
Step 1: Reconstruction Test
- 5 v1.10 commits with
---ci---blocks (plan → P52 verify → P53 verify → P54 verify → P55 verify). - Reconstructed state: milestone v1.10, phase 55, status verify.
- Pipeline stages traversed: plan → execute → verify (×4 phases).
- Decisions D-090..D-094 all present in git log +
.ciagent/files. - config.json (v1.10 complete), PROJECT.md (Capability Status section
- decay disclosure), REQUIREMENTS.md (REQ-112..115 complete), ROADMAP.md (v1.10 section, phases 52–55 complete), REVIEW.md (READY TO SHIP), VERIFY.md (Phase 55 PASS), AUDIT.md (this file), CAPABILITY_INVENTORY.md (16 Verified + 6 escalated), REGRESSION_REPORT (16/16 Verified). PASS.
Step 2: File Discipline
.ciagent/config.json: valid JSON; mode, projects[] present; milestone v1.10 complete. PASS..ciagent/PROJECT.md: Capability Status section + decay disclosure + D-090..D-094 decision rows present. PASS..ciagent/ROADMAP.md: v1.10 section with phases 52–55 all marked complete; v1.9.8 annotated as last deck-polish before freeze. PASS..ciagent/REQUIREMENTS.md: v1.10 traceability table complete (4/4 REQ-112..115 markedcomplete (v1.9.9..v1.9.12)). PASS..ciagent/CAPABILITY_INVENTORY.md: 16 Verified + 6 IAM-gated escalated, with evidence per capability. PASS..ciagent/REGRESSION_REPORT.md+.json: 16/16 Verified, gate passes. PASS..ciagent/REVIEW.md: READY TO SHIP (0 P0, 0 P1, 1 P2 post-hoc). PASS.
Step 3: Branch Hygiene
- Local:
mainonly. Remote:origin/mainonly. - No phase or milestone branches remain (single-project mode, flat
.ciagent/paths, no phase branches per config.json branching_strategy=phase but committed directly to main per the project's established convention). PASS.
Step 4: Commit Discipline
- 5/5 v1.10 commits have
---ci---blocks with project/phase/milestone/ status fields. - Decisions D-090..D-094 all have code/doc refs.
- The regression
---ci---blocks includeregression:arrays with per-capability status (Phases 52, 53, 54). - No unresolved v1.10 escalations (the 6 IAM-gated resources are documented in CAPABILITY_INVENTORY.md, not unresolved escalations). PASS.
Audit result: PASS
The v1.10 milestone is complete. The pipeline regression gap (D-091)
is fixed; the platform is fully locally testable (D-092); every
advertised v1.1–v1.8 capability is re-verified (D-093, 16/16 Verified);
the docs/decks match verified reality (D-094). 0 P0, 0 P1 from review;
1 P2 (post-hoc: expand regression registry to uptime-kuma + RDS stacks).
513 offline tests pass; the regression gate covers 16 capabilities
including 4 live-AWS checks. Ready to tag v1.10.0.
ACDL v1.10 — Post-Ship Audit (ciagent-audit workflow)
Audit date: 2026-07-27. Auditor: ci-debugger. Milestone: v1.10 (shipped, tag
v1.10.0). Result: PASS (1 issue fixed during audit).
Step 1: Reconstruction Test — PASS
Parsed all ---ci--- blocks from v1.9.8..HEAD (9 commits).
Reconstructed state:
- Phases: 52, 53, 54, 55 (+ boundary commits 0, 51)
- Milestone: v1.10
- Final status: complete
- Decisions: D-090..D-094
- Requirements: REQ-112..REQ-115
- Regression caps: CAP-001..CAP-016
Compared with .ciagent/ files:
- config.json: milestone v1.10, status complete. MATCH.
- ROADMAP.md: phases 52–55 present, all complete. MATCH.
- REQUIREMENTS.md: REQ-112..115 all complete. MATCH.
- PROJECT.md: D-090..D-094 decision rows present. MATCH.
- CAPABILITY_INVENTORY.md: CAP-001..CAP-016 all Verified. MATCH.
Reconstruction: PASS — state fully reconstructable from git log.
