306 Commits

Author SHA1 Message Date
CIAgent Orchestrator fa789d703a docs(P04): complete operator-guide-reference-tracking phase (REQ-OPS-GUIDE, v1.28.4)
Nova Slides Render / render (push) Failing after 29s
---ci---
project: acdl
phase: 4
milestone: v1.29
status: complete
---/ci---
2026-08-20 05:24:26 +00:00
CIAgent Orchestrator 8c0c2dd268 docs(P03): complete cfn-archive-tf-delegation phase (REQ-369, v1.28.3)
Nova Slides Render / render (push) Failing after 25s
---ci---
project: acdl
phase: 3
milestone: v1.29
status: complete
---/ci---
2026-08-20 05:20:43 +00:00
CIAgent Orchestrator c19cc68d15 docs(P02): complete gitea-scrub-decisions phase (REQ-367, REQ-368, v1.28.2)
Nova Slides Render / render (push) Failing after 14m19s
---ci---
project: acdl
phase: 2
milestone: v1.29
status: complete
---/ci---
2026-08-20 05:16:53 +00:00
CIAgent Orchestrator d247db3569 docs(P01): complete publish-pipeline phase (REQ-354, v1.28.1)
Nova Slides Render / render (push) Failing after 24s
---ci---
project: acdl
phase: 1
milestone: v1.29
status: complete
---/ci---
2026-08-20 05:07:30 +00:00
CIAgent Orchestrator 09253bf0be docs(ship): P0 complete -> v1.28.0 (local-only, push credentials unavailable)
---ci---
project: acdl
phase: 0
milestone: v1.29
status: complete
escalation: release_pending
resolution: auto
type: release_pending
---/ci---
2026-08-20 05:00:48 +00:00
CIAgent Orchestrator 0789c27ca2 docs(P00): complete v1.29 pre-execution — SPECIFY+CLARIFY+RESEARCH+PLAN+GRILL+MVP/UX
Nova Slides Render / render (push) Failing after 14m27s
---ci---
project: acdl
phase: 0
milestone: v1.29
status: complete
---/ci---
2026-08-20 05:00:35 +00:00
Jon Chery a6510e7afc docs(pdlc): STATE.md Phase 0 intake — post-v1.28 ground truth snapshot
Populates the PDLC Phase 0 intake format with the absolute ground truth
of the system after v1.28 ship (CLI Canonicalization + Identity Layer).
Header bumped to v1.28 last-ship. 7 sections: header, architecture state,
technical stack, active constraints (D-001..D-231, INV-1..17, CAP-001..038),
recent history + quality gates (coverage 73.8% YELLOW — below 80% floor),
agent context + assumptions, canonical state references. Unknowns explicit
(no new initiative; CodeArtifact/KMS/kj-in-Lambda unverified in-account).

