# ACDL v1.9 — Audit Report > Audit date: 2026-07-23. Auditor: ci-debugger. Milestone: v1.9. Result: PASS. ## Step 1: Reconstruction Test - 12 v1.9 commits with `---ci---` blocks (specify → clarify → research → plan → execute ×4 phases → merge ×4 → verify/review/audit/complete). - State matches config.json (milestone v1.9, status complete). - PROJECT.md v1.9 objective + decisions D-080..D-086 + auto-resolved parameters present. REQUIREMENTS.md REQ-100..111 + traceability table present. ROADMAP.md v1.9 section + phases 39–43 present. **PASS.** ## Step 2: File Discipline - All 10 `.ciagent/` files valid (config.json, PROJECT.md, REQUIREMENTS.md, ROADMAP.md, PLAN.md, RESEARCH.md, PERSONAS.md, REVIEW.md, VERIFY.md, AUDIT.md). - PERSONAS.md updated for v1.9 (milestone field, lambda-engineer reactivated, phase-specific overrides for 39–43). - REVIEW.md reconstructed with v1.9 content (D-086); note records v1.3–v1.8 reviews were not persisted (no git-history rewrite). **PASS.** ## Step 3: Branch Hygiene - 5 v1.9 phase branches (phase/39..43) merged to main. They can be pruned after the milestone tag. No milestone branch was used (single-project mode, main is the integration branch per the v1.8 precedent). - Only main + origin/main + the 5 phase branches remain. **PASS.** ## Step 4: Commit Discipline - 12/12 v1.9 commits have `---ci---` blocks with project, phase, milestone, status fields. - No stale decisions; D-080..D-086 recorded in PROJECT.md; D-087..D-089 recorded in RESEARCH.md. - No secrets in commits (SNS topic ARN is a Terraform output, not a literal; Wiz/KMS/SNS env-var-based). **PASS.** ## Issues fixed during audit None — the milestone is clean as shipped. ## Audit result: PASS