Step 2: .ciagent/ File Discipline — PASS (1 issue fixed)
config.json: valid JSON, required fields present. PASS.PROJECT.md: all required sections present (Vision, North Star, Capability Status, Requirements, Key Decisions, Constraints, Anti-Goals). PASS.ROADMAP.md: phases 52–55 present, v1.10 marked complete. PASS.REQUIREMENTS.md: REQ-112..115 all complete in traceability table. PASS.ARCHITECTURE.md: FIXED DURING AUDIT — had 0 references to v1.10 components (regression_verify, local_emulators, REGRESSION_REPORT, CAPABILITY_INVENTORY). Added a v1.10 addendum section covering the regression-class VERIFY, local emulating adapters, capability re-verification sweep, and the 7 adapter defect fixes. Now references all v1.10 components. PASS (after fix).
Step 3: Branch Hygiene — PASS
- Local:
mainonly. Remote:origin/mainonly. - No phase or milestone branches (flat workflow per project convention).
- No orphan branches. PASS.
Step 4: Commit Discipline — PASS
- 9/9 v1.10 commits have
---ci---blocks with project/phase/milestone/ status fields. - Decisions D-090..D-094: D-091/D-092/D-093 have code refs
(
core/regression_verify.py); D-090/D-094 are process/meta decisions with extensive.ciagent/doc refs (PLAN, ROADMAP, PROJECT, CAPABILITY_INVENTORY, AUDIT, VERIFY). No stale decisions. - No unresolved v1.10 escalations (the 6 IAM-gated resources are documented in CAPABILITY_INVENTORY.md, not unresolved escalations). PASS.
Issues fixed during audit
- ARCHITECTURE.md missing v1.10 addendum — the architecture doc had no coverage of the v1.10 new components (regression_verify, local_emulators, capability inventory, adapter defect fixes). Fixed: added a v1.10 addendum section covering all 4 new subsystems + the 7 adapter defect fixes. Verified all v1.10 components now referenced.
Audit result: PASS
ACDL v1.14 — Post-Milestone Audit (ciagent-audit workflow)
Audit date: 2026-07-29. Auditor: ci-debugger. Milestone: v1.14 (shipped, tag
v1.13.24, Gitea release id 285). Result: PASS.
Step 1: Reconstruction Test — PASS
Parsed all ---ci--- blocks from the v1.14 commit history (phase/00 +
milestone/v1.14-refinement branches). Reconstructed state:
- Phase 0 stages: specify → clarify → research → ideate → plan → grill → complete (6 stage commits + 1 ship commit).
- Phases 1–20: each has an execute commit (on phase/NN branch) + a
complete commit (squash-merged into milestone/v1.14-refinement). All
20
---ci---blocks present withproject: acdl,phase: N,milestone: v1.14,status: complete. - Phase 21: complete commit with
status: complete+ requirements covered array. - Decisions: D-095..D-101 all present in git log +
.ciagent/files. - Grill binding decisions: G-101..G-106 in GRILL.md + PLAN.md.
- Escalation: E-001 auto-resolved (D-101, full autonomy).
Compared with .ciagent/ files:
config.json:active_milestone: v1.14. MATCH.ROADMAP.md: v1.14 section with phases P0–P21, all complete. MATCH.REQUIREMENTS.md: REQ-135..154 all complete in traceability table. MATCH.PROJECT.md: v1.14 Objective + Key Decisions D-095..D-101 present. MATCH.CHECKPOINT.json: phase=21, stage=complete, milestone=v1.14, milestone_complete=true. MATCH.ARCHITECTURE.md: v1.11–v1.14 addenda present. MATCH.PLAN.md: v1.14 20-phase plan with wave ordering. MATCH.GRILL.md: v1.14 grill run with G-101..G-106 + E-001. MATCH.PERSONAS.md: v1.14 frontmatter + roster. MATCH.RESEARCH.md: v1.14 addendum with 8-category scope audit. MATCH.
Reconstruction: PASS — state fully reconstructable from git log.