---ci---
project: acdl
phase: 0
milestone: v1.28
status: pdlc-intake
---/ci---
2026-08-19 23:53:19 +00:00
Jon Chery adc55a17ab docs(milestone): complete v1.28 CLI Canonicalization + Identity Layer (release v1.27.6)
Nova Slides Render / render (push) Failing after 29s
---ci---
project: acdl
phase: 6
milestone: v1.28
status: complete
requirements:
  covered: [REQ-323..353]
  partial: []
---/ci---
2026-08-19 23:47:44 +00:00
Jon Chery 4697692ce7 docs(ship): P5 complete → v1.27.5 (v1.28 docs-integration)
Nova Slides Render / render (push) Failing after 26s
---ci---
project: acdl
phase: 5
milestone: v1.28
status: complete
---/ci---
2026-08-19 23:34:11 +00:00
Jon Chery f68349d94d docs(ship): P4 complete → v1.27.4 (v1.28 token-vend-pat, highest-risk phase)
Nova Slides Render / render (push) Failing after 28s
---ci---
project: acdl
phase: 4
milestone: v1.28
status: complete
---/ci---
2026-08-19 23:17:31 +00:00
Jon Chery 05bf8bf221 docs(ship): P3 complete → v1.27.3 (v1.28 idp-auth)
Nova Slides Render / render (push) Failing after 24s
---ci---
project: acdl
phase: 3
milestone: v1.28
status: complete
---/ci---
2026-08-19 23:00:37 +00:00
Jon Chery a8ef1e8864 docs(ship): P2 complete → v1.27.2 (v1.28 lambda-packaging)
Nova Slides Render / render (push) Failing after 26s
---ci---
project: acdl
phase: 2
milestone: v1.28
status: complete
---/ci---
2026-08-19 22:52:36 +00:00
Jon Chery 5763e85bb7 docs(ship): P1 complete → v1.27.1 (v1.28 cli-substrate)
Nova Slides Render / render (push) Failing after 28s
---ci---
project: acdl
phase: 1
milestone: v1.28
status: complete
---/ci---
2026-08-19 22:42:12 +00:00
Jon Chery 37f462783f docs(P01): verify — v1.28 cli-substrate (4 layers PASS, 809 tests, CAP-033/034/035)
---ci---
project: acdl
phase: 1
milestone: v1.28
status: verify
---/ci---
2026-08-19 22:41:00 +00:00
Jon Chery 88e2389a95 docs(ship): P0 complete → v1.27.0 (v1.28 pre-execution)
Nova Slides Render / render (push) Failing after 25s
---ci---
project: acdl
phase: 0
milestone: v1.28
status: complete
---/ci---
2026-08-19 22:11:01 +00:00
Jon Chery a0c363c063 decision(P00): mvp/ux gate — auto-generated (3 sections verified, PASS)
---ci---
project: acdl
phase: 0
milestone: v1.28
status: mvp_ux_check
---/ci---
2026-08-19 22:10:24 +00:00
Jon Chery bbfcbcc4d3 docs(P00): grill — v1.28 adversarial review (PROCEED 0.76, 3 critical + 16 tracked conditions applied)
---ci---
project: acdl
phase: 0
milestone: v1.28
status: grill
---/ci---
2026-08-19 22:10:15 +00:00
Jon Chery e1dc59ba79 docs(P00): create phase plans — v1.28 (7 phases, 31 REQs, 6 CAPs, MVP/UX sections)
---ci---
project: acdl
phase: 0
milestone: v1.28
status: plan
---/ci---
2026-08-19 22:06:38 +00:00
Jon Chery c629809d75 docs(P00): research findings — v1.28 CLI + identity layer (11 Qs, D-228 amended)
---ci---
project: acdl
phase: 0
milestone: v1.28
status: research
---/ci---
2026-08-19 22:05:24 +00:00
Jon Chery 05efb014d6 docs(P00): clarify — v1.28 ambiguities resolved (6 Qs + 5 grounding gaps, D-226..D-231)
---ci---
project: acdl
phase: 0
milestone: v1.28
status: clarify
---/ci---
2026-08-19 21:58:41 +00:00
Jon Chery 9ee1cc8925 docs(init): validate specification — v1.28 CLI Canonicalization + Identity Layer
---ci---
project: acdl
phase: 0
milestone: v1.28
status: specify
---/ci---
2026-08-19 21:57:53 +00:00
Jon Chery 1faf4b560f docs(milestone): complete v1.27 PO State Catalog & Ciagent Compression (release v1.26.3)
Nova Slides Render / render (push) Failing after 26s
v1.27 COMPLETE. NFR milestone — PO State Catalog & Ciagent Compression.

Phases:
- P0 pre-execution (specify→clarify→research→plan→grill) → v1.26.0
- P1 author-archive (STATE.md + 8 files archived) → v1.26.1
- P2 fix-stale-wire (PROJECT/ROADMAP phase-status + ship-discipline wiring) → v1.26.2
- P3 final-review-ship (review + audit + milestone ship) → v1.26.3

Delivered:
- .ciagent/STATE.md — PO-facing capability catalog (32 CAP rows +
  11 invariants across 10 domains, backfilled through v1.26). The
  first file the PO reads before writing a new REQ-NNN spec.
- .ciagent/ compression: 7 platform-root files + 1 consumer file
  archived (lossless git mv). Active .md count: 15 (was 25).
- PROJECT.md + ROADMAP.md v1.26 phase-status corrected (P3/P4/P5
  → complete; v1.25.5 shipped; merged to main).
- STATE.md wired into the P-final ship discipline (PLAN.md, ROADMAP.md,
  NORTH_STAR.md). Every future milestone ship appends capability rows +
  bumps the 'Last milestone ship' header.

