Jon Chery
|
5b5e24d535
|
docs(P5): render + verify — new diagrams, HTML, PPTX, tests pass (REQ-253)
Nova Slides Render / render (push) Failing after 59s
New mermaid diagrams (mmd + png):
- platform-pipeline.mmd/.png — slide 6 (two-stage policy scan: Checkov
static → plan → Wiz-or-Checkov → confidence → stage gate → apply)
- telemetry-live-ops.mmd/.png — slide 9 (CloudEvents → cold store →
PowerBI → live ops dashboard)
Re-rendered artifacts:
- nova-autonomous-cloud-delivery.html (S&P-themed, self-contained)
- nova-autonomous-cloud-delivery.pptx (20 slides: title + 18 main + 1
appendix; 21 media files embedded)
Verify:
- tests/test_slides_pipeline.py: 23 pass (18 main + 1 appendix slides; no
badges; no version in footer/title; no D-###/REQ-###/.py paths in
audience slides; old deck files removed; render script default renamed)
- tests/test_pipeline_contract.py: 10 stages (checkov-static + runtime-
policy-scan replace old checkov stage)
- tests/test_no_forge_mentions.py: pass
- tests/test_regression_cap023_024.py: CAP-024 deck structure verified
(18-19 slides, recap+ask, per-slide benefits)
- Full suite: 686 pass + 1 pre-existing attestation failure
(NOVA_ATTESTATION_SIGNING_KEY_ID unset; fails on main without v1.21
changes too)
- run_platform.sh --check-only: exit 0
---ci---
project: acdl
phase: 5
milestone: v1.21
status: execute
phase_role: execution
---/ci---
|
2026-08-11 14:17:06 +00:00 |
|
Jon Chery
|
707a7dbe9b
|
docs(P2): slides source-of-truth — rename + restructure + rewrite (REQ-245,248,249,252)
Nova Slides Render / render (push) Failing after 1m3s
Rename all 5 deck files nova-no-humans-platform* →
nova-autonomous-cloud-delivery* (source, marp, html, pptx, talking-points).
Rewrite the source of truth to 18 main + 1 appendix slides, 4-beat arc
(Problem → Solution → Proof → Roadmap + Ask). All 33 review notes applied:
- Slide 1 'The Problem' (items 3,4,5,7,9): broader problem framing — devs
writing terraform, destructive changes, AI-era 0-day pace, bandwidth
gaps, tribal knowledge/rockstar operator. No arc. No '18 capabilities
verified'. Not 'humans are the problem'.
- Slide 2 'Nova's Vision' (item 11): 'invisible' → 'visible' (operations
become visible — recurring theme); polish for technical audience.
- Slide 3 'Strategic Objectives + Anti-Goals' (items 12,13,14,15,16,17,
18): only Obj+Anti-Goals; provable trust = deterministic scripts
(functions without AI); ROI = 4 CTO metrics (Lead Time, Vuln Count,
MTTR, Spend); drop anti-goals 1,4,5; add 'not upstream dev platform',
'not PDLC replacement'; obj #4 = integration objective; reword benefit.
- Slide 4 'Scope' (item 29): moved up, refined.
- Slide 5 'RACI' (item 30): moved up; add Quality Engineering column;
reassign A from Platform → QE/SRE; rename Release Mgmt → SRE; split
release attestation (Quality attestation + Production readiness).
- Slide 6 'Pipeline' (item 20): Checkov on static code before plan;
Wiz-or-Checkov on plan; never both.
- Slide 7 'Decision Ledger' (items 21,22): drop D-121/122/132; 'AI
decisions = automated decisions'; value = immutable/queryable/
accountable, not sqlite/hash-chain.
- Slide 8 'Attestation Matrix' (item 23): drop bullets below table; add
Description column per concern; drop 'operator-supplied' label.
- Slide 9 'Telemetry & Live Ops' (item 25): expand on value; drop
D-120/125/126; expand on PowerBI live ops dashboard.
- Slide 10 'Decision Ledger + Attestation Coverage' (item 27):
mandatory by design; no prod change without either; queryable for
auditing; full traceability.
- Slide 11 'Cost & ROI': minor polish; 4 CTO metrics referenced.
- Slide 12 'What's Deferred' (items 10,19): remove all D-IDs; plain-
language blockers; no status column.
- Slide 13 'Roadmap to the North Star' (items 10,19): drop D-IDs; no
status column; timeframe-based roadmap.
- Slide 14 '12-Month Product Roadmap' (item 24): drop planned badges.
- Slide 15 'Quarter-by-Quarter' (item 24): drop badges.
- Slide 16 'Atelier (1/2)' (item 31): split — Skills + MCP server overview.
- Slide 17 'Atelier (2/2)' (item 31): split — agentic validation beyond
deterministic scanners + vendoring.
- Slide 18 'Recap + Ask': refresh recap to 4-beat structure.
- Appendix A1 'Metrics Glossary' (item 32): kept; theme CSS fix in P3.
- Global (items 6,10,24,2): tech-leadership benefits; no D-###/REQ-###/
.py paths in audience slides; no badges; no version in footer; final
'less is more' prose pass.
Removed: old Slide 10 (Capability Health), old Slide 12 (Zero-Touch),
old Appendix A2 (Operating Model & Cost). Slide 5 first table removed.
---ci---
project: acdl
phase: 2
milestone: v1.21
status: execute
phase_role: execution
---/ci---
|
2026-08-11 13:59:30 +00:00 |
|