Step 2: .ciagent/ File Discipline — PASS
config.json: valid JSON;active_milestone: v1.14,active_project: acdl,projects[]length 1. PASS.PROJECT.md: all required sections present (Objective v1.14, Key Decisions D-095..D-101, Core Tenets, Domain Boundaries, Constraints, Anti-Goals, Capability Status). 17 section headers. PASS.ROADMAP.md: v1.14 section with P0–P21, all marked complete. PASS.REQUIREMENTS.md: v1.14 traceability table complete (20/20 REQ-135..154 marked complete). 172completereferences total. PASS.ARCHITECTURE.md: v1.11/v1.12/v1.13/v1.14 addenda present, covering the stateless adapter, pipeline-driven lifecycle, ACDL_LIFECYCLE_MODE, CAP-013 fix, config schema migration, presentation polish, and all v1.14 NFR changes. D-083 deferral recorded explicitly. PASS.CHECKPOINT.json: valid JSON; phase=21, stage=complete, milestone_complete=true. PASS.
Step 3: Branch Hygiene — PASS (with note)
- v1.14 phase branches: phase/00–phase/21 all present locally. All
squash-merged into milestone/v1.14-refinement (the squash strategy
does not preserve ancestry for
--is-ancestorchecks, but the content is verified present on main via the milestone merge commit3b1181f). - Milestone branch: milestone/v1.14-refinement present, squash-merged into main.
- Prior milestone branches: milestone/v1.11-restart, milestone/v1.12-presentation, milestone/v1.13-deck-polish remain locally (not pruned). These are historical and harmless.
- Prior abandoned phase branches: phase/56-iam-re-bootstrap,
phase/57-live-deploy-microservice (v1.11 first attempt, abandoned per
D-097). These have
---ci---commits (not orphans) but are superseded. Not a defect — documented in ROADMAP.md v1.11 RESTART section. - Remote: origin/main + origin/milestone/v1.14-refinement present. No orphan remote branches.
Branch hygiene: PASS — all v1.14 branches served their purpose; the content is on main.
Step 4: Commit Discipline — PASS
- v1.14 commits with
---ci---blocks: 22/22 phase commits (phase 0 ship + phases 1–20 complete + phase 21 complete) have---ci---blocks withproject: acdl,phase: N,milestone: v1.14,status:. The 1 milestone merge commit (91338f7) lacks a---ci---block — it is a squash-merge summary commit, not a phase commit. Acceptable. - Stale decisions: D-095..D-101 all have code/doc refs (D-095/D-096/ D-097/D-099 are process/meta decisions in PROJECT.md; D-098 is the wave ordering in PLAN.md; D-100/D-101 are ideation/escalation decisions in PROJECT.md). No stale decisions.
- Unresolved escalations: E-001 auto-resolved (D-101,
resolution: auto,type: risk_accepted). No unresolved v1.14 escalations. The pre-v1.14resolution: user providedmatch is from the v1.1 bootstrap, not v1.14.
Commit discipline: PASS.
Step 5: Audit Checks — PASS
- HEAD not on main when branches exist: HEAD is on main (milestone complete; no active phase work). OK — post-milestone state.
- CHECKPOINT.json exists: EXISTS.
- CHECKPOINT.json consistent with git status: checkpoint phase=21,
stage=complete, milestone=v1.14, milestone_complete=true. Matches
latest
---ci---block (da533a8: phase=21, status=complete). MATCH. - Report template exists: EXISTS.
- No pending escalations: E-001 auto-resolved. 0 unresolved v1.14 escalations.
- Milestone version in config:
active_milestone: v1.14. Consistent with the milestone branch + checkpoint + git log. MATCH.
Additional checks:
- Stale version refs:
grep -rn "@v1\.[6-9]" docs/ README.md→ 0 hits (bumped to @v1.13 in P19). PASS. - Test suite: 561 passed, 5 deselected. PASS.
- Regression gate: 22/22 capabilities Verified (run at P21). PASS.
- CI pipeline:
run_ci.shexits 0 (3 stages pass). PASS. - D-083 deferral: explicitly recorded in ARCHITECTURE.md v1.14 addendum. PASS.
Audit result: PASS
The v1.14 milestone is complete. All 20 requirements (REQ-135..154) satisfied; 561 tests pass (was 528 at v1.13.2; +33); 22/22 capabilities Verified; 6 grill binding decisions (G-101..G-106) applied; 1 escalation (E-001) auto-resolved. State fully reconstructable from git log. 0 P0, 0 P1, 0 P2 outstanding. Ready for the next milestone.
v1.15 Post-Milestone Audit (2026-07-30)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ CIAgent ► AUDIT REPORT ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Reconstruction: PASS — 27 commits since v1.14 base (66a3c69), 20 with
---ci--- blocks (7 merge commits without blocks, per convention).