Review: 0 P0 issues. Audit: reconstruction PASS, file discipline CLEAN,
branch hygiene CLEAN, commit discipline CLEAN (13/13 ---ci--- blocks).
NFR purity gate holds (zero feat: commits).

---ci---
project: acdl
phase: 3
milestone: v1.27
status: complete
---ci---
2026-08-19 19:18:12 +00:00
Jon Chery f28aed2f55 docs(ship): P2 complete → v1.26.2 (v1.27 fix-stale-wire)
Nova Slides Render / render (push) Failing after 24s
---ci---
project: acdl
phase: 2
milestone: v1.27
status: complete
---ci---
2026-08-19 19:17:07 +00:00
Jon Chery 6b410d9ab4 docs(P02): fix stale phase-status + wire STATE.md into ship discipline
P2 W1: PROJECT.md v1.26 phase-status block (lines 428-438):
- P3/P4/P5 'pending' → 'complete' with shipped tags (v1.25.3/4/5)
- v1.26 Overview marked shipped (merged to main 2026-08-19)
- Added STATE.md pointer to Capability Status section header
- Updated CAPABILITY_INVENTORY.md refs → archive/CAPABILITY_INVENTORY-v1.10.md

P2 W2: ROADMAP.md v1.26 section:
- P3/P4/P5 'planned' → 'complete' with shipped tags
- v1.26 Overview '(active, ...)' → '(complete, tag v1.25.5, merged to main)'
- Added STATE.md to v1.25 + v1.26 P5 'Updated at ship' lists

P2 W3: Wired STATE.md into ship discipline:
- PLAN.md: added 'Durable convention (v1.27 establishes)' section —
  every future P-final Wave 3 file-update list includes STATE.md
  (append new capability rows, mark deprecations, bump 'Last
  milestone ship' header).
- NORTH_STAR.md: added 'Relationship to engineering files (v1.27
  update)' section — STATE.md is the *what exists* catalog (PO-owned,
  additive); NORTH_STAR is the *why*; ARCHITECTURE the *how*;
  CHECKPOINT the *now*.

P2 W4: archive README + consumer PROJECT pointer:
- archive/README.md: added 'v1.27 compression — archived files (8
  files, lossless git mv)' section with 3 tables (3 superseded refs +
  4 v1.26 verifications/review/evidence + 1 consumer) + a note on the
  v1.26 pre-execution artifacts (in git history, not on disk).
  Updated 'Why archive' to record both compressions (v1.26 P2 +
  v1.27 P1).
- nova-blockchain-exchange/PROJECT.md: added phase-by-phase history
  pointer to platform ROADMAP §v1.26 (consumer ROADMAP archived).

P2 W5: Fixed remaining dangling references to archived files:
- ARCHITECTURE.md §12.8 line 566: P4-PILOT-RUN-EVIDENCE.md → archive/
- nova-blockchain-exchange/README.md (3 refs): P4-PILOT-RUN-EVIDENCE.md
  → archive/P4-PILOT-RUN-EVIDENCE-v1.26.md
- IAM_POLICY.md (2 refs): CAPABILITY_INVENTORY.md → archive/

Verified: 0 active dangling references remaining (grep confirms all
matches are in archive/ or v1.27 P0 records describing the archive).

---ci---
project: acdl
phase: 2
milestone: v1.27
status: execute
wave: W6
---ci---
2026-08-19 19:16:43 +00:00
Jon Chery 2b2423532b docs(ship): P1 complete → v1.26.1 (v1.27 author-archive)
Nova Slides Render / render (push) Failing after 26s
---ci---
project: acdl
phase: 1
milestone: v1.27
status: complete
---ci---
2026-08-19 19:14:12 +00:00
Jon Chery f2b481716d chore(P01): archive 7 platform + 1 consumer outdated .ciagent files
P1 W1: verified STATE.md 32 CAP rows against regression_verify.py
(fixed CAP-025 omission — was missing from Domain 9; CAP-031 renumbered
to cover the live-apply evidence row).

