186cdde792
Cherry-picked from e868a16 (branch phase/60-pre-mortem-doc) and finalized for P64. The pre-mortem was originally authored at P60 but the roadmap assigns it to P64 (REQ-120). Part 1 — v1.10 decay incident post-mortem: - Root cause: VERIFY was diff-scoped — checked the phase diff only, never re-ran underlying capability. 8 NFR-patch phases (v1.9.1– v1.9.8) passed VERIFY while the platform decayed. - Mitigations landed in v1.10: D-091 regression gate, D-092 local emulators, D-093 capability inventory, D-094 verified-reality rewrite. Part 2 — forward pre-mortem (OSS reference + leadership pitch): - FM-1 IAM drift recurs → IAM_POLICY.md baseline test (REQ-116) - FM-2 cost spike from un-torn-down stacks → D-096 teardown mandatory - FM-3 deck overstates capability → Verified-only claims (REQ-121) - FM-4 pilot consumer hits a contract gap → honest scope (G-010) ---ci--- project: acdl phase: P64 milestone: v1.11 status: execute ---/ci---