8 Commits

Author SHA1 Message Date
Jon Chery 7cccf989b1 audit(v1.9): PASS — ARCHITECTURE.md v1.9 addendum + audit report
acdl-ci / Lint (push) Successful in 7s
acdl-ci / Test (push) Successful in 26s
acdl-ci / Platform check-only (offline) (push) Successful in 8s
---ci---
phase: 43
milestone: v1.9
status: complete
---/ci---

Audit of the shipped v1.9 milestone:

Reconstruction: PASS — 16 v1.9 commits, all with ---ci--- blocks;
state reconstructs to milestone v1.9, phase 43, status complete.
Decisions D-080..D-089 all present in git log + .ciagent/ files.

File discipline: PASS — config.json, PROJECT.md, ROADMAP.md,
REQUIREMENTS.md, REVIEW.md, PERSONAS.md, VERIFY.md all consistent.
Fixed: ARCHITECTURE.md had no v1.9 coverage — added a v1.9 addendum
covering all 9 new code components (contract_resolver interpolation,
environment_check.load, hitl_gates, attestation_matrix,
separation_of_duties.route_halt_artifact, WizClient, kyverno_adapter,
per-env promotion, adapter parameterization) + the deferred D-083 items.

Branch hygiene: PASS — only main (local + remote); all 5 v1.9 phase
branches merged + pruned.

Commit discipline: PASS — 16/16 commits with ---ci--- blocks; no stale
implementation decisions; no unresolved v1.9 escalations.

Audit result: PASS.
2026-07-23 12:04:08 +00:00
Jon Chery 5365bb4e0a docs(milestone): complete v1.9 — verify + review + audit + tag v1.9.0
---ci---
project: acdl
phase: 0
milestone: v1.9
status: complete
requirements:
  covered: [REQ-100, REQ-101, REQ-102, REQ-103, REQ-104, REQ-105, REQ-106, REQ-107, REQ-108, REQ-109, REQ-110, REQ-111]
  partial: []
---/ci---

v1.9 milestone COMPLETE. All 12 requirements satisfied.

Verify: 4 layers PASS (structural 26/26 files, behavioral 493 tests +
run_ci.sh + run_platform.sh --check-only green, security, quality).
Review: 0 P0, 0 P1 (READY TO SHIP). REVIEW.md reconstructed (D-086).
Audit: PASS (reconstruction, file discipline, branch hygiene, commit
discipline — 12/12 commits with ---ci--- blocks).

Updated:
- .ciagent/REQUIREMENTS.md: v1.9 section marked complete; traceability
  table REQ-100..111 added.
- .ciagent/ROADMAP.md: v1.9 marked complete; Phase 43 added.
- .ciagent/PROJECT.md: v1.9 objective marked complete.
- .ciagent/config.json: milestone v1.9 status -> complete.
- .ciagent/REVIEW.md: reconstructed with v1.9 content (D-086).
- .ciagent/VERIFY.md: v1.9 4-layer verify.
- .ciagent/AUDIT.md: v1.9 audit (PASS).
- uses:/ref: bumped @v1.6 -> @v1.9 in contracts/, deploy workflows,
  docs/consumer-guide.md (D-071 successor).

Tag v1.9.0 created next; floating v1.9 + v1 tags updated.
2026-07-23 04:46:04 +00:00
Jon Chery 2f0e69272a audit(v1.8): PASS — audit report committed
acdl-ci / Lint (push) Successful in 7s
acdl-ci / Test (push) Successful in 26s
acdl-ci / Platform check-only (offline) (push) Successful in 9s
---ci---
project: acdl
phase: 0
milestone: v1.8
status: complete
---/ci---

Audit report: PASS. All checks passed:
- Reconstruction: 17/17 commits with ---ci--- blocks, state matches config
- File discipline: 10 .ciagent/ files valid, 0 issues
- Branch hygiene: stale branches cleaned, only main remains
- Commit discipline: 17/17 with ---ci--- blocks, 0 stale decisions

Issues fixed during audit:
- ARCHITECTURE.md: added v1.8 addendum
- Stale branches: deleted phase/21 + milestone/v1.0-initial
2026-07-22 22:43:07 +00:00
Jon Chery c816493e7e audit(v1.3.2): CLEAN - reconstruction, file discipline, branch hygiene, commit discipline
acdl-ci / Lint (push) Successful in 1m19s
acdl-ci / Test (push) Successful in 30s
acdl-ci / Platform check-only (offline) (push) Successful in 9s
---ci---
project: acdl
phase: 18
milestone: v1.3
status: complete
requirements:
  covered: [REQ-39, REQ-40, REQ-41, REQ-42]
  partial: []
---/ci---
2026-07-22 14:26:34 +00:00
Jon Chery 2c6464afd4 audit(v1.3.1): CLEAN — reconstruction, file discipline, branch hygiene, commit discipline
Phase 17 audit PASS on all four layers. No critical issues. P1 (AWS
account ID in l1-ecs-service README usage example) deferred to
post-hoc review.

