phase: 2
milestone: v1.0
status: plan
plan:
waves: 2
wave_1_infra_stub: [T-2.1..T-2.8 create 8 L1 modules]
wave_2_coordination: [T-2.9 verify_phase02.sh, T-2.10 traceability]
requirements_covered: [REQ-02, REQ-03]
must_haves: 6
verification:
typecheck: bash -n + yaml load all 8 manifests
test: scripts/verify_phase02.sh
build: no-op
---/ci---
PLAN.md replaced with Phase 02 plan. Wave 1 (infra-stub-engineer) creates
the 8 L1 modules (one commit per L1). Wave 2 (lead-developer) adds the
verify script + traceability. backend/data/frontend personas have 0 tasks.