Reconstructed state: phase 5, milestone v1.15, complete, tag v1.15.4,
release 302, REQ-155..164 covered. Matches CHECKPOINT.json + REQUIREMENTS.md
- ROADMAP.md.
.ciagent/ Files: 12 checked.
- config.json: valid JSON; active_milestone v1.15 consistent. FIX applied: projects[0].name "Agentic Cloud Delivery Platform" → "Nova — The New Dawn of DevSecOps" (rebrand completeness).
- PROJECT.md: FIX applied — header "# ACDL — Agentic Cloud Delivery Platform" → "# Nova — The New Dawn of DevSecOps" + rebrand-in-progress banner → rebrand-complete banner.
- REQUIREMENTS.md: FIX applied — header "# ACDL — Requirements" → "# Nova — Requirements"; traceability 10/10 REQ-155..164 complete.
- ROADMAP.md: FIX applied — header "# ACDL — Roadmap" → "# Nova — Roadmap"; v1.15 phases P1-P5 all complete with tags.
- ARCHITECTURE.md: PASS (header already Nova per P5 doc-verifier); v1.15 addendum present; naming table matches codebase.
- PERSONAS.md: PASS (v1.15 addendum present).
- GRILL.md: PASS (v1.15 section present; 0 open escalations).
- RESEARCH.md: FIX applied — header "# ACDL — v1.11 RESTART Research Findings" → "# Nova — ...".
- PLAN.md: PASS (v1.15 plan present, frontmatter milestone v1.15).
- AUDIT.md: FIX applied — header "# ACDL v1.9 — Audit Report" → "# Nova v1.9 — Audit Report".
- REVIEW.md: FIX applied — header "# ACDL v1.11 — Multi-Persona Code Review" → "# Nova v1.11 — ...".
- COST.md: FIX applied — header "# ACDL AWS Cost Report" → "# Nova AWS Cost Report".
- IAM_POLICY.md: FIX applied — header "# ACDL — IAM Policy Baseline" → "# Nova — IAM Policy Baseline".
- CAPABILITY_INVENTORY.md: FIX applied — header "# ACDL Capability Inventory" → "# Nova Capability Inventory".
Branches: 6 v1.15 phase branches (all merged to main), 1 milestone branch (merged to main). No orphans. PASS.
Commits: 27 total, 39 ---ci--- blocks, 7 merge commits (no blocks, per
convention), 0 non-merge commits without ---ci---, 0 unresolved
escalations. PASS.
Audit Checks (runAuditChecks):
- HEAD on main (milestone complete) — PASS
- CHECKPOINT.json exists — PASS
- CHECKPOINT consistent with latest
---ci---(phase 5, v1.15, complete, v1.15.4) — PASS - Report template exists — PASS
- No pending escalations (grill: 0 open; log: none) — PASS
- Milestone version in config (v1.15) consistent with checkpoint — PASS
Issues fixed (audit auto-fix):
- 9
.ciagent/*.mdfile headers still said "ACDL" after the v1.15 rebrand (P1 lead-developer left.ciagent/to P0; P0 added the rebrand-in-progress banner to PROJECT.md only; the other file headers were never rebranded). All 9 headers now say "Nova". - config.json
projects[0].namestill said "Agentic Cloud Delivery Platform" (display label, not the repo slug). Now "Nova — The New Dawn of DevSecOps". Theslug("acdl") +release.gitea.repo("acdl") stay unchanged per D-105 (real repo name).
Notes:
- Historical narrative sections in ARCHITECTURE.md/COST.md/GRILL.md/
AUDIT.md/REVIEW.md (v1.1–v1.14 addenda) still mention
acdl-*resource names +ACDL_*env vars — these describe each milestone as-shipped and are acceptable as historical record per project convention. The active v1.15 sections use Nova. - The 7 merge commits without
---ci---blocks is the established convention (merge summary IS the record; the merged phase commits carry the blocks). Matches v1.14 precedent.
Verdict: PASS — Project state is fully reconstructable from git log. All 6 audit checks pass. 10 auto-fixed issues (9 stale headers + 1 config name) were rebrand-completeness gaps, not structural defects.
---ci--- project: acdl phase: 5 milestone: v1.15 status: complete phase_role: final audit: pass ---/ci---