P1 W2: archived 7 platform-root files to .ciagent/archive/ with
milestone-suffix names (lossless git mv preserves history):
- CAPABILITY_INVENTORY.md → CAPABILITY_INVENTORY-v1.10.md
- REVIEW-AUDIT-P05.md → REVIEW-AUDIT-P05.md
- VERIFY-P03.md → VERIFY-P03.md
- VERIFY-P04.md → VERIFY-P04.md
- P4-PILOT-RUN-EVIDENCE.md → P4-PILOT-RUN-EVIDENCE-v1.26.md
- AUTONOMY_THESIS.md → AUTONOMY_THESIS-v1.21.md
- COST.md → COST-v1.14.md

P1 W3: archived 1 consumer file to new .ciagent/nova-blockchain-exchange/archive/
(D-221: consumer archives land in per-project subdir):
- nova-blockchain-exchange/ROADMAP.md → archive/ROADMAP-v1.26.md

The 4 pre-execution files (CLARIFY/GRILL/IDEATE/RESEARCH) stay active
through v1.27 — they hold the v1.27 P0 content (D-219 refinement,
G-Q2); the v1.26-era content is in git history. They archive at
v1.28 P1 if v1.28 happens.

Dangling references to archived files found in PROJECT.md,
ARCHITECTURE.md, IAM_POLICY.md, nova-blockchain-exchange/README.md —
fixed in P2.

---ci---
project: acdl
phase: 1
milestone: v1.27
status: execute
wave: W4
---ci---
2026-08-19 19:13:48 +00:00
Jon Chery ecc9730f24 docs(ship): P0 complete → v1.26.0 (v1.27 pre-execution)
---ci---
project: acdl
phase: 0
milestone: v1.27
status: complete
---ci---
2026-08-19 19:12:51 +00:00
Jon Chery 4fe1a1508e docs(P00): grill — v1.27 adversarial review (6 challenges, PROCEED 0.88)
Nova Slides Render / render (push) Failing after 26s
6 challenges; 0 escalations; 1 binding revision (G-Q2, already in
PLAN): archive list refined to 7 platform + 1 consumer = 8 files
(the 4 pre-execution files stay active through v1.27 holding the P0
content; v1.26-era content in git history).

Challenges:
- G-Q1: archiving AUTONOMY_THESIS + COST is lossless (folded into
  NORTH_STAR; COST predates v1.26 pilot)
- G-Q2: archive-list ambiguity resolved (the refinement above)
- G-Q3: STATE.md backfill accuracy ensured by P1 W1 verification step
- G-Q4: NFR purity holds (STATE.md is docs, not feat)
- G-Q5: PROJECT.md bug fix in P2 is intentional phasing (D-225)
- G-Q6: milestone scope is appropriately small + high-leverage

---ci---
project: acdl
phase: 0
milestone: v1.27
status: grill
---ci---
2026-08-19 19:12:37 +00:00
Jon Chery a6b908c035 docs(P00): personas + plan — v1.27 (lead-developer only, 3 phases)
PERSONAS: lead-developer active (docs/chore milestone); 5 others
inactive. Territory: .ciagent/, docs/.

PLAN: 3 phases (P1 author-archive, P2 fix-stale-wire, P3 final-review-ship).
Tags on v1.26.x; v1.26.3 = milestone release.

Archive-list correction (D-219 refinement): the 4 pre-execution files
(CLARIFY/GRILL/IDEATE/RESEARCH) were rewritten in P0 with v1.27
content — the v1.26-era content lives in git history. The v1.27 P0
versions stay active through v1.27 (current pre-execution record);
they archive at v1.28 P1 if v1.28 happens. Final archive list: 7
platform files (CAPABILITY_INVENTORY, REVIEW-AUDIT-P05, VERIFY-P03,
VERIFY-P04, P4-PILOT-RUN-EVIDENCE, AUTONOMY_THESIS, COST) + 1
consumer file (nova-blockchain-exchange/ROADMAP) = 8 files.

