# FTE Hours Saved (Toil Reallocation Value) — Definition of Success > KPI: FTE Hours Saved > Target: ≥ 70% of pre-Nova FTE allocation (derived) **What this number means:** the engineering hours saved by automated operations, valued at the blended engineering rate. This is what those hours were spent on instead (the "toil reallocation" — capital freed up from ops to feature development). **How it's computed:** `run count × manual baseline minutes per run ÷ 60 × blended hourly rate`. The manual baseline is the estimated time a human team would take for the same operation (e.g., 30 min/ticket). **Honesty caveat:** computed on N internal runs today; the production- denominator activates post-pilot. The formula is grounded; the production numbers are not yet.