P65 — Rewrite Caps + Decks
Phase: P65
Milestone: v1.11 (RESTART)
Requirements: REQ-116 (CAP-017..022 Verified), REQ-118 (decks rewritten)
Wave: 4 (final phase before COMPLETE)
Branch: milestone/v1.11-restart
Goal
Rewrite CAPABILITY_INVENTORY.md, PROJECT.md §Capability Status, and both
leadership decks: CAP-017..022 → "Verified live-aws via lifecycle pipeline;
torn down to zero-cost steady state." Remove the IAM-drift framing. Add
the cost appendix slide (P63) + pre-mortem reference (P64). ci-doc-verifier
confirms no stale "deploy-unverified" claims remain.
Tasks
Task 1 — Update CAPABILITY_INVENTORY.md
Mark CAP-017..022 as "Verified live-aws via lifecycle pipeline" (no longer "not auto-verified"). Remove the IAM-drift framing. Reference the lifecycle pipeline as the evidence source.
Task 2 — Update PROJECT.md §Capability Status
Update the capability status section to reflect Verified status for CAP-017..022.
Task 3 — Update decks (if present)
If leadership deck source files exist (PPTX/HTML/markdown), update them to reflect verified-then-torn-down status. Add the cost appendix (P63) + pre-mortem reference (P64). Remove stale "deploy-unverified" claims.
Task 4 — ci-doc-verifier check
Run the doc-verifier to confirm no stale "deploy-unverified" claims remain in any .ciagent/ or deck files.
Success Criteria (phase gate)
- CAPABILITY_INVENTORY + PROJECT reflect "Verified live-aws via lifecycle pipeline; torn down to zero-cost."
ci-doc-verifierconfirms no stale "deploy-unverified" claims.- Full offline pytest suite green.