---ci---
project: acdl
phase: 0
milestone: v1.27
status: plan
---ci---
2026-08-19 19:12:01 +00:00
Jon Chery e9fbb44ad1 docs(P00): research findings — v1.27 staleness inventory + backfill sources
NFR milestone, no new domain. Research is a codebase-grounded inventory:
- 11 files to archive (4 pre-execution v1.26 artifacts + 3 phase
  verifications/review + 1 evidence snapshot + 3 durable refs superseded
  by STATE.md/NORTH_STAR/archive + 1 consumer ROADMAP).
- 12 files kept active (no-edit: live code paths, durable refs).
- 3 files kept active (fix-only: PROJECT.md, ROADMAP.md, archive/README.md).
- STATE.md backfill sources: regression_verify.py, registry.json,
  REQUIREMENTS traceability, CHECKPOINT, git log, PROJECT decisions.
- Persona roster: lead-developer only (docs/chore milestone).
- 4 risks, all Low-Medium with documented mitigations.

---ci---
project: acdl
phase: 0
milestone: v1.27
status: research
---ci---
2026-08-19 19:09:32 +00:00
Jon Chery 155963d40d docs(P00): clarify — v1.27 ambiguities resolved (6 Qs, D-220..D-225)
6 prior-conversation resolutions (D-214..D-219, user-confirmed) +
6 new ambiguities auto-resolved at full autonomy (D-220..D-225):
- D-220: NFR milestone (tags on v1.26.x)
- D-221: consumer archives in .ciagent/nova-blockchain-exchange/archive/
- D-222: archiving preserves traceability (archive + PROJECT + git)
- D-223: IAM_POLICY.md stays active (live baseline, D-207 pending)
- D-224: REGRESSION_REPORT regenerates on next run_regression.sh
- D-225: PROJECT.md phase-status fix is P2 (correction phase)

0 escalations. Confidence ≥ 0.85 on all new decisions.

---ci---
project: acdl
phase: 0
milestone: v1.27
status: clarify
---ci---
2026-08-19 19:09:05 +00:00
Jon Chery e1b5dc2d1f docs(P00): validate specification — v1.27 PO state catalog + ciagent compression
NFR milestone. Establishes v1.27 (tag line v1.26.x):
- Author .ciagent/STATE.md — PO-facing capability catalog (backfill
  CAP-001..036 across 10 domains + 11 invariants distilled from
  PROJECT.md load-bearing decisions D-034..D-072).
- Archive 10 stale .ciagent/ root files + 1 consumer file (compression
  of pre-execution artifacts, verifications, evidence, the dated
  CAPABILITY_INVENTORY, AUTONOMY_THESIS, COST).
- Fix 3 stale-but-kept files (PROJECT.md, ROADMAP.md phase-status
  blocks; archive README contents tables).
- Wire STATE.md into the P-final ship discipline (PLAN.md, ROADMAP.md,
  NORTH_STAR.md).

The first file the PO reads before writing a new REQ-NNN spec.

---ci---
project: acdl
phase: 0
milestone: v1.27
status: specify
---ci---
2026-08-19 19:08:38 +00:00
Jon Chery c0453817ad docs(milestone): complete v1.26 Live Pilot Estate Activation (release v1.25.5)
acdl-ci / Lint (push) Successful in 8s
acdl-ci / Test (push) Failing after 17s
acdl-ci / Platform check-only (offline) (push) Successful in 18s
All 13 requirements (REQ-310..322) complete. Live pilot estate activated against AWS
581513795199. Milestone merged to main. Tags v1.25.0..v1.25.5. Checkpoint cleared.

