Files
acdl/.ciagent/AUDIT.md
T
Jon Chery 7cccf989b1
acdl-ci / Lint (push) Successful in 7s
acdl-ci / Test (push) Successful in 26s
acdl-ci / Platform check-only (offline) (push) Successful in 8s
audit(v1.9): PASS — ARCHITECTURE.md v1.9 addendum + audit report
---ci---
phase: 43
milestone: v1.9
status: complete
---/ci---

Audit of the shipped v1.9 milestone:

Reconstruction: PASS — 16 v1.9 commits, all with ---ci--- blocks;
state reconstructs to milestone v1.9, phase 43, status complete.
Decisions D-080..D-089 all present in git log + .ciagent/ files.

File discipline: PASS — config.json, PROJECT.md, ROADMAP.md,
REQUIREMENTS.md, REVIEW.md, PERSONAS.md, VERIFY.md all consistent.
Fixed: ARCHITECTURE.md had no v1.9 coverage — added a v1.9 addendum
covering all 9 new code components (contract_resolver interpolation,
environment_check.load, hitl_gates, attestation_matrix,
separation_of_duties.route_halt_artifact, WizClient, kyverno_adapter,
per-env promotion, adapter parameterization) + the deferred D-083 items.

Branch hygiene: PASS — only main (local + remote); all 5 v1.9 phase
branches merged + pruned.

Commit discipline: PASS — 16/16 commits with ---ci--- blocks; no stale
implementation decisions; no unresolved v1.9 escalations.

Audit result: PASS.
2026-07-23 12:04:08 +00:00

2.8 KiB
Raw Blame History

ACDL v1.9 — Audit Report

Audit date: 2026-07-23. Auditor: ci-debugger. Milestone: v1.9. Result: PASS.

Step 1: Reconstruction Test

  • 16 v1.9 commits with ---ci--- blocks (specify → clarify → research → plan → execute ×4 phases → verify/complete → review-fix).
  • Reconstructed state: milestone v1.9, phase 43, status complete.
  • Pipeline stages traversed: specify → clarify → research → plan → execute → verify → complete.
  • Decisions D-080..D-089 all present in git log + .ciagent/ files.
  • config.json (v1.9 complete), PROJECT.md (v1.9 complete), REQUIREMENTS.md (v1.9 complete, 12 reqs), ROADMAP.md (v1.9 complete, phases 3943), REVIEW.md (READY TO SHIP), PERSONAS.md (v1.9), VERIFY.md, AUDIT.md. PASS.

Step 2: File Discipline

  • .ciagent/config.json: valid JSON; mode, projects[] present. PASS.
  • .ciagent/PROJECT.md: Vision/Core Value (≡ "What This Is"), Key Decisions (v1.9 D-080..D-086), Requirements, Constraints, per-milestone Objective sections (≡ "Milestones") present. Section names follow the v1.0 established conventions (not the generic audit template). PASS.
  • .ciagent/ROADMAP.md: phases 3943 present; all marked complete. PASS.
  • .ciagent/REQUIREMENTS.md: v1.9 traceability table complete (12/12 REQ-100..111 marked complete (v1.9.0)). PASS.
  • .ciagent/ARCHITECTURE.md: fixed during audit — v1.9 addendum added covering all new components (contract_resolver interpolation, environment_check.load, hitl_gates, attestation_matrix, separation_of_duties.route_halt_artifact, WizClient, kyverno_adapter, per-environment promotion, adapter parameterization, deferred D-083). All 9 v1.9 code components now referenced. PASS (after fix).

Step 3: Branch Hygiene

  • Local: main only. Remote: origin/main only.
  • No phase or milestone branches remain (all 5 v1.9 phase branches merged
    • pruned during the run/ship workflow).
  • No orphan branches. PASS.

Step 4: Commit Discipline

  • 16/16 v1.9 commits have ---ci--- blocks with project/phase/milestone/ status fields.
  • No stale implementation decisions (D-081..D-085, D-087..D-089 all have code refs; D-080 + D-086 are process/meta decisions correctly living in .ciagent/ files).
  • No unresolved v1.9 escalations (the 3 audit(...) commits in history are from prior milestones v1.0/v1.6/v1.7). PASS.

Issues fixed during audit

  1. ARCHITECTURE.md missing v1.9 addendum — the architecture doc had no coverage of the v1.9 new components (hitl_gates, attestation_matrix, interpolation, per-env promotion, adapter parameterization, Wiz/Kyverno flesh-outs). Fixed: added a v1.9 addendum section covering all 9 new code components + the per-env promotion model + the deferred D-083 items. Verified all 9 components now referenced.

Audit result: PASS