2ec2a87a4e
---ci--- project: acdl phase: 0 milestone: v1.2 status: audit verdict: CLEAN ---/ci--- v1.2 milestone audit. Verdict: CLEAN — 0 P0 code issues (the 1 P0 is an operator action, not a code defect), 1 P1 post-hoc (adapter hardening, deferred to v1.3). Reconstruction test PASS; file discipline PASS; branch hygiene PASS; commit discipline PASS. The v1.3.0 tag is valid; the Gitea release is not yet created (missing ACDL_GITEA_TOKEN — documented manual step).