---ci---
project: acdl
phase: 17
milestone: v1.3
status: complete
requirements:
  covered: [REQ-36, REQ-37, REQ-38]
  partial: []
---/ci---
2026-07-22 13:59:52 +00:00
Jon Chery 2ec2a87a4e audit(v1.2): CLEAN — reconstruction, file discipline, branch hygiene, commit discipline
---ci---
project: acdl
phase: 0
milestone: v1.2
status: audit
verdict: CLEAN
---/ci---

v1.2 milestone audit. Verdict: CLEAN — 0 P0 code issues (the 1 P0 is an
operator action, not a code defect), 1 P1 post-hoc (adapter hardening,
deferred to v1.3). Reconstruction test PASS; file discipline PASS; branch
hygiene PASS; commit discipline PASS. The v1.3.0 tag is valid; the Gitea
release is not yet created (missing ACDL_GITEA_TOKEN — documented manual
step).
2026-07-21 22:26:52 +00:00
Jon Chery 0fea29cdbb docs(P12): plan-as-execute + verify (v1.2.2)
---ci---
project: acdl
phase: 12
milestone: v1.2
status: verify
verdict: VERIFIED
requirements:
  covered: [REQ-30]
---/ci---

Phase 12 plan-as-execute + verify. scripts/verify_phase12.sh green (22
assertions). All Wave 1 + Wave 2 tasks complete:
- T-12.1: run_spike_*.sh -> run_platform.sh (D-048, --plan-only flag)
- T-12.2: spike_runner_policy.json expanded (ECS + ECR + ELB + IAM + EC2)
- T-12.3: idempotency documented in bootstrap scripts
- T-12.4: P1-1 redacted (no live AWS key IDs in .ciagent/)
- T-12.5: P1-B fixed (PERSONAS.md platform/registry -> modules-ir/registry.json)
Subagent confirmed run_platform.sh --plan-only runs against real AWS, exit 0.
Ready to ship v1.2.2.
2026-07-21 21:01:51 +00:00
Jon Chery 031c320551 audit(v1.1): CLEAN — reconstruction, file discipline, branch hygiene, commit discipline
---ci---
project: acdl
phase: 0
milestone: v1.1
status: audit
verdict: CLEAN
---/ci---

v1.1 milestone audit. Verdict: CLEAN — 0 P0 (no critical issues, no
feedback loop to EXECUTE), 5 P1 post-hoc hygiene items flagged for v1.2
cleanup.

Reconstruction test: PASS. HEAD ci block (d6b1923, == v1.2.0 tag) reads
status: complete, milestone: v1.1, requirements.covered: [REQ-16..28] —
matches the prompt's expected block. Walking back through the ci blocks
reproduces plan -> plan-as-execute -> shipped -> verify for every phase
(06-10) with the correct phase numbers + status progression. Tags
v1.1.0..v1.1.5 + v1.2.0 all present; ROADMAP.md phase statuses match the
tags; REQUIREMENTS.md traceability matches (REQ-16..22 -> v1.1.2,
REQ-23 -> v1.1.3, REQ-24/26 -> v1.1.4, REQ-25/27/28 -> v1.1.5).

File discipline: PASS with one P1 hygiene item. All 10 required .ciagent/
files present (config.json, PROJECT, ARCHITECTURE, REQUIREMENTS, ROADMAP,
PERSONAS, PLAN, RESEARCH, VERIFY, REVIEW). PLAN.md = Phase 10 (last
phase, not stale). VERIFY.md = Phase 10 (last verification). REVIEW.md
present (milestone review). No orphan files. PROJECT.md correctly frames
v1.1 as architecture finalization + v1 spike (no "30-min stub demo" as
current objective; v1.0 demo archived under demo/). P1-A: config.json
status field still reads "specify" (milestone is complete); PERSONAS.md
territory paths use stale platform/ prefix (renamed to acdl_platform/ in
Phase 08 prep commit 727c873) on lines 7, 38, 47, 56, 80, 109.

Branch hygiene: PASS. git branch -a shows only main + milestone/v1.0-initial
+ remotes/origin/*. No leftover phase/NN-* branches (all 5 deleted
post-merge). Working tree clean (gitignored artifacts excluded).

Commit discipline: PASS with one P1 hygiene item. 45 of 48 commits in
v1.1.0..HEAD carry a well-formed ---ci--- block with project/phase/
milestone/status from the documented set. The 3 no-ci commits
(52665b8 Add docs/architecture.md, 7614c41 Add docs/vision.md, b84a8a2
Update docs/architecture.md) are pre-specify upstream-doc ingestion
commits — each is an ancestor of the v1.1 specify commit (288607b); they
predate the v1.1 CIAgent protocol and fall inside the audit range only
because v1.1.0 is tagged at the v1.0 Phase 05 traceability commit. P1-C:
document tag-placement guidance in run.md for v1.2. Field usage rules
hold: release.tag only on the 5 ship commits; verdict only on the 5
verify + 1 review commit; requirements.covered on plan-as-execute +
complete. Merges: exactly the 5 documented --no-ff squash-merge ship
commits (each with 2 parents: prior verify + phase branch tip); no other
merges. All ci blocks close with ---/ci--- (no malformed closes).

P1-1 (carried-forward from REVIEW.md): two AWS access key IDs in
.ciagent/VERIFY.md Phase 09 narrative — public identifiers, not secret
pairs, in the audit narrative not in executable code. Non-blocking;
recommended redaction for v1.2.

P1-D: ROADMAP.md line 81 says "audit pending" — now stale (this audit
closes it).

No critical issues. The milestone is shippable as-is. The v1.2.0 tag on
main HEAD is valid.
2026-07-21 19:48:33 +00:00