Jon Chery ec74060664 docs(P68): sync decks source .md to v1.11/v1.12 reality (9 drift items + plan-only-default story)
---
ci---
project: acdl
phase: 68
milestone: v1.12
status: execute
---
/ci---

Source-of-truth markdown for both decks synced to verified reality:
- Re-verification headers -> 22/22 Verified (v1.11 lifecycle + v1.12 P67 fix),
  v1.10 '6 deploy-unverified (IAM drift)' disclosed as closed.
- A4 (PW) verification status: '11 capabilities testing' -> '22/22 Verified
  via lifecycle pipeline + regression gate'.
- De-duplicated repeated story-beat intro lines (PW slides 3-10, A1).
- Version refs @v1.10 -> @v1.11 in deck examples.
- road-to-north-star.mmd re-rendered: v1.10 no longer 'NEXT'; v1.11-v1.12
  lifecycle testing + presentation refine (22/22 Verified + torn down to
  zero-cost) is the current phase; v2.0 is NEXT.
- New A6 'Operating Model & Cost' in both decks: real COST.md figures
  (/usr/bin/bash.001883/8d, ~/usr/bin/bash.007/mo, S3-dominated), zero-cost steady state, D-096
  teardown, + pre-mortem reference (PRE_MORTEM.md: 4 failure modes +
  structural mitigations).
- New A7 'Verified by Construction' in both decks: the two v1.11
  architectural pillars (stateless adapter 918->~80 lines; pipeline-driven
  lifecycle testing — the green cell IS verification) + the v1.12
  plan-only default (ACDL_LIFECYCLE_MODE flag, REQ-134).
- Appendix TOCs updated (5 -> 7 sections).

Marp + HTML + talking points re-synthesized in P69 (next).