Files
acdl/docs/presentations/assets/mmd/leadership-slide-7.mmd
T
CIAgent ba28017f5b feat(P05): re-author 7 mermaid diagrams as complementary visuals
Diagrams now show relationships + stack positioning, not just restating
slide text:
- slide 1: the widening gap (velocity vs coordination surface) → Nova absorbs
- slide 2: Nova's position in the stack (SDLC/PDLC → contract → Nova → prod)
- slide 3: inheritance tree (two tenets → 6 architectural elements they shape)
- slide 4: confidence-threshold ladder (dev 0.50 → qa 0.75 → prod 0.90 → dr 0.95 + escalation)
- slide 5: stack layers with the contract as the dividing line (above/below)
- slide 6: the arc with what each milestone unlocks + the constant contract surface
- slide 7: proven foundation → runway arc → ask → structural risk if not

Fixed: slide 4 node/subgraph naming collision (DR → DRENV);
slides 2 + 5 reworked to horizontal layout (were too tall for slides).

---ci---
project: acdl
phase: 5
milestone: v1.30
status: execute
---/ci---
2026-08-20 14:46:26 +00:00

40 lines
2.0 KiB
Plaintext

%%{init: {'theme':'base', 'themeVariables': {'primaryColor':'#1B1B1B','primaryBorderColor':'#D6002A','primaryTextColor':'#fff','secondaryColor':'#fff','secondaryBorderColor':'#D6002A','secondaryTextColor':'#1B1B1B','tertiaryColor':'#F0F0F0','lineColor':'#1B1B1B','fontFamily':'"Helvetica Neue","Arial",sans-serif'}}}%%
flowchart TB
subgraph PROVEN["Proven today — the foundation"]
direction LR
L1L2["13 L1 + 2 L2<br/>live in registry"]
PILOT["Pilot live-apply<br/>confidence 0.800<br/>dev AWS account"]
L1L2 --- PILOT
end
subgraph ARC["The runway arc — next steps"]
direction LR
N1["Ingest greenfield<br/>pilot projects"]
N2["Promote<br/>dev → prod<br/>activate qa, prod, dr"]
N3["Integrate SPGE<br/>constitutional library<br/>at the contract surface"]
N4["Serve as the<br/>infrastructure layer<br/>beneath every app"]
N1 --> N2 --> N3 --> N4
end
subgraph ASK["The ask"]
ENDORSE["Architecture<br/>endorsement"]
RUNWAY["Runway to next<br/>milestone by Nov 2026"]
ENDORSE --- RUNWAY
end
subgraph RISK["If we don't — the structural risk"]
GAP["Delivery acceleration<br/>vs operational absorption<br/>gap widens through 2027"]
end
PROVEN -->|"foundation enables"| ARC
ARC -->|"lands at"| ASK
ASK -.->|"without it"| RISK
style PROVEN fill:#1B1B1B,color:#fff,stroke:#D6002A
style ARC fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A
style ASK fill:#1B1B1B,color:#fff,stroke:#D6002A
style RISK fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A
style L1L2 fill:#1B1B1B,color:#fff,stroke:#D6002A
style PILOT fill:#1B1B1B,color:#fff,stroke:#D6002A
style N1 fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A
style N2 fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A
style N3 fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A
style N4 fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A
style ENDORSE fill:#1B1B1B,color:#fff,stroke:#D6002A
style RUNWAY fill:#1B1B1B,color:#fff,stroke:#D6002A
style GAP fill:#F0F0F0,color:#1B1B1B,stroke:#D6002A