0a1ed28c50
---ci---
phase: 5
milestone: v1.0
status: plan
plan:
waves: 3
wave_1_frontend: [T-5.1 evidence-ui/index.html]
wave_2_backend: [T-5.2 scripts/run_demo.sh 4-act simulation]
wave_3_coordination: [T-5.3 verify_phase05.sh, T-5.4 traceability]
requirements_covered: [REQ-13, REQ-14, REQ-15]
must_haves: 6
verification:
typecheck: bash -n + py_compile
test: scripts/verify_phase05.sh (with + without Gitea token)
---/ci---
PLAN.md replaced with Phase 05 plan. Wave 1 (frontend-engineer
REACTIVATED) builds evidence-ui/index.html. Wave 2 (backend-engineer)
builds scripts/run_demo.sh (4-act local simulation + upload). Wave 3
(lead-developer) verifies + traceability. Phase 05 is the milestone
capstone; COMPLETE gate follows.