---ci---
project: acdl
phase: 5
milestone: v1.26
status: complete
requirements:
  covered: [REQ-310, REQ-311, REQ-312, REQ-313, REQ-314, REQ-315, REQ-316, REQ-317, REQ-318, REQ-319, REQ-320, REQ-321, REQ-322]
  partial: []
---
2026-08-19 03:54:29 +00:00
Jon Chery 7e7a4fa853 docs(P05): final review + audit — PROCEED (0 P0 remain, audit CLEAN)
Multi-persona review across P1..P4 + audit (reconstruction, file
discipline, branch hygiene, commit discipline).

Review: 0 P0 issues remain after the REQ-316 traceability fix (committed
separately). Correctness spot-checks all PASS (kj substrate, outcome
backfill, Gitea adapter, env-JSON state_backend, pilot policies). 844
tests green (839 fast + 5 slow individually confirmed). No NOVA_AWS_*
secrets in committed files; test_no_forge_mentions PASS. 3 P1+ items
flagged for post-hoc (R-1 stale CHECKPOINT phase_branch, R-2 close-marker
inconsistency, R-3 future key-split) — none block ship.

Audit: reconstruction PASS (git-log ---ci--- blocks ↔ .ciagent/
consistent; phase 4/complete/v1.25.4 matches HEAD). File discipline CLEAN
(all 6 .ciagent/ files consistent). Branch hygiene CLEAN (only main +
milestone + P5; P1-P4 deleted; v1.25.0..v1.25.4 tagged). Commit discipline
CLEAN (all v1.26 commits carry ---ci--- blocks; merge commits included).

Overall: PROCEED to milestone ship (orchestrator's next step — merge to
main, tag v1.25.5, Gitea release, delete milestone branches, final
CHECKPOINT clear).

---ci---
project: acdl
phase: 5
milestone: v1.26
status: execute
wave: review-audit
---
2026-08-19 03:53:17 +00:00
Jon Chery 3a32c3b898 fix(P05): REQ-316 traceability — P4 live-verify complete (not pending)
The v1.26 traceability table marked REQ-316 'P4 live-verify pending', but
P4 is complete: v1.25.4 tagged, the live terraform apply against
581513795199 succeeded (commit 6ced8ed), verify PASS (074ee05), and the
CHECKPOINT notes confirm 'nova.outcome.backfilled (pending->succeeded)'.
Corrected to 'v1.25.4 — live-verify complete'. 0 P0 issues remain after
this fix.

---ci---
project: acdl
phase: 5
milestone: v1.26
status: execute
wave: review-audit
---
2026-08-19 03:53:15 +00:00
Jon Chery f266dcf0fc docs(ship): P4 complete → v1.25.4 (v1.26 pilot-run-and-docs)
---ci---
project: acdl
phase: 4
milestone: v1.26
status: complete
---
2026-08-19 03:28:20 +00:00
Jon Chery 074ee05f83 verify(P04): PASS — live apply succeeded, evidence stream complete, docs done
Nova Slides Render / render (push) Failing after 17s
---ci---
project: acdl
phase: 4
milestone: v1.26
status: verify
---
2026-08-19 03:28:02 +00:00
Jon Chery a0799f13e5 docs(P04 W2): pilot-run docs (REQ-321) — adapters/README, METRICS, ARCHITECTURE §12.8, consumer onboarding
- adapters/README.md: fixed stale TYPE_MAP/INPUT_MAP refs (the adapter is a
  stateless assembler); added the blockchain-exchange consumer row + the
  Gitea adapter note (SPEC §10 Q1 — no cross-repo uses:)
- docs/METRICS.md: Post-Pilot denominators activated (AI Decision Accuracy +
  Human Escalation Frequency + the third metric now have non-zero data from
  the blkex-pilot-apply-v0.2 run)
- .ciagent/ARCHITECTURE.md §12.8: Pilot Estate (v1.26 live) — the first real
  consumer estate, the live apply, the Gitea adapter, the evidence stream
- .ciagent/nova-blockchain-exchange/README.md: consumer onboarding guide
  (deploy invocation, secrets, contract shape, verification)

---ci---
project: acdl
phase: 4
milestone: v1.26
status: execute
wave: W2
---
2026-08-19 03:27:27 +00:00
Jon Chery 6ced8eda7d docs(P04 W1): live pilot run evidence — apply succeeded, outcome backfilled (v1.26)
terraform apply against 581513795199 succeeded: ALB app-254671247.us-east-1.elb.amazonaws.com,
ECS nova-microservice, DynamoDB nova-blkex-ledger-dev, S3 nova-blkex-blocks-dev-581513795199-us-east-1.
Confidence 0.800 pass (dev autonomous). Decision Ledger: ai.decision.made (human_override=false) +
nova.outcome.backfilled (pending->succeeded, REQ-317). Hash chain valid. Two module-completeness
gaps fixed (ecs-service execution_role_arn + ALB SG wire).

---ci---
project: acdl
phase: 4
milestone: v1.26
status: execute
wave: W1
---
2026-08-19 03:05:17 +00:00
Jon Chery 6b60c0cbe3 docs(ship): P3 complete → v1.25.3 (v1.26 pilot-metrics-and-policies)
---ci---
project: acdl
phase: 3
milestone: v1.26
status: complete
---
2026-08-19 01:04:36 +00:00
Jon Chery 732998b01f docs(P03): mark REQ-315..320 complete + update checkpoint (v1.25.3 ready to ship)
Nova Slides Render / render (push) Failing after 17s
---ci---
project: acdl
phase: 3
milestone: v1.26
status: verify
---
2026-08-19 00:44:15 +00:00
Jon Chery 5d1a9853ea verify(P03): PASS — structural, behavioral, security, quality
---ci---
project: acdl
phase: 3
milestone: v1.26
status: verify
---
2026-08-19 00:35:51 +00:00
Jon Chery 03edd82d53 fix(P03 W6/W7): forge-agnostic token name in run_platform.sh + config (REQ-230)
The W6 'unset NOVA_GITEA_TOKEN' line in scripts/run_platform.sh tripped
the test_no_forge_mentions guard (REQ-230 forbids forge-specific names in
synced files). Renamed to NOVA_FORGE_TOKEN (forge-agnostic); .env.secrets
adds NOVA_FORGE_TOKEN as an alias; config.json scopes now map forge + gitea
-> NOVA_FORGE_TOKEN. scripts/rotate_spike_key.sh (excluded from the sync
scan) keeps the NOVA_GITEA_TOKEN backward-compat fallback for local runs.
Full suite green (844 passed).

---ci---
project: acdl
phase: 3
milestone: v1.26
status: execute
wave: W6
---
2026-08-19 00:20:19 +00:00
Jon Chery 9bac2685cb feat(P03 W7): secret rotation scheduled workflow (SPEC §5.9)
workflows-src/rotate-aws-key.yml — daily cron (0 0 * * *) + workflow_dispatch,
wraps scripts/rotate_spike_key.sh (uses NOVA_AWS_* static-key auth to IAM-
rotate the nova-spike-runner key; uploads the new key to the consumer's
Actions secret store; idempotent — deactivates the old key only after the
new propagates, verified by a post-PUT GET). Synced to .github + .gitea.
v0.2 scope: the mechanism exists (SPEC §5.9 — exists-not-ran); the v0.2
deploy uses the currently-active key. Documented in ARCHITECTURE.md §12.9.

The synced workflow file is forge-agnostic (REQ-230): forge base URL /
owner / consumer repo come from repository secrets (NOVA_FORGE_*,
NOVA_CONSUMER_REPO), not literals. rotate_spike_key.sh reads NOVA_FORGE_*
with NOVA_GITEA_* backward-compat fallback. sync_workflows.py PAIRS
extended to include rotate-aws-key.yml (was hardcoded to 3 pairs).

---ci---
project: acdl
phase: 3
milestone: v1.26
status: execute
wave: W7
---
2026-08-18 23:39:34 +00:00
Jon Chery 804c52aa90 docs(P00): revise plan — add P3 W0 (Gitea adapter) + W0.5 (kj substrate) + W6 (drift) + W7 (rotation) per SPEC-aws-deploy-platform-gaps
Folds SPEC §5.1/§5.2/§5.9 + §10 Q1 (resolved by evidence — Gitea Actions
rejects cross-repo uses:) into one P3 round (D-022 intent: cover all
platform gaps to avoid a second clarify round). W0 is the highest-
priority gap; W0.5 (already done) fixes the v1.25 skip-masked kj bug;
W6 fixes deploy.yml drifts (AWS_DEFAULT_REGION, ref v1.25, no raw
NOVA_AWS_*); W7 adds the rotation scheduled workflow (mechanism must
exist per SPEC §5.9). Must-haves updated: full suite green (the '170
baseline holds' claim was inaccurate — 7 pre-existing P2 failures
uncovered by W0.5, all fixed).

---ci---
project: acdl
phase: 0
milestone: v1.26
status: plan
---
2026-08-18 22:01:07 +00:00
Jon Chery a63c85bc51 chore(P02): compress .ciagent/ files — archive completed milestones + slim active context
Relocate completed-milestone history to .ciagent/archive/ (byte-identical
snapshots of PROJECT/REQUIREMENTS/ROADMAP/ARCHITECTURE pre-compression +
verbatim moves of REVIEW/AUDIT/VERIFY/PRE_MORTEM). Slim the in-place files
to retain only active-milestone (v1.26) + immediate-predecessor (v1.25)
context + durable vision/tenets/scope/RACI/capability-status/load-bearing
decisions. REGRESSION_REPORT.{json,md} stay in place (live read/write
targets of core/metrics/collector.py + core/regression_verify.py).

Working context: 11,164 → 4,152 lines (~63% reduction). Archive preserves
8,615 lines. Lossless via relocation + git history. No test regressions
(761 passed; same 3 pre-existing failures as baseline).

---ci---
project: acdl
phase: 2
milestone: v1.26
status: execute
lessons:
  - REGRESSION_REPORT.{json,md} are live operational files (read by
    core/metrics/collector.py + core/regression_verify.py) — must NOT be
    archived. Pre-flight grep for code references to candidate archive
    paths before any move.
  - test_no_purged_loaded_term scans .ciagent/PROJECT.md + CLARIFY.md +
    docs/ for 'penetrat' — slimmed files must not reintroduce it. Historical
    description of the purge ('removed the term ...') is safe in ROADMAP.
  - Git rename detection (R) works for pure file moves; snapshot-then-slim
    shows as A + M. Both preserve history.
---/ci---
2026-08-18 19:21:43 +00:00
Jon Chery 6a3d47e482 docs(P02): mark REQ-313/314/322 complete — update checkpoint + roadmap
P2 (consumer-contract-and-deploy) complete. REQ-313 (contract.yaml +
3 env variants), REQ-314 (deploy.yml .github+.gitea mirror), REQ-322
(DynamoDB L1 primitive) all delivered. Checkpoint advanced to
stage: complete. Consumer ROADMAP.md P2 marked complete (tag v1.25.2).

---ci---
project: nova-blockchain-exchange
phase: 2
milestone: v1.26
status: complete
phase_role: execution
tag: v1.25.2
requirements: [REQ-322, REQ-313, REQ-314]
---/ci---
2026-08-18 00:24:51 +00:00
Jon Chery d022ddcea6 docs(P02): reconcile checkpoint — P1 complete (v1.25.1), advance to P2 execute
---ci---
project: nova-blockchain-exchange
phase: 2
milestone: v1.26
status: execute
phase_role: execution
checkpoint: reconciled
---/ci---
2026-08-18 00:21:10 +00:00
Jon Chery ddf88202fc docs(P01): execute — v1.26 blockchain-core (REQ-310,311,312)
---ci---
project: nova-blockchain-exchange
phase: 1
milestone: v1.26
status: execute
phase_role: execution
requirements: [REQ-310, REQ-311, REQ-312]
---/ci---
2026-08-13 18:34:22 +00:00
Jon Chery 2ee541f40e docs(ship): P0 complete — v1.25.0 released (id 690)
---ci---
project: acdl
phase: 0
milestone: v1.26
status: complete
phase_role: pre_execution
tag: v1.25.0
release_id: 690
---/ci---
2026-08-12 21:21